Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.

Slides:



Advertisements
Similar presentations
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Advertisements

Token Bit Manager for the CMS Pixel Readout
E-link IP for FE ASICs VFAT3/GdSP ASIC design meeting 19/07/2011.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
ESODAC Study for a new ESO Detector Array Controller.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
MB4 New compared with MB3: Digital drivers / transformer drivers options 14 OPAMPS instead of 4 Thinner coaxial cables Shorter umbilical Heater coil integrated.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
Understanding Data Acquisition System for N- XYTER.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
A.A. Grillo SCIPP-UCSC ATLAS 10-Nov Thoughts on Data Transmission US-ATLAS Upgrade R&D Meeting UCSC 10-Nov-2005 A. A. Grillo SCIPP – UCSC.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Optical Readout and Control Interface for the BTeV Pixel Vertex Detector Optical interface for the PCI board –1.06 Gbps optical link receiver –Protocol.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
DEPT OF MODERN PHYSICS, USTC Electronics System of MC IHEP, Beijing ___________________________________________ Muon Group, USTC, Hefei.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
FEC electronicsRD-51 mini week, CERN, Sept Towards the scalable readout system: FEC electronics for APV25, AFTER and Timepix J.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
Clara Gaspar, December 2012 Experiment Control System & Electronics Upgrade.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Rutherford Appleton Laboratory Particle Physics Department 1 Serial Powering Scheme Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of RAL.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
High speed signal transmission Jan Buytaert. Topics Electrical standards: CML,LVDS, SLVS Equalization. Testbench of a readout slice. Vacuum feed-throughs.
Standard electronics for CLIC module. Sébastien Vilalte CTC
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Low Power GBT CMS Tracker Oriented Preliminary Design Specification A. Marchioro, P. Moreira Nov 2011.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
FSP progress update & camera concept Contents: Mechanical structure System components CCD sensor and circuit examples Hybrid concept IIC concept and tasks.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
LHCb Outer Tracker Electronics 40MHz Upgrade
DAQ ACQUISITION FOR THE dE/dX DETECTOR
The Data Handling Hybrid
Ivan Peric, Christian Kreidl, Peter Fischer University of Heidelberg
Markus Friedl (HEPHY Vienna)
Readout System of the CMS Pixel Detector
Iwaki System Readout Board User’s Guide
A few ideas about detector grounding and shielding D. Breton
Front-end electronic system for large area photomultipliers readout
Compilation of Dis-/Advantages of DC-DC Conversion Schemes
VELO readout On detector electronics Off detector electronics to DAQ
The digital read-out for the CSC system of the TOTEM experiment at LHC
Overview of T1 detector T1 is composed by 2 arms
The digital read-out for the CSC system of the TOTEM experiment at LHC
PID meeting Mechanical implementation Electronics architecture
SVT detector electronics
Presentation transcript:

Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University

P. Fischer, ziti, HD: dc coupled sensor readout2 Goal of this talk  Think about consequences of dc coupling for readout chip  Start a discussion on system issues (control, readout, supplies)  This is a first collection of thoughts – to be improved!  This talk: Sensor model Connecting CBMXYTERs in dc mode Fault tolerance approach Chip connections: Power, Slow/ Fast Control, Data Out Readout options: Some thoughts (also see Walter’s talk!)

P. Fischer, ziti, HD: dc coupled sensor readout3 Sensor Model: Segmentation implants bottom side implants top side optional punch through bias Double sided strip sensor subdivide into diodes one diode (vertical)

P. Fischer, ziti, HD: dc coupled sensor readout4 N3N3 Sensor Model: Equivalent Circuit (I) P1P1 P2P2 P3P3 N1N1 N2N2 N3N3 N2N2 N1N1 P3P3 P2P2 P1P1

P. Fischer, ziti, HD: dc coupled sensor readout5 Sensor Model: Equivalent Circuit (I)  Observation: Input on one side has no ‘partner’ on other side, it’s a mix of all other inputs (across FE-chips!)  Thinking of a differential input, the ‘partner’ is ill defined  Detector Signal is a current pulse in one of the diodes  To be more realistic, must: Add series resistances of implants / aluminum traces Add inter strip capacitors N3N3 N2N2 N1N1 P3P3 P2P2 P1P1 N3N3 N2N2 N1N1 P3P3 P2P2 P1P1 (not all caps on n-side shown)

P. Fischer, ziti, HD: dc coupled sensor readout6 Connecting DC coupled chips. (1/N possibilities) more analog digital DAQ more analog digital level shift HV decoupling HV power supply digital supply analog supply Hybrid on detector CavernOutside refer single ended signal to which ground here? feedback & leakage compensation analog supply

P. Fischer, ziti, HD: dc coupled sensor readout7 Many questions:  Decouple what w.r. to what?  Connect which grounds? Where? and how (R, L)?  How to connect power supplies? Is it allowed to connect grounds in cavern to save cables?  These issues are not related to dc coupling  Can be tested with NXYTER. Find out how other experiments have done. (This stuff is rarely in papers..)  Be prepared for several iterations  How to do the level shifting? optical fibers – elegant! optical couplers – slow! inductive couplers – slow! ac coupling cascodes – can also be used for analog signals (currents)

P. Fischer, ziti, HD: dc coupled sensor readout8 Discussion: Fault tolerance  Question: Is a daisy chain architecture excluded ? Depends on fault tolerance approach  Should we be prepared to operate a module with single non functioning chips? How ‘easy’ is a repair of a bad module (access in fixed target exp. is simple) When a chip dies, does this kill the module anyway ? (for instance by shorts in supplies, noise on sensor) How often does a chip die during operation?  Is fault tolerance ‘nice to have’ or ‘required’? This needs a discussion & decision  Note: a good burn-in may catch most ‘early failures’

P. Fischer, ziti, HD: dc coupled sensor readout9 IO Signals required  Supply voltages Connect chip grounds where? Connect power supply ground in counting room (‘loop’) or on hybrid (more cables)?  Slow control best have this independent of readout (→ read back via slow control) avoid bi-directional signal (simplify level shifting). This rules out I2C avoid daisy chains for fault tolerance (?) (this rules out JTAG) Compromise: Unidirectional bus with geographical address: clk, din, dout, load, (reset). Very simple interface.  Fast control (‘TTC’) clock, epoch marker (DLM), timestamp fast reset (can we use DLM?)  Data outputs  Monitoring of analog signals level shifting difficult. Could use cascodes for currents. Best use on-chip ADC and digital readout

P. Fischer, ziti, HD: dc coupled sensor readout10 Readout. Preliminaries.  Use as few cables as possible → fill max. bandwidth  Must provide a concept to cope with different occupancies on different chips cabledata ratedistanceConnectorsdriver optical fiber>2.5Gbpsinfiniteclumsy or special Laser (clumsy), serializer coax>2Gbps>10msmallon chip, serializer CAT7 LVDS250Mbps10mclumsyon chip, clk & data Custom LVDS 100Mbpsfew m (?)smallon chip, clk & data

P. Fischer, ziti, HD: dc coupled sensor readout11 Optical Serial Data Transmission  Assume we have it somewhere in the path for level shift  Components required: Protocol FSM 8B/10B Serializer LVDS/CML output Laser Driver Laser Diode Connector fiber Laser Package Chip1 Chip2 Mechanics digital analog difficult Provided by SFP package! available available (?)

P. Fischer, ziti, HD: dc coupled sensor readout12 Readout 1: Event Builder on Module  GBT will be developed by CERN. May be suitable.  Probably a bit overkill.  Still needs many extra radhard components FE GBT Hybrid on detector Cavern Outside Laser Driver PiNTIA clock, epoch optional FPGA 80 Mbps 4.8 Gbps

P. Fischer, ziti, HD: dc coupled sensor readout13 Readout 2: Event Builder in Cavern  Many ‘LVDS’ cables  Number of cables = number of chips FE Hybrid on detector Cavern Outside clock, epoch FPGA ??? Mbps 10 m (Walter)

P. Fischer, ziti, HD: dc coupled sensor readout14 Readout 3: Share cables  Equalize hit rates between chips with short parallel links  Number of cables limited by data rate.  May be adapted to Module Multiplicity FE Hybrid on detector Cavern Outside clock, epoch FPGA ??? 250 Mbps

P. Fischer, ziti, HD: dc coupled sensor readout15 Readout 4: Integrated serializer, optical  Pass all hits to one (or more) ‘master’ chips  Serializers on other chips are disabed  Still Laser Driver, rad hard Laser, Package required FE Hybrid on detector Cavern Outside clock, epoch optional FPGA ??? ser Laser Driver

P. Fischer, ziti, HD: dc coupled sensor readout16 Readout 5: Integrated serializer, coax  No extra components needed on Hybrid  Receiver needed (?)  Cost of cables? FE Hybrid on detector Cavern Outside clock, epoch ??? ser FPGA drv. coax cable rec.

P. Fischer, ziti, HD: dc coupled sensor readout17 Some conclusions  Sensor model is complicated. See what we really need.  I2C is bad for level shifting  Analog monitoring is difficult  Ground & Power connections will be big issue as usual Should try some basic configurations with NXYTER, if possible  Best readout concept depends on data rates radiation levels distance to shielded cavern (=10m)  Look at Walter’s numbers & suggestions!

P. Fischer, ziti, HD: dc coupled sensor readout18 To do  Evaluate speed of custom LVDS driver (HD)  Look for rad hard Laser driver / package / connector (→ CERN)  Try readout chain: Chip → Coax → FPGA  Elaborate on chip → chip protocol  Study minimum implementation of a FPGA compatible serial link (in HD)