Electrical Integration WBS 1.8.2 Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks2 (on order) Bias Voltage Rack1 (shared.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
FVTX Review Nov FVTX Review Homeworks. FVTX Review Nov When is Project Complete; how will it be determined?
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Robert Pak, FVTX Annual Review, Nov WBS Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Technical Design for the Mu3e Detector
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX

FVTX Review, November 16th, Electronics Integration Personnel –Eric J. Mannel: Electronics Project Engineer for both VTX and FVTX –Martin Purschke: PHENIX DAQ Coordinator –Steve Boose: DAQ Deputy Coordinator, Hardware –Ed Desmond: DAQ Deputy Coordinator, Software –FVTX Subsystem Managers and Electrical Engineers

FVTX Review, November 16th, Electronics Review Process Reviews held to date: –FPHX-1 Design reviews 2008 –Released FPHX-2 production –FPHX-2 Design reviews 3/2009 & 9/2009 –Released chip for engineering run: “Given the schedule constraints and the need to construct the detector system in a timely manner, preparation for the fabrication of the chip should proceed.” –HDI Prototype review held 10/2009 –Recommend 2 nd round rapid prototype: “It is the recommendation of the reviewers that the FVTX group should look into the delivery of a small number of preproduction HDIs,… with a quick delivery, along with a first prototype of the interconnect cable.”

FVTX Review, November 16th, Electronics Review Process –FVTX Overall Electronics Design Review Held in 8/2008 to review the overall design of the FVTX electronics chain. Summary report with suggestions and concerns was submitted to the FVTX group in August –Preliminary VTX/FVTX C-AD Safety Review Held in 6/2009 to review the overall design of the FVTX electronics chain. No significant electrical safety issues were found Still waiting for written report from C-AD

FVTX Review, November 16th, Electronics Review Process –Pending Design Reviews Follow up HDI review- 2Q FY10 ROC Design and Layout- 2Q FY10 FEM Design and Layout- 2Q FY10 –Pending Safety Reviews Preliminary electrical power design- 3Q FY10 Final Safety and Operational Readiness Review after installation.

FVTX Review, November 16th, Electronics DAQ Integration PHENIX DAQ/ONCS Integration –Coordinate meetings with PHENIX DAQ and ONCS groups. –Work with design teams to make sure that all interfaces are compatible with PHENIX DAQ and online systems. –Initial meeting in January 2008 to review the general concept. –Follow up discussion January 2009, November –Additional meetings occur as required.

FVTX Review, November 16th, Power and Ground Power and Ground Plan –Common plan for VTX and FVTX –VTX and FVTX electrically isolated from each other and other PHENIX systems. –Shield around beam pipe and enclosure. –Based on star ground plan. –Single point connection to PHENIX clean ground –Optical connections to Rack Room/DAQ

FVTX Review, November 16th, Global Power and Ground StriPixel Subsystem FVTX North FVTX South Beam Pipe Shield Pixel Subsystem Space Frame PHENIX Clean Ground Isolated Returns StriPixel Power FVTX N Power FVTX S Power Pixel Power Safety Ground Magnet Bridge Fiber Optic PIXEL FEMs StripPixel FEMs FVTX FEMs RackRoom VTX/FVTX Global Power and Ground Plan

FVTX Review, November 16th, FVTX Power and Ground Power for ¼ FVTX

FVTX Review, November 16th, Power Systems When possible use same vendor for components Wiener/ISEG system for Bias (See backup slides) –Evaluation model tested »Mar-May 2008 (Used for VTX Pixel bias test) »July-Sept 2008 (Software integration testing) »DAQ/ONCS group concludes that it will be easy to integrate into PHENIX PHENIX standard low voltage power distribution system (See backup slides). Used for MuTrig Upgrade Additional AC ground isolation for wedge analog, digital and bias power

FVTX Review, November 16th, Wedge Power Isolation Bias Isolation Low Voltage Isolation Input from Bulk LV Supply Input from Bias Supply Output to Wedge Output to Wedge

FVTX Review, November 16th, System Interlocks Global VTX/FVTX interlock system –Cooling subsystem –Power subsystems (LV/Bias) –Environmental monitoring Temperature, Humidity, Flow (Coolant/N 2 ) Active monitoring provides early alert Hardware failsafe, active enable for cooling and power (LV and Bias). Full design in conjunction with VTX to begin in 1Q-CY2010

FVTX Review, November 16th, System Interlocks

FVTX Review, November 16th, DCM-2 Status DCM-2 –Upgrade to PHENIX DAQ interface. –Optical fiber connections. –8/10 bit encoding – 1.6 Gbps. –Optical interface complete. Implemented as daughter board using current DCB. Operational for the HBD and MuTrig Upgrade. Available for system chain test –Funding (PHENIX R&D) in place to complete the design work. –Preproduction testing currently in progress –Fabrication scheduled to be finished 3Q-FY10

FVTX Review, November 16th, Summary Review Procedures in place and being implemented. Preliminary discussion have occurred with the PHENIX. DAQ/ONCS group to insure seamless integration into PHENIX. Grounding plan has been developed for the VTX/FVTX effort. Working with the PHENIX integration group on location of racks, cable routing, patch panels, etc. Power system design in progress DCM-2 development on track. Close communication with FVTX mechanical and integration engineers.