MUON piquet report 18/9 -24/9 2012 Nikolai Bondar.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Walls crates cables gas chambers electronics CERN adb.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
HV system migration to USB interface Presented by Korolev M.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Problems with Muon System N. Bondar O.Maev
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
Examples and disciptions for measurements On pixel and strip sensors.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
1 Pad #0 IN WIRE PAD NUMBER 23 CARDIAC OUT 0 1 Output Connector Pad #1Pad #3Pad #2Pad #5Pad #4 HV Side Q1-M4-R4 Cabling Gas Side Cable.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Chronology - I  Year Jan. 2008: from time to time short circuits failures in chains supplying low voltage to C-W bases (either +6V or -6V, ~5 lines.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
DCal-ALICE integration and installation plan and status A. Tauro.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
S A Griffiths CM42 June 2015 Electrical & Control.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
BPMs in the new Dump Line
DT Infrastructure: LV, HV, Gas
Noise on chambers M1R4 N.Bondar
M. Alexeev on behalf of Torino TIGER Test Group
Maki KUROSAWA VTX Group 2014 Feb 20
Pierluigi Paolucci - I.N.F.N. Naples
Track Finder Crate, Backplane and Parts
KFA10 status 03/06/2019 Currently:
Presentation transcript:

MUON piquet report 18/9 -24/ Nikolai Bondar

17/9- 21/9 TS week Main task for TS 1.HV chamber conditioning 2.Replacement of faulty RDB#04 connected with M3C13CM3C13C _GapB 3. Try to fix the hole in track map in Q4M4R2 _1, chs M4C18A3Q4M4R2 M4C18A3 4. Increase LV on FEBs everywhere by mV 5. Replace LV fuses for FEBs in M3CR1M3CR1 6. Installation of a ferrite cable filters to suppress the noise on chamber 7. Replacement O-rings in water cooling system

1.HV chamber conditioning Tested 40 chambers, 160 gaps 150 gaps – OK 10 gaps have some problems See details at 17/9- 21/9 TS week

2. Replacement of faulty RDB#04 connected with M3C13C _GapBM3C13C - Done 3. Try to fix the hole in track map in Q4M4R2Q4M4R2 _1, chs M4C18A3M4C18A3 - Tested all connection from chamber to IB and from IB to ODE. No problems were found. 4. Increase LV on FEBs everywhere by mV - LV increased on C side everywhere and on A side only M23, R1, R2 Many chambers on R1, R2 and some on R3,R4 need to adjust threshold! 17/9- 21/9 TS week

5.Replace LV fuses for FEBs in M3CR1M3CR1 Actually we only refreshed connections of the fuses by re-plug the same fuse. It was done at C-side everywhere and at A-side only M23 R1,R2 Found 2 burned fuses. 6.Installation of a ferrite cable filters to suppress the noise on chamber. Installed 22 filters on M5-back. All chambers absolutely quit. Waiting for beam to do more accurate test. Need order more filters! 17/9- 21/9 TS week

7.Replacement O-rings in water cooling system We had a water leak at A-side inside the rack two times during month August - September period. With expert assistance we understood that the hose joint to the rack cooling circuit was done not precisely correct. Final decision – Reconnect two racks on A-side in accordance of all recommendation Done Improve water leak sensors position to be more sensitive Done Keep spare part for emergency in case of leak. Done Two spare pieces are in the piping toolbox 17/9- 21/9 TS week

Two days were devoted to adjust threshold on the chambers The thresholds were set by hand with an uncertain accuracy. Needs threshold scan! Found problems: Many chambers were without voltage stabilizers (input voltage less than required). Expected reason – increased voltage drop in the fuse contacts. Many chambers, in particular central regions, are calculating extra pulses during read out scales inside CARDIAC. Expected reason – ground problem on the chambers. 22/9- 23/9 after TS week