KFA10 status 03/06/2019 Currently:

Similar presentations


Presentation on theme: "KFA10 status 03/06/2019 Currently:"— Presentation transcript:

1 KFA10 status 03/06/2019 Currently:
Pumping – ion pumps OK, TPG connected SF6 circuit finished, HV cables connected – leak test on-going HV this week

2 MKDV PFN and Switches status 03/06/2019 – VS, PvT, EC, LD
Present test conditions: Magnet conditioning long pulse 38 kV Actions from sbdsPTM vs. nPTM review Produce two new sbdsPTM pre-series units  in production Optimise nPTM triggering circuit impedance  Done Define equivalent operation voltage for same SEB rate  Done Reduce IPOC measurement noise at the beginning of the pulse  Done Acquire rise time vs voltage/energy with PTM voltage 3.5 kV  Done Acquire rise time vs voltage/energy with PTM voltage 3.7 kV Done PFN front-cell optimisation  ready, this week Install VRD resistors + cards  ready, this week Perform comparative eScan for both type of PTMs (06/2019)  not ready (waiting sbdsPTM)


Download ppt "KFA10 status 03/06/2019 Currently:"

Similar presentations


Ads by Google