Status of the FAIR Project Boris Sharkov FAIR Scientific Director GSI 12.04.2010 AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia.

Slides:



Advertisements
Similar presentations
Status of the FAIR Project Boris Sharkov FAIR Scientific Director (des.) NuPECC Madrid AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia.
Advertisements

FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
September 19, 2006I. Augustin, GSI at PHIBADE 2006 Status of the FAIR Project I. Augustin FAIR Coordination Group GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
FAIR March 20, 2007 D. Krämer GSI/FAIR Division Technical Status: status of layout status of civil engineering items under current discussions status of.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
Beam Dynamics Layout of the FAIR Proton Injector Gianluigi Clemente, Lars Groening GSI, Darmstadt, Germany Urlich Ratzinger, R.Tiede, H.Podlech University.
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
International FAIR Boris Sharkov FAIR / MEPhI Scientific Managing Director, Lomonosov MSU 2015 Sweden FranceIndia Finland GermanyPoland UK Romania Russia.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Chinese Contributions to FAIR Hushan Xu Institute of Modern Physics, CAS, Lanzhou
Lab. Director’s Meeting IHEP, Protvino, Russia, January 2008 D. Reistad, The Svedberg Laboratory, Uppsala University.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
Contents: -GSI organization structures -Tasks of GSI (accelerator) -Status of evaluations / technical developments -Overview -Note : (only) accelerator.
Status of the international FAIR Project Horst Stöcker GSI Helmholtzzentrum fuer Schwerionenforschung Hard probes Eilat, October 2010 AustriaIndiaChina.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany PANDA Collaboration, Giessen – 18 March 2014 Status and News from FAIR.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Status of the FAIR Project
ESS Innovation Procurement Workshop
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
Status of LEB J. Gerl GSI – Darmstadt, Germany NUSTAR Week 2011
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
FAIR – the Universe in the labororatory
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
and collaboration with France
Presentation transcript:

Status of the FAIR Project Boris Sharkov FAIR Scientific Director GSI AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia Saudi Arabia

B. Sharkov2 Research Communities at FAIR 100 m Nuclear Structure & Astrophysics with rare isotope beams, x and excellent cooling High EM Field (HI) _ Fundamental Studies (HI & p) Applications (HI) Plasma Physics: x600 higher target energy density 600kJ/g Nuclear Matter Physics with GeV/u HI beams, x1000 Hadron Physics with antiprotons of GeV Special Features: 50ns Bunched beams Electron cooling of secondary beams SC magnets fast ramping Parallel operation SIS 100/300 HESR Super FRS NESR CBM HADES FLAIR CR- RESR Rare Isotope Production Target Antiproton Production Target

B. Sharkov3 Rationale for new Modularized Start Version (WP) in 2009  a detailed cost estimate for CC presented by architects  a new cost estimate in 2009 for the accelerator complex  Detailed list of site related construction costs was worked out  firm commitments of FAIR Member States M€ !  Germany and State of Hesse announced to cover "site-dependent" construction costs outside FAIR project budget M€ !

B. Sharkov4 Development of Project Staging 2003Recommendation by WissenschaftsRat – FAIR Realisation in three stages 2005 Entire Facility Baseline Technical Report 2007 Phase A Phase B SIS Module 0 SIS100 Module 1 expt areas CBM/HADES and APPA Module 2 Super-FRS fixed target area NuSTAR Module 3 pbar facility, incl. CR for PANDA, options for NuSTAR Module 4 LEB for NuSTAR, NESR for NuSTAR and APPA, FLAIR for APPA Module 5 RESR nominal intensity for PANDA & parallel operation with NuSTAR and APPA SIS18 Proton Beamline Module 6 SIS300 HESR Cooler ER Modularized Start Version

Basic Criteria : Outstanding research opportunities should be offered to all four scientific pillars of FAIR by the Modularized Start Version B. Sharkov5

6 Module 0: SIS100 and connection to existing GSI accel.

B. Sharkov7 Module 1: Experimental areas Module 0: SIS100 and connection to existing GSI accel.

B. Sharkov8 Module 2: Super-FRS Module 1: Experimental areas Module 0: SIS100 and connection to existing GSI accel.

B. Sharkov9 Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) Module 2: Super-FRS Module 1: Experimental areas Module 0: SIS100 and connection to existing GSI accel.

B. Sharkov10 Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) Module 2: Super-FRS Module 1: Experimental areas Module 0: SIS100 and connection to existing GSI accel. Module 4: low energy RIB and low energy antiprotons

B. Sharkov11 Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) Module 2: Super-FRS Module 1: Experimental areas Module 0: SIS100 and connection to existing GSI accel. Module 4: low energy RIB and low energy antiprotons Module 5: RESR storage ring P+ beamline ABM Hall

B. Sharkov12 Module 3: High-energy antiprotons (p-linac, pbar-target, CR, HESR) Module 2: Super-FRS Module 1: Experimental areas Module 0: SIS100 and connection to existing GSI accel. Module 4: low energy RIB and low energy antiprotons Module 5: RESR storage ring Modularized Start Version

B. Sharkov13 PANDA Science with the Modularized Start Version CBM/HADES NuSTAR APPA

14 Experimental equipment (FAIR Modules 0,1) Cave with HADES and a CBM start version e+e- measurement (HADES-RICH) Hadron/Multistrange states CBM magnet +STS μ+μ-: Muon chambers Cave with CBM full version Open charm: MVD Dilepton study: MuCh/RICH Hadrons: STS/TOF Centrality selection: PSD HADES: existing setup at SIS18 CBM: New instrument with ultra radiation-hard and high-rate detectors, free-streaming electronics, online event selection

B. Sharkov15 FAIR Work Packages

International Partner 1 WP 1 International Partner 3 WP 3 International Partner 2 WP 2 International Partner n WP n Consortium (represented by Consortium Leader) form FAIR GmbH

Proton Linac Overview 45 m Beam energy Beam current (op.) Beam current (des.) Beam pulse length Repetition rate Rf-frequency Tot. hor emit (norm.) Tot. mom. spread Linac length 70 MeV 35 mA 70 mA 36 µs 4 Hz MHz 2.1 / 4.2 µm ≤ ± ≈ 35 m French ParticipationTotal Invest : 1.7 M€

B. Sharkov18 Cost Estimate Modules 0-3 (Price Basis 2005) Total accelerator and personnel Modules Total civil construction Modules Experiment funding78 FAIR GmbH personnel and running costs47 Grand Total Modules all values in M€

B. Sharkov19 Firm Commitments FAIR CountriesTotal declared Contribution (k€) Austria China Finland France Germany Great Britain Greece India Italy Poland Romania Russia Slovenia Slovakia Spain Sweden Total Firm Commitments not firm for the first batch Kingdom of Saudi-Arabia signed the Declaration to contribute at least 1 % Primeminister Putin signed. Officially publicized last week.

B. Sharkov20 Finance Summary Cost of Modularized Start Version = 1027 M€ Firm funding commitments of FAIR Partners = 1039 M€ Modularized Start Version secures a swift start within the current funding commitments

B. Sharkov21 Evaluation Board 16 October The Modularized Start Version is the right way to proceed. 2.The project is more focussed and is in even better shape. 3.We should now start as soon as possible! The Green Paper outlines the path to achieve this goal

B. Sharkov22 Roadmap +1 year  Start of construction activities 2010/11 +1 year  Schedule is driven by civil construction  Aim for earliest commissioning of accelerators and respective experiments +1 year

Road Map FAIR Site & Buildings Handing in of preplanning documents to hbm Clarification of user requirements Modularized Start Version (MSV) Start revised preplanning for MSV Expected approval of revised planning for MSV Preparation of documents for building permit Expected approval for (partial) building permit Start site preparation (clearing trees) Award contracts on civil construction work lot 1 … 4 Completion of civil construction work lot 1 … 4 Start installation of accelerators and detectors

B. Sharkov24 FAIR will open a new era in hadronic, nuclear and atomic research as well as in applied science. The Green Paper outlines the path to achieve this goal. The Modularized Start Version provides an outstanding and world-leading research program for all scientific FAIR communities.

SIS18upgrade Program h=2 acceleration cavity for faster ramping Scrapers and NEG coating for pressure stabilization Injection system for low charged state heavy ions Charge separator for higher intensity and high quality beams The SIS18upgrade program: Booster operation with low charge state heavy ions Power grid connection

B. Sharkov26 Conclusions  Based on recent cost estimates and firm commitments of FAIR Member States the Modularized Start Version is elaborated  Modules 0-3 ensure a physics programme that is unique, competitive with great discovery potential  All FAIR science communities can perform excellent physics from early on  The facility can be smoothly upgraded towards the full version of FAIR (modules 4,5,6)  Setup of the international FAIR company proceeds in parallel

B. Sharkov27 Zeitplan für die Gründung der FAIR GmbH KW1: Fertigstellung der Rechtsdokumente KW8: Dokumente von Auswärtiges Amt an andere Außenministerien versandt KW13: Alle Übersetzungen zurück beim Auswärtigen Amt KW19: Alle offenen Fragen der Übersetzungen bilateral gelöst KW22: Alle Rechtsdokumente in den fünf Vertragssprachen verfügbar KW32: Formale Zustimmung aller Partnerländer KW33: Übersetzerkonferenz KW37: Formelle Unterzeichnung der Konvention KW38: Gründung der FAIR GmbH

B. Sharkov28 Mittelfristige Zeitplanung Q1 Q4Q3Q2Q1 Q4Q3Q Vorplanung Module Beginn Genehmigungsplanung Einreichung Bauantrag (Erforderlich: Deckungszusage BMBF, Hessen, nicht-deutsche Partner!) Teilbaugenehmigung erwartet ( Termin-Rücksprache mit Behörden unverbindlich ) Beginn Ausschreibungen Baulose 1 – 4 Baubeginn (Bezugsfähigkeit der Gebäude in 2016) Beschreibung der Arbeitspakete für die Beschleuniger abgeschlossen Verträge über Vorserienfertigung zentraler Beschleunigerkomponenten Memoranda of Understanding der Experimente

SIS-300 Progress Continuing efforts for R&D Meeting in Genova Meeting in Genova INFN + GSI + FAIR about prototype curved dipole magnet April 2010 SIS-300 Pre-consortium meeting in GSI IHEP + GSI + INFN Discorap-Project by INFN Magnet finished in 2010

Board of FAIR Collaborations founded APPA, CBM, NuSTAR, PANDA: two representatives each APPA, CBM, NuSTAR, PANDA: two representatives each discuss common issues (e.g. research and funding) discuss common issues (e.g. research and funding) initiate joint activities initiate joint activities Contact your funding agencies! Raise more money for your experiment ! Raise more money for your experiment !

B. Sharkov31

B. Sharkov32 FAIR facility BTR 2005