NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY.

Slides:



Advertisements
Similar presentations
Lockout/Tagout Training: 29 CFR Lockout Tagout Standard
Advertisements

BIDMC EH&S Dept1 Lockout/Tagout Training Proper Lockout Procedure BIDMC EC 60 Policy A teaching hospital of Harvard Medical School.
Elements of a Lockout / Tagout Program BWC Division of Safety & Hygiene.
Lockout/Tagout (Control of Hazardous Energy) Suzanne Reister/Paula Vanderpool North Central ESD /7110.
De-energization and Lockout
Introduction Most accidents are caused by the uncontrolled release of hazardous energy. Many of these accidents can be prevented by proper lock-out/tag-out.
Lockout/Tagout for Injection Molding
Lockout/Tagout (LOTO):
Presented by Environmental Health and Safety
LOCKOUT/TAGOUT.
Copyright  1999 Business & Legal Reports, Inc. BLR’s Safety Training Presentations Control of Hazardous Energy (Lockout/Tagout) 29 CFR
Lockout and Tagout.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Lockout/Tagout Authorized Employee. What Is Hazardous Energy? –Often invisible –Can be hydraulic or mechanical –Live or stored –Moving machine or equipment.
Lockout-Tagout (Control of Hazardous Energy) This training program is designed to inform management of the requirements of the Lockout-Tagout Program for.
Lockout/Tagout (The Control of Hazardous Energy)
Controlling Hazardous Energy
Lockout - Tagout Control of Hazardous Energy CFR
Copyright  1999 Business & Legal Reports, Inc. BLR’s Safety Training Presentations Control of Hazardous Energy (Lockout/Tagout) 29 CFR
Lockout/tagout Authorized employees
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
Lockout/Tagout Authorized Employee Slide Show Notes
Oklahoma State University EHS Lockout/Tagout Standard Proper Lockout Procedure.
Trindel Insurance Fund
Control of Hazardous Energy Lockout/Tagout 29 CFR
Copyright  Progressive Business Publications Control of Hazardous energy Blue Ridge Safety Association Safety Training Presentations.
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
1 29 CFR THE CONTROL OF HAZARDOUS ENERGY.
1/05 School Safety Training Control of Hazardous Energy (Lockout/Tagout) WAC
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Lock-Out / Tag-Out Types of Energy Types of Energy Electrical Electrical Mechanical Mechanical Chemical Chemical Thermal Thermal Hydraulic Hydraulic.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Lockout/Tag Out Guidelines Procedures to protect employees and co-workers.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
LOCKOOUT/TAGOUT b THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lockout/Tagout.
Basic Lockout Guidelines
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
Procedures to protect employees and co-workers Basic Lockout Guidelines Procedures to protect employees and co-workers.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
School Safety Training Control of Hazardous Energy (Lockout/Tagout) WAC
Control of Hazardous Energy 29 CFR Lockout/Tagout Basics? Regulatory requirements Energy Isolation Devices Energy Sources Affected, Authorized.
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
1 Lockout/Tagout MEETING THE STANDARD MEETING THE STANDARD.
1 Lockout/Tagout “The Control of Hazardous Energy” LOTO Lockout Tagout.
LOCKOUT – TAGOUT TRAINING PROGRAM. Lockout/Tagout + The OSHA Standard for the Control of Hazardous Energy (Lockout/Tagout) 29 CFR covers the.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
29 CFR  In this course, we will cover the following:  The need for energy control procedures  Methods of lockout / tagout  Employer’s responsibilities.
Lockout/tagout for authorized employee
LOCKOOUT/TAGOUT THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lockout Tagout Program
Lockout/Tagout Standard
Lock Out / Tag Out The Control of Hazardous Energy
The Control of Hazardous Energy (Lockout-Tagout)
Lockout/tagout Refresher training
Energy Control Procedures Lockout/Tagout 29 CFR
The Control of Hazardous Energy (Lockout-Tagout)
Lock Out Tag Out Michael Vangeli 11/15/2018.
Control of Hazardous Energy
Presented by Environmental Health and Safety
Lock Out Tag Out.
Lockout/tagout Refresher Training
LOCKOUT/TAGOUT By: Kory Hildebrand.
Presentation transcript:

NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY

NWACC Business & Industry Workforce Development Institute J- 2 COMMON QUESTIONS ABOUT LOCKOUT/TAGOUT WHAT IS LOCKOUT/TAGOUT? IS IT NECESSARY? WHAT ARE LOCKS AND TAGS AND HOW ARE THEY USED? WHO IS RESPONSIBLE FOR THEM? ARE WRITTEN PROCEDURES REQUIRED? WHAT ABOUT TRAINING? WHAT IS THE PROCEDURE FOR LOCKOUT/TAGOUT?

NWACC Business & Industry Workforce Development Institute J- 3 LOCKOUT/TAGOUT IS THE CONTROL OF HAZARDOUS ENERGY DURING SERVICING AND MAINTENANCE OF OF MACHINES AND EQUIPMENT. UNEXPECTED ENERGIZATION OR RELEASE OF STORED ENERGY CAN INJURE AND KILL. 29 CFR (c) requires the employer to establish an energy control program if the danger of unexpected release of energy exists

NWACC Business & Industry Workforce Development Institute J- 4 HUNDREDS OF WORKERS ARE KILLED AND HURT EACH YEAR MAINTAINING EQUIPMENT! CASE STUDY: An employee cleaning scrap from beneath a large shear is is decapitated when another employee pushes the control button. There is no procedure for lockout of the shear. CASE STUDY: An electrician is electrocuted while performing maintenance on a motor control circuit. A procedure existed but the electrician wanted to save time, and did not follow it.

NWACC Business & Industry Workforce Development Institute J- 5 LOCKS: IN LOCKOUT/TAGOUT, A LOCK IS USED FOR HOLDING AN ENERGY ISOLATING DEVICE SUCH AS A VALVE OR SWITCH, IN A POSITION THAT WILL PREVENT ACTIVATION. LOCKS MUST USE KEYS OR COMBINATION LOCKS LOCKS AND TAGS ARE UNDER THE EXCLUSIVE CONTROL OF THE EMPLOYEES PERFORMING THE WORK !

NWACC Business & Industry Workforce Development Institute J- 6 TAGS: IN LOCKOUT TAGOUT, A TAG IS A WARNING PLACED ON OR NEAR THE ENERGY ISOLATING DEVICE TO ALERT OTHERS NOT TO OPERATE THE DEVICE. DO NOT START DO NOT OPEN DO NOT CLOSE DO NOT ENERGIZE DO NOT OPERATE DO NOT START DANGER

NWACC Business & Industry Workforce Development Institute J- 7 TAGS CANNOT BE USED WITHOUT LOCKS UNLESS IT IS INFEASIBLE OR HAZARDOUS TO LOCKOUT AN ISOLATING DEVICE. SOME POINTS ABOUT TAGS TAGS MUST BE STANDARDIZED AS TO AT LEAST ONE OF THE FOLLOWING: FORMAT, COLOR, SHAPE, SIZE, TYPE. TAGS MUST BE CLEARLY VISIBLE AND DISTINCTIVE. TAGS MUST BE DESIGNED TO DETER UNAUTHORIZED REMOVAL. ATTACHMENT MEANS MUST BE NON-REUSABLE.

NWACC Business & Industry Workforce Development Institute J- 8 IF A LOCK CANNOT BE USED DUE TO INFEASIBILITY OR INCREASED HAZARD, ONE ADDITIONAL SAFETY MEASURE MUST BE USED. EXAMPLES: REMOVE AN UPSTREAM DISCONNECT. BLOCK AN UPSTREAM DISCONNECT. LOCK OUT AND TAG UPSTREAM DISCONNECT. GROUND A CIRCUIT BEING WORKED ON.

NWACC Business & Industry Workforce Development Institute J- 9 Are Written Procedures Required? n Written procedures are generally required (c) n Procedures must include scope, purpose, authorization, techniques, rules, responsibilities and training. n Annual audits and inspections are required to verify the effectiveness of the procedures unless they are used (c)(6)

NWACC Business & Industry Workforce Development Institute J- 10 EXCEPTIONS TO THE RULE: All the following must be true No potential for stored energy exists. There is a single readily identifiable energy source. Isolating and lockout completely deenergizes the equipment. A single lock will lockout the equipment. The equipment is isolated during the work performed. The lock is controlled by the person doing the work. No hazard is created for others. No history of unexpected startup for the equipment exists.

NWACC Business & Industry Workforce Development Institute J- 11 DEFINITION: AN AUTHORIZED EMPLOYEE IS AN EMPLOYEE WHO PERFORMS OR PARTICIPATES IN THE LOCKOUT/TAGOUT OPERATION DEFINITION: AN AFFECTED EMPLOYEE IS AN EMPLOYEE WHO MUST OPERATE THE EQUIPMENT DURING LOCKOUT/TAGOUT OR WHO IS IN THE VICINITY BOTH AUTHORIZED AND AFFECTED EMPLOYEES MUST BE APPROPRIATELY TRAINED.

NWACC Business & Industry Workforce Development Institute J- 12 TRAINING AND COMMUNICATION (c)(10) Training and communication must take place before Lockout/Tagout can begin. All employees involved must have necessary skills. Other employees in the area may require some training. Training must cover: required parts of energy control program, elements of applicable procedures, applicable Safety Related Work Practices.

NWACC Business & Industry Workforce Development Institute J- 13 LOCKOUT/ TAGOUT PROCEDURE 29 CFR (c)

NWACC Business & Industry Workforce Development Institute J- 14 Preplanning Isolation & Control Procedure Restart Procedure GENERAL LOCKOUT/TAGOUT PROCEDURE Step 1 Step 2 Step 3

NWACC Business & Industry Workforce Development Institute J- 15 IDENTIFY TYPES & AMOUNTS OF ENERGY SOURCES IDENTIFY INDIVIDUAL EQUIPMENT & LOCATION LOCATE & IDENTIFY DISCONNECT & ISOLATING DEVICES VERIFY/DETERMINE POWER SHUTDOWN & POWER UP PROCEDURES NOTIFY ALL AFFECTED EMPLOYEES PREPLANNING BLOCK DIAGRAM STEP 1 STEP 2 STEP 3 STEP 4 STEP 5

NWACC Business & Industry Workforce Development Institute J- 16 STEP 1 IDENTIFY TYPES & AMOUNT OF ENERGY SOURCES TYPES OF ENERGY: MECHANICAL, ELECTRICAL, HYDRAULIC, THERMAL, AIR, CHEMICAL, ETC. STEP 2 IDENTIFY INDIVIDUAL EQUIPMENT & LOCATION ELECTRICAL MOTORS, MACHINES, CONTROLLERS, DISTRIBUTION PANELS, ETC.

NWACC Business & Industry Workforce Development Institute J- 17 STEP 3 LOCATE AND IDENTIFY DISCONNECTS AND ISOLATING DEVICES CIRCUIT BREAKERS, SWITCHES, VALVES, BLOCKS, GATES, ETC. STEP 4 POWER SHUTDOWN AND POWER UP PROCEDURES SEQUENCE PROCEDURES, PROCESS CONTROL DIAGRAMS, SINGLE ELECTRICAL ONE LINE DIAGRAMS, ETC.

NWACC Business & Industry Workforce Development Institute J- 18 STEP 5 NOTIFY ALL AFFECTED EMPLOYEES ENSURE ALL PERSONNEL AND UNNECESSARY EQUIPMENT ARE REMOVED.

NWACC Business & Industry Workforce Development Institute J- 19 SHUTDOWN, ISOLATION & CONTROL PROCEDURE BLOCK DIAGRAM PREPARATION FOR SHUTDOWN EQUIPMENT SHUTDOWN ISOLATE EQUIPMENT APPLY LOTO DEVICES CONTROL STORED ENERGY VERIFY ISOLATION STEP 1 STEP 2 STEP 3 STEP 4 STEP 5 STEP 6

NWACC Business & Industry Workforce Development Institute J- 20 STEP 1 PREPARE FOR SHUTDOWN AUTHORIZED EMPLOYEE TO DIRECT EQUIPMENT SHUTDOWN STEP 2 EQUIPMENT SHUTDOWN AUTHORIZED EMPLOYEE DIRECTS EQUIPMENT SHUTDOWN WITH AUTHORIZED PROCEDURES. STEP 3 ISOLATE EQUIPMENT USE THE DISCONNECTING MEANS TO REMOVE ENERGY SOURCES. STEP 4 APPLY LOCKOUT/TAGOUT DEVICES FOLLOW PROCEDURES FOR INDIVIDUAL, GROUP, OR CONTRACTOR LOCKOUT. WATCH FOR SHIFT CHANGES.

NWACC Business & Industry Workforce Development Institute J- 21 STEP 5 CONTROL STORED ENERGY DISCHARGE CAPACITORS, RELEASE PRESS FLYWHEELS, DOUBLE BLOCK & BLEED LINES, ETC. STEP 6 VERIFY ISOLATION ACTIVATE CONTROLS, MAKE CIRCUIT MEASUREMENTS, ETC.

NWACC Business & Industry Workforce Development Institute J- 22 FOLLOW PROCEDURES FOR RELEASE FROM LOCKOUT/TAGOUT INSPECT AREA TO ENSURE NON-ESSENTIALS REMOVED & EQUIPMENT INTACT & EMPLOYEES IN “SAFE ZONES”. NOTIFY AFFECTED EMPLOYEES. INDIVIDUALS REMOVE THEIR LOCKS & TAGS. TEST & POSITION EQUIPMENT AS REQUIRED BY PROCEDURES INFORM REQUIRED PERSONNEL AND RELEASE EQUIPMENT FOR USE.