PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.

Slides:



Advertisements
Similar presentations
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Advertisements

Capital Improvement Program (CIP) Overview Jim Herberg, P.E., BCEE June 14, 2012.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
BDI 2013 Developers Conference New Construction New construction valuation for 2012 is $21,313,174. Largest single year total ever. 64 single family.
Case Study: Disinfection byproducts in a recently constructed public water supply Maria O’Connell, P.E. Kristine Wheeler, P.E. New York State Department.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Tanya T. Spano, Chief, Regional Water Quality Management Section Dept. of Environmental Programs Metropolitan Washington Council of Governments Overview.
Utility Extension Project
California Used Oil/Household Hazardous Waste 2009 Training & Conference.
Tigard_WSP_0410. Existing System Miles of Pipe 2.Twenty One Pressure Reducing Valves (PRV) 3.Seven Pump Stations 4.Two Aquifer Storage and Recovery.
Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant.
City of Atlanta Department of Watershed Management Bureau of Drinking Water.
Surface Reservoir Storage Operations 2011 Public Utilities Department Public Utilities Department ( (Water Operations Branch)
Washington County, Oregon March 19, 2014 Board Meeting Engineering Department Report.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Water Treatment & Distribution System Overview.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
Southeast Energy/Water Interdependence Exercise Basic Drinking Water Treatment EPA-R4 Drinking Water Section April 25, 2007.
Community Economic Revitalization Board & Public Works Board Funding local opportunities in Eastern Washington.
TACOMA WATER RESILIENCY Providing Clean, Reliable Water Now And In The Future.
The Church Street resident only parking lot, next to the sewer pump station is CLOSED due to the construction work on the Pump Station. Resident are to.
QUIZ pp Octavia Hill. QUIZ ANSWERS POPULATION GROWTH Dramatic pop growth between = 270 million 1910 = 460 million Cause of pop.
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
Progress Update – April 2009 by The 1910 Historic Restoration Group Boyne City Water Works (“1910”) Building.
Lawton Fort Sill Regional Airport Lawton Airport Industrial Park U.S. Hwy 81 I Approx. Acres (Total)
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Proposed Retail Rate Change Effective January 1, 2008.
We are an internationally recognized leader in marina utilities – water, sewer, electric and fire protection.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Marin Economic Conference Forecasting the Future The Impact of the Drought October 29, 2015.
Putnam Technical Vocational High School, Springfield, MA  Roof Water Reclamation for grey water use – Partial collection of roof water – (4)-4,000 gal.
City of Plymouth Plymouth Utilities Water System.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing October 13, 2015.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
USING LOCAL RESOURCES TO MEET LOCAL NEEDS. Wood heating – an introduction Eastern Region Renewable Energy Conference
FBC Spring Conference April 21, Flip Mellinger Using the data to improve efficiency © The Florida Benchmarking Consortium.
Orange County Sanitation District Orange County Sanitation District Example Title Slide Example Title Slide.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
Jazreel valley - A case study for water management and creation of new water resource 1.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Sewerage & Water Board of New Orleans Water Hammer Hazard Mitigation Project February 4, 2015.
Bellevue Utilities Seismic Work
Richland Creek Water Supply Program Briefing
Wastewater Fee Increases
Public Private Partnership Opportunities in Bismarck
Water Department has Six Divisions
Stainless Steel Water Well Casing.
The United States Conference of Mayors - Mayors Water Council May 2018
Parkland/Brookdale Interceptor Replacement
PALM DESERT FEBRUARY 9, 2018 Dr. ALLAN BERNSTEIN TUSTIN CITY COUNCIL
Name: _________________ Class: ________
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
City of Spruce Grove Capital Region Partners Presentation 2019
Everett Water Supply Resiliency
Presentation transcript:

PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System

Project Summary $2.3 million water and sewer system improvements project to the Arlington Airport and new industrial park area Water system improvements included two new booster pump station, a 250,000-gallon reservoir, and a full distribution system Funded by the City of Arlington and Gilliam County The City of Arlington has a shovel-ready industrial park area with full water and sewer system service

Reservoir Construction

Airport Booster Pump Station Piping

250,000-Gallon Steel Storage Reservoir and Booster Pump Station

Mesa Industrial Park Area