The new MEF Group S. Baird 12 th December 2008. The new MEF Group Mandate for the MEF Group MEF structure Support for LHC experiments Formal meetings/committees.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
Mid Term Review Meeting, 26 September 2012E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
Catia Forum CAEC in short Organization Current composition of CAEC Sub-committees and Working groups CAEC in short Organization Current composition.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
LHC-YETS Coordination meeting #9 24 th November, 2015.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Introdcution to Workpackage/Activity Reflection D. Schulte.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
Transport and Handling Manpower Planning S. Prodon – LEAF
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
I. Bergevoet - Training preparation
ICE SECTION The coolest place to be! Elias Métral
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Installations, modifications, consolidation in 2005:
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Upgrade Strategy for the Experimental Vacuum Systems
CLIC Civil Engineering Update
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Present and Future test facilities for High-intensity Targetry CERN
Experimental Areas – LS2 planning
ABP/RTL Main RTL Activities for 2007/8:-
Presentation transcript:

The new MEF Group S. Baird 12 th December 2008

The new MEF Group Mandate for the MEF Group MEF structure Support for LHC experiments Formal meetings/committees Extra slides –Enlarged list of MEF specific responsibilities –Mandates for sections

Machine and Experimental Facilities (MEF) Group in the Engineering Department S. Myers 11 th November –“The new structure has, as primary objective, the optimisation of the operational performance of the LHC and the other experimental facilities.” –“Each new department is an equal partner in contributing to the operational efficiency of the accelerators” For us (MEF) this means…. –Move from LHC Construction and Installation to LHC Operation –Efficient coordination of all activities (accelerators and experiments) –Support for experiments (installation and operation) –LHC is an ensemble of accelerators, experimental areas and experiments…. –….and it all has to work

Mandate for MEF Group The Group is responsible for:- –planning and coordinating all maintenance and installation activities in the CERN Accelerator Complex, –providing support to the experiments using the CERN accelerators, during their preparation, integration, installation and operation, –the design, installation and maintenance of the secondary beam lines and zones. –configuration management and integration activities for the LHC and SPS

–MACHINES and EXPERIMENTAL FACILITIESMACHINES and EXPERIMENTAL FACILITIES

MEF and LHC experiments Today the support for LHC experiments comes from TS/LEA –MEF will continue the previous engagements –Today’s responsibilities remain for 2009 How will the support need to evolve as we move into regular beam operation/shutdown schedule? –Goal to provide an agreed service to experiments (agreed with each experiment) Service will not change - I hope with a bigger team we can do better –“forward detectors”, remote handling installations…, shielding –Background studies and preparation: (needs formalizing) –LHC upgrade Other MEF sections are already involved in integration planning etc –Gas installations, cabling and installation support… Maintain service from TS/LEA in EN/MEF/SI Improve with additional manpower from ATB/SBA

EAMS…. –Atlas: F. Butin (absent 01-06/09), D. De Paoli, F. Bais –Alice: S. Evrard, B Moris –LHCb D. Lacarrere, J. Herranz-Alvarez –CMS M. Gastal (contract ends 06/09) S. Rew (transfer back to GS/CE?) For CMS MEF will maintain the support on 5 th January –Additional manpower? –Re-assign tasks inside the team For June…. MEF and LHC experiments

For future –Define support required for each experiment We need to know what you need –Standard Shutdown activities, installation and maintenance (including gas, cabling and some mechanical work etc…) MEF/ABA and MEF/LE with support from MEF/SI –“Forward detectors” upgrades modifications MEF/LE,… –LHC background studies MEF/LE, BE/ABP, BE/OP, collimation project etc. –New activities/studies including LHC upgrade MEF/LE –???? MEF and LHC experiments

Committees LHCC LEMIC LHC Experiments Technical Committee (LETC) –Practical Forum to discuss the technical issues for LHC experiments concerning:- Integration, Installation, Services, Operational support. –Replaces LEADE?. –Participation:- LHC experiments, services representative (CV, EL, IT, SC, access), MEF, machine operations….. LHC background working group –Coordinates the activities for the LHC background estimates and optimization. MEF/LE, LHC Experiments, BE/ABP, Collimation project, EN/ATB, BE/OP….

Provide Configuration Management for the LHC machine using the Reference Database, and extend these Configuration Management methods to SPS (and PS?). Provide integration studies for the LHC machine, LHC experiments, SPS and new projects, such as HIE-ISOLDE, LINAC4, and study the possibility of extending these methods to the PS Complex. The Group is also involved in the migration from EUCLID to CATIA through the E2CTF Committee. Planning and coordination of installation, maintenance shutdown and repair activities for LHC, PSB, PS, SPS, LEIR & AD. Design, installation and maintenance of the beam lines and equipment, downstream of the primary targets in the North Area, CNGS, PS-East Area and the AD experimental area. Provide support to CERN experiments for their installation, services and integration with the beam lines. For LHC this includes responsibility for all “forward detectors”, and the optimization of the layout of the regions around the LHC experiments, paying special attention to particle background issues. Specific MEF responsibilities I/II

Maintain fixed gas installations and cabling for CERN experimental areas. During beam operation, follow-up and guidance of CCC operators and users on a daily basis for the optimal use of the experimental beam lines. During LHC physics operation follow-up, with CCC operators, the optimization of running conditions for all the LHC experiments. Coordinate the Accelerator Consolidation programs Provide planning support for CERN projects such as CLIC, LINAC4, the LHC upgrade… Provide TSO’s for accelerator tunnels, experimental Halls and related surface buildings Management of the LHC sites. Management of the Prevessin storage for material from the CERN Accelerator tunnels. A CERN-wide policy for storage of this material needs to be evaluated. Specific MEF responsibilities II/II

LHC Planning and Coordination Planification LHC –Planifier les activités des shut-down de la machine, et organiser la logistique associée. –Suivre et ajuster le planning en fonction de l’avancement des activités –Informer les différents acteurs du plan de base et de son évolution Planification upgrade LHC et autres projets : CLIC, LINAC4,.. Coordination des travaux –Coordonner les travaux sur le terrain –S’assurer de la mise en œuvre de la logistique « matériel» définie –Gestion des zones de cantonnement et de la déchèterie locale durant le SD Gestion des sites –Gestion opérationnelle des sites durant toute l’année –TSO

Layouts and Integration Manage the LHC configuration with the Extended Reference Database and the Hardware Baseline. Handle the integration studies of CERN accelerators and transfer beam lines, with a priority to the injection chain to LHC. Ensure that the components, the services do not interfere with each other, or with the tunnel wall.

Accelerators, Beam lines and Areas The section provides a global coordination for all of CERN's Accelerators and Beam Areas except the LHC Ring but including the Infrastructure & Services related to the LHC Experiments. In particular, the section is responsible for:- –Planning and coordinating all the installation, maintenance and repair activities throughout the CERN Accelerator Complex including transfer lines, secondary beam lines and associated Experimental Areas (PSB, PS, EAST HALL, SPS, NORTH AREA, AD, AD EXP AREA, LEIR, CNGS beam line and target zone & nTOF beam line). –Providing infrastructure and services related support to the LHC Experiments –Supervising and coordinating the Accelerator Sector Consolidation programs. –Providing TSO’s for CERN's accelerators (other than LHC machine) and some associated buildings.

Services and Installation The section is a support for the whole MEF group for installation activities in the machines, secondary beam lines and experimental areas. The SI section:- –provides support to the experiments in the fixed target experimental areas for mechanical installation work, which involve welding, machining and complex assembly works. –is responsible for the vacuum in the secondary beam lines and provides those lines with mechanical support for instrumentation, alignment tables and platforms. –provides gas system installations and cabling installation on request in experimental areas. –organises the supply of inflammable and neutral experimental gases to the experimental areas at CERN.

Liaison to Experiments The LE section provides support to experiments using the CERN accelerators during their preparation, integration, and operation. This includes integration and layout modification studies, background calculations, as well as follow-up and guidance of operations for the optimal use of the beams. The section is responsible for the design of the secondary beams downstream the primary targets and of the corresponding experimental areas.