Chiho Wang ATLAS TRT Duke University Dubna, May 2005 1 Fuse Box Production Chiho Wang/Jack Fowler.

Slides:



Advertisements
Similar presentations
CBM - Straw Tube Tracker
Advertisements

AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Single-Balanced Mixer Assembly Instructions Revision 2 Updated 5/7/2012.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
CricketSat Assembly.
Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Colorado Space Grant Consortium Timing Circuit HW #4 Class #07 Timing Circuit HW #4 Class #07.
1 Student Hands On Training I (2007) Timing Circuit & Camera Integration Timing Circuit & Camera Integration.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
COB 08 RTM Fuse Modification Required – Soldering iron capable of removing resistor without damaging board. Metcal with tweezer attachment recommended.
The printed circuit board (PCB) design
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Wiring the Control Box Battery Conductor(s) Resistor.
JMC – Joint Motion Controller Complete guide to building and testing each JMC.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Building a Weather Station for a Near-Space Payload AEM 1905: Spaceflight with Ballooning University of Minnesota.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Essmart Hackathon Peter Burkimsher and Sreechand Tavva.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
2003/Oct/19 version.Page 1 Aerogel HV cable assembling procedures (for W1-NORTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
2003/Nov/16 version #1.Page 1 Aerogel HV cable assembling procedures (for W1-SOUTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
ASSEMBLING THE PCB Have the PCB in front of you as shown. Make sure there are no copper tracks showing. This side is called the component side.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Belle-II iTOP HVB Status SLIDE FOR INCLUSION IN GARY’S PRESENTATION Belle II General Meeting Gerard Visser Indiana University CEEM 11/13/2012.
The printed circuit board (PCB) design §PCB design is part of the design process of a product in electronics industry. §PCB is a piece of insulating plastic.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
SeaPerch Electrical System. Electrical System Overview Assemble the control box. Make the Cat5 connector. Wire the motors to the tether. Wire the control.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
ASSEMBLING A CIRCUIT WHILE MAKING A DRAGONFLY. WITH... 2LEDs 2Transistors 1 Resistor 1 Capacitor 1 9V Battery 1 Battery Clip 9 Electric Wire Connectors.
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
Installing Branch Circuits
Transient Response of an RC Circuit
Soldering Leads to the DC Motor
SeaPerch Electrical System
DOM integration meeting
Summary of Fuse Testing for Barrel Module Fuse Boxes
Reverse Engineered PIC-101 DC-DC converter example
Some proposals on HV circuits realization for segmented straw detector
Summary of Fuse Testing for Barrel Module Fuse Boxes
Visual Instructions.
The basic parts needed to make a flux capacitor are 8 high voltage capacitors (Vishay Cera-Mite 500 pf 15 KV capacitors with Y5U dielectric are suitable),
Testing of the EMCO Prototype Boards
FIGURE 24-1 The two horns on this vehicle were finally located under the front bumper. They were not visible until the vehicle was hoisted.
testing and experimenting with electronic circuits
SeaPerch Electrical System
Presentation transcript:

Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler

Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Assembly  1 fuse box “set” supplies HV to 1 “stack” of 3 modules.  (10% spare) = 35 “sets” of fuse boxes to be made.  Each fuse box “set” consists of u 6 fuse boxes: 2 of each module type u 22 HV coax cables: 6 for type 1 : 3 HV lines / box 6 for type 2 : 3 HV lines / box 10 for type 3 : 5 HV lines / box u 1 HV connector: 51-pin: 22 HV + 22 ground + 2 interlock + 1 case ground + 4 empty

Chiho Wang ATLAS TRT Duke University Dubna, May What to assemble in the fuse box  Circuit boards = 2 per fuse box  Spring contacts = (# fuses) + (4 ground contacts/box)  Filter circuits: u 1 per HV line = 2 x 1kΩ Resistors + 1 x 870pF Capacitor  Mounting nuts (Ultem) = 2 per fuse box  Fuses: (contain extra fuses due to symmetry) u Type 1: 44 fuses/module (22/box), 42 in use. u Type 2: 68 fuses/module (34/box), 65 in use. u Type 3: 104 fuses/module (52/box), 100 in use u Total (for 35 sets) = spare  Jumpers u 1 ground jumper between halves. u 1 HV jumper between halves, for type 2 and type 3 only  HV cables

Chiho Wang ATLAS TRT Duke University Dubna, May Old Fuse Box GND jumper HV jumper Mounting Nuts Switched to the other half in new design Similar jumpers also needed for new fuse box

Chiho Wang ATLAS TRT Duke University Dubna, May HV Granularity & Current Draws μA/line μA/line μA/line 3 lines 5 lines

Chiho Wang ATLAS TRT Duke University Dubna, May Implementation  For each type of module: u 1 type of fuse box u 1 length of cable u Applies to (4 HV Kapton positions) x (4 connector locations).  Neighboring modules are supplied from opposite ends u Odd # modules from side A (back side) u Even # modules from side C (front side)  The HV cable is made long enough to swing to neighboring modules in case switching side is necessary.

Chiho Wang ATLAS TRT Duke University Dubna, May Front Side Connections Nominal Fuse Box Connection Pattern repeats in 4 modules interval (i.e. every 2 sectors) Connectors

Chiho Wang ATLAS TRT Duke University Dubna, May Connections & Naming Convention Another table to map: straws  fuse  HV line !

Chiho Wang ATLAS TRT Duke University Dubna, May Production procedures  Mark/label fuse box  Glue circuit board to fuse box u Use high temperature RTV. u Along the front edge of ckt to prevent flux from flowing under circuit board.  Place components on ckt board and oven solder them. u Spring contacts + filter resistors + filter capacitors. u Spring contacts are clamped in place in soldering process.  Clean fuse box  Glue mounting nuts  Tape together 2 halves of fuse boxes  Solder fuses by hand u In case of resistor substitute may use oven soldering.  Clean fuse box(?)  Solder HV cable by hand  Solder jumper wires by hand  Clean fuse box  Spot glue HV cable & jumper wires for strain relief  Bake/dry fuse box right before coating  Coat fuses & wires with conformal coating  Label HV cables  Cut HV cable to length and attach connector At Duke manpower permitting

Chiho Wang ATLAS TRT Duke University Dubna, May Parts Status  G10 boxes: 16 modules/type in hand, ~ end of May  Circuit boards: in hand  Spring pins: in hand, need cutting, bending  Filter resistors + capacitors: in hand  Mounting nuts: ½ in hand, ½ to be made  Fuses: under production  (Substitute resistors: ordered)  HV Cable: available from Herve.  HV Connectors: in hand  Ultem screws: in hand  Mounting brackets: quoted, placing order.