Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.

Slides:



Advertisements
Similar presentations
March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
Advertisements

Jon Chiglo, PE Project Director 2014 Construction Plans.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Chapter 5 Signs, Signals, and Roadway Markings
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Signs, Signals and Roadway Markings
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Chapter 5 Signs, Signals, and Markings
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
SR A1A / SR 200 Reconstruction Project
From Island Estates Parkway to St. Johns County Line.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Illinois state line to Madison Dane and Rock County
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Current Construction Projects Major Projects Pinellas County.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
1 The Louisville - Southern Indiana Ohio River Bridges Project (LSIORBP) Real Estate Economic Forecast Two New Bridges, One Project.
Purpose of Work Shop Share Ohio’s experience with a full closure reconstruction: the rationale, challenges, implementation and benefit.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
Community Development Department Construction Phase BULLDOG DRIVE.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Transportation Projects City Council Workshop May 14, 2013.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
Traffic Signs Part Two. What do these 2 signs tell you?
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Welcome!. OVERVIEW Limited access reconstruction/relocation of US 31 from US 30 to US 20. The project area includes the communities of LaPaz and Lakeville,
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
District VI, Florida Department of Transportation BARRIER DESIGN ALTERNATIVES FOR CRASH MITIGATION SE 2 nd Avenue and Biscayne Blvd Way (SE 4 th Street)
Arizona Forward Update
The I-465 West Leg Reconstruction Project
MnDOT PROJECT UPDATE Trunk Highway 169 Improvements Fall 2016 – Fall 2017 Mayor & Council Members - Thank you for giving us this opportunity to give.
Highway 110 Project Update
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Highway 169 Bridge Replacement & Pavement Resurfacing
Issaquah-Fall City Road
Double Crossover Diamond Interchange
Technical Committee on Geometric Design
I-295/Malcolm X Avenue Interchange Improvement Project
Contract 60X10 Informational Meeting Weber I-55
Commissioners Presentation
Metropolitan District | mndot.gov
National Organization of Minority Engineers Leadership Summit
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

Road To Success US 41 WIS 441 Tri-County

Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015

Presentation Outline US 41 Project overview Status update Winnebago and Brown counties Completed construction 2015 construction highlights WIS 441 Tri-County Project overview Little Lake Butte des Morts crossing Diverging diamond interchange

Road To Success US 41 Project

COMPLETED Limits: WIS 26 to Breezewood Lane Length: 17 miles Construction: 2009 – 2014 Budget: $460 million Winnebago County

Wiouwash State Trail

Limits: Orange Lane to Lineville Road Length: 14 miles Construction: 2010 – 2017 Budget: $1.055 billion Brown County

Brown County Completed Construction Present (through December ‘14): $705 million total committed for construction 53 of 57 construction contracts let

WIS 29 Interchange Before US 41 WIS 29

WIS 29 Interchange Completed WIS 29 US 41

WIS 29 County EB Before

WIS 29 County EB Completed

Brown County 2015 and beyond (calendar year) $76 million of remaining scheduled construction projects Remaining 4 of 57 total construction contracts 3 contracts will be let in ‘15, 1 in ’16 2 contracts less than $1million

Brown County 2015 and 2016 calendar year lets Let DateProject Description 01/13/15* Memorial Drive to Duck Creek NB / I-43 Interchange 03/10/15 Memorial Drive to Duck Creek SB / I-43 Interchange / Velp Avenue Interchange 03/10/15WIS 29 System Interchange Landscaping (<$1m) 02/09/16WIS 172 Interchange Landscaping (<$1m) * Contract let

Velp Avenue Interchange Velp Avenue interchange Construction Spring 2015 – winter 2016/17 Full CLOSURE for 60 consecutive days in 2016 Begins second week of Aug 2016 Completed second week of Oct 2016

I-43 Interchange Construction: Fall 2013 – spring 2017

Road To Success WIS 441 Tri-County

Limits: Cold Spring Rd to Oneida Street Construction: Length: 6 miles Budget: $475 million

Reconstruct 5 interchanges and add missing movements at US 41 Project Improvements - Overview

Replace 6 miles of mainline pavement, expand to 6 lanes

Project Improvements - Overview Improve design speed of roadway curves

Project Improvements - Overview Revise interchange control

Project Improvements - Overview Add auxiliary lanes along US 41 for system interchange operation

WIS 441 Project Present (through December ‘14): $64 million total committed for construction 3 of 20 construction contracts let 2015 and beyond $267 million of remaining scheduled construction projects Let remaining 17 of 20 total construction contracts 6 contracts will be let in ‘15; 2 in ‘16

WIS 441 Project 2015 and 2016 calendar year lets Let DateProject Description 02/10/15* Midway Road Transportation Management Plan (TMP) (<$1m) 03/10/15Racine Rd (County P) Interchange Early Fill 03/10/15 Appleton Rd (WIS 47) Interchange and Vermillion Street 07/14/15 US 41 Interchange B and US 10 EB Grading/Paving 07/14/15Neenah Wetland Mitigation Site (<$1m) 07/14/15Racine Rd (County P) Interchange 03/08/16Racine Rd (County P) 07/12/16 US 41 Interchange Bridges and LLBDM Bridge B Redecking * Contract let

Little Lake Butte des Morts Structures

Construct 2nd parallel bridge over LLBDM New concrete structure closely matches existing Spans will vary from existing, more cost effective Stain existing and new structures to match Structures will have overhead bridge deck lighting

Little Lake Butte des Morts Structures Little Lake Butte des Morts crossing − New bridge construction: − Existing bridge rehab:

Oneida Street Interchange Construct a Diverging Diamond Interchange at US 10/Oneida St  Enhance safety and mobility with access changes  Meadow Grove Blvd left-in/right-in/ right-out  Primrose Ln right-in/ right-out  Extend Vermillion St to Midway Rd

Diverging Diamond Interchange Why a DDI? Saves $3M compared to RAB and standard signal alternatives Better 2038 traffic level of service than alternatives (C vs D/E) Improved safety and capacity Moves more traffic Free-flow right and left turns onto freeway Reduces conflict points by nearly half (14 vs 26)

Diverging Diamond Interchange Meets the needs of all road users Large trucks Pedestrians Bicyclists Widespread use Built in over 9 states Planned or considered in at least 25 states Easy navigation, guides drivers with: Overhead signs Pavement markings Traffic signals

Road To Success US 41 WIS 441 Tri-County