Welcome to SNOLAB David Sinclair. Welcome to our new Building Note – Building is still under construction Note – Building is still under construction.

Slides:



Advertisements
Similar presentations
Bangladesh European Union Capacity Building for Effective Response Management System Through e-Learning Options A SDC supported project Comprehensive Disaster.
Advertisements

The Cryopit Fraser Duncan Cryopit Workshop 16 August 2011.
Strategies for Success – Grade 9 Lesson Ms. Cooper Ms. Drummer.
Instructional Materials Process and Progress Update Chief Academic Officer Quarterly Meeting November 13, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
SNOLAB – An International Facility for Underground Science Expand underground space to allow several experiments to operate simultaneously Provide a surface.
The National Children’s Study A Very Brief History Spring 2000 – Interagency Coordinating Committee established October 2000 – Children’s Health Act authorizes.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
Status of SNOLAB Development Fraser Duncan SNOLAB Workshop 4 Oct 2008.
Andrew Hime Physics Division, LANL e-e- e-e- e SNOLAB Scientific Development Andrew Hime Physics Division, Los Alamos National Laboratory SNOLAB Workshop.
GeoNeutrino 2008 Sudbury Sept 18 th, 2008 SNOLAB: A New International Facility for Underground Astroparticle Physics T. Noble Queen’s University.
Recommendations for Science at SNOLAB Andrew Hime On behalf of the Experiment Advisory Committee Aug. 17, 2005 SNOLAB Surface Building.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
Tony Noble Queen’s University Development of the SNOLAB Scientific Program.
Transportation Improvement Program Status and Update.
Fraser Duncan Queen’s University Synergies in Low Background Techniques 26 July 2005 Underground Facilities at SNOLAB.
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
Andrew Hime Physics Division, Los Alamos National Laboratory Workshop on Low-Radioactivity Techniques Laurentian University, Sudbury, Ontario, Canada.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Construction and Development Status SNOLAB Workshop V 21 August 2006 Fraser Duncan.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
Design Progress Presentation New Collinsville Elementary School October 20, 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
SNOLAB Science & Scientific Development Andrew Hime On behalf of the Experiment Advisory Committee Aug. 15, 2005 SNOLAB Surface Building.
Data Center Stabilization
GlueX Collaboration Meeting
City Council Meeting November 7, 2016
CBETA Technical Review
Mornington Park Enhancements
Campus Master Plan.
January 2016 December 2017 July 2015 June October 2014 Commencement of first contracts and site construction December 2017 Grand openning.
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
The TRIUMF Gate Review Process
Potential Milestones A timeline to finish in one year
Welcome! Hodgson Middle School Parent Information Night
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
Technical Advisory Committee
TOP6 – WP4 Coordination and Management JPICH Coordination Office
DSC ChMC CSS update 11th December 2018
X-Ray Endstations Update
MULTISPORTS CENTRE PRESENTATION
DSC ChMC CSS update 09th January 2019
Role of the External Examiner
Fueling the Future of the Fairbanks North Star Borough
Data Systems and Technology
DATES DESCRIPTION September 27, 2018
TOP6 – WP4 Coordination and Management JPICH Coordination Office
CONSTITUENT BODY REFORM (CBR)
2015 January February March April May June July August September
Working Party on Noise (GRB) General information and WP.29 highlights
Campus Master Plan An update to the Campus Advisory Board
Presentation transcript:

Welcome to SNOLAB David Sinclair

Welcome to our new Building Note – Building is still under construction Note – Building is still under construction Please stay out of lab space Please stay out of lab space Elevator is currently freight only Elevator is currently freight only Fire alarm is slow bell – evacuate building Fire alarm is slow bell – evacuate building

Underground Progress Excavation progressing well ~50% of Phase I complete Excavation progressing well ~50% of Phase I complete Raise bore to 6700/6600 complete Raise bore to 6700/6600 complete

Underground Facilities

Features of underground space All space within a common clean boundary (~class 2000) All space within a common clean boundary (~class 2000) Common infrastructure includes dirty-clean transition and materials handling, power (~1.5 MW), cooling (300 T), water, UPW, networking (Gb/s off site, high speed internal) and clean ventilation system Common infrastructure includes dirty-clean transition and materials handling, power (~1.5 MW), cooling (300 T), water, UPW, networking (Gb/s off site, high speed internal) and clean ventilation system Design allows for future expansion but scale is limited Design allows for future expansion but scale is limited

Underground Schedule Excavation Excavation Entry – now – 1 November Entry – now – 1 November Ladder – now – 1 November Ladder – now – 1 November Rectangular hall – 1 November – 9 May Rectangular hall – 1 November – 9 May Cryopit – 10 May – 1 December/06 Cryopit – 10 May – 1 December/06

Underground Schedule Outfitting Outfitting Finalize contract package – 30 September Finalize contract package – 30 September Award contract – 14 January Award contract – 14 January Entry 14Feb/06 – 13 June Entry 14Feb/06 – 13 June Ladder 14 June – 11 Oct Ladder 14 June – 11 Oct Rectangular hall 12 Oct – 8 February 07 Rectangular hall 12 Oct – 8 February 07

Science Programme Scientific programme established through series of workshops Scientific programme established through series of workshops This marks the 4 th in the series This marks the 4 th in the series Try to define likely first experiments and the long term roadmap Try to define likely first experiments and the long term roadmap

External Committees Experiments Advisory Committee Experiments Advisory Committee B. Barish/A Hime B. Barish/A Hime B. Balantenkin B. Balantenkin C. Burgess C. Burgess T. Kajita T. Kajita J. Martin J. Martin K. Ragan K. Ragan K. Scholberg K. Scholberg D. Wark D. Wark Science and Technical Committee Science and Technical Committee G. Oakham G. Oakham E. Blackmore G. Greer (Inco) J. Martin

The Selection Process Proponents submit LOI Proponents submit LOI EEC reviews LOI, requests additional input EEC reviews LOI, requests additional input Proponents provide input, make presentation Proponents provide input, make presentation EEC makes recommendation based on science/technical feasibility/fit to facility etc. Conditional approval! EEC makes recommendation based on science/technical feasibility/fit to facility etc. Conditional approval! Proponents obtain funding Proponents obtain funding

Selection Process Proponents do detailed design Proponents do detailed design SNOLAB participates in design review process – Aim is to find solutions SNOLAB participates in design review process – Aim is to find solutions Experiment is carried out Experiment is carried out