SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Mike Dolan – ABSTRACT: This contribution.

Slides:



Advertisements
Similar presentations
TITLE SOURCE CONTACT A Femto System Architecture for cdma2000® Systems
Advertisements

XHRPD Example Scenario for MSS Masa Shirota Qualcomm Inc. July 15, GPP2 Dalian Meeting Recommendation: FYI Notice QUALCOMM Incorporated grants a.
All Rights Reserved © Alcatel-Lucent 2007 SOURCE:Dennis Ong, Alcatel-Lucent John Burgess Alcatel-Lucent CONTACT:
3GPP2 A r0 3GPP2 C xxxr0 TSG-A WG3 and TSG-C WG2 Title: HRPD Redirect on EPC Unavailable Source: Mike DolanAlcatel-Lucent Dave.
HRPD Femto Local IP Access: Overview Peerapol Tinnakornsrisuphap Qualcomm October 27 th, GPP2 Seoul,
1 UATI-IP address mapping Peerapol Tinnakornsrisuphap David Ott Qualcomm.
1 | 3GPP2 TSG-X Discussion | December GPP2 X R1 TITLE: TITLE: M2M Deployment Scenarios for 3GPP2SOURCE Mike Dolan, Alcatel-Lucent,
1 Title: TDF support in cdma2000 1x and HRPD Networks Sources: China Telecom, ZTE, Huawei Contact: CT: Heng Nie ( ), Congjie Mao(
ABSTRACT: This contribution proposes the HRPD-WiMAX handoff solution. TITLE: HRPD-WiMAX Handoff TSG-A WG4 RECOMMENDATION: Review and Adopt Samsung Electronics.
3GPP2 Network Evolution: Inter-working Across Technologies January 08, 2007 QUALCOMM Inc Notice Contributors grant a free, irrevocable license to 3GPP2.
1 cdma2000® Data Service Transition to NULL Support Jun Wang Ravi Patwardhan June 5, 2003 Recommendation -
© Alcatel-Lucent | M2M Numbering | April 12, GPP2 M2M TITLE Numbering in 3GPP2 for M2MSOURCE Mike Dolan, Alcatel-Lucent, Mike.
3GPP2 Femto Cell Workshop
Broadcast Area Based Management for BCMCS Quanzhong Gao Weidong Wu 04/05/2005.
Security Framework for (e)HRPD 1 S GPP2 TSG-S WG4 Source: QUALCOMM Incorporated Contact(s): Anand Palanigounder
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed draft.
SCFAH r1 Title: Working Draft “Ad-Hoc Recommendation to SC on 3GPP2 Future” Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
ABSTRACT: This contribution offers some suggestions for the support of Femto Devices in 3GPP2 standards. TITLE: Femto Device Support TSG-A WG4 RECOMMENDATION:
Broadcast/Multicast Priority List JUNHYUK SONG SAMSUNG Incorporated grants a free, irrevocable license to 3GPP2 and its Organization Partners to incorporate.
X xxx China Telecom Requirements on Accounting at HA/LMA Title: Accounting at HA/LMA for cdma2000 (Work Item # 3GPP ) Sources: China Telecom.
All Rights Reserved © Alcatel-Lucent 2007 SOURCE:Dennis Ong, Alcatel-Lucent John Burgess Alcatel-Lucent CONTACT:
1 17 February 2009 Subject:Draft Presentation for Femto Conference, March 2009 Date: 17 February 2009 Source: Airvana Contact: Doug Knisely
May 12, 2008 Alcatel Lucent, Cisco, Motorola, Nortel, Verizon ABSTRACT: Proposed is additional key hierarchy and derivation for EPS access over eHRPD.
Donghee Kim Samsung Electronics ABSTRACT: This contribution shows the summary of changes in evaluation methodology text.
5 November Overview of Proposed Femtocell Architecture Alternatives presented at the 3GPP2 Femto Workshop Airvana 5 November 2007 cdma2000® is the.
Donghee Kim Samsung Electronics ABSTRACT: This contribution shows the summary of changes in evaluation methodology text.
1 Authentication and User Profile April 24, 2007 Jun Wang QUALCOMM Inc. Notice Contributors grant a free, irrevocable license to 3GPP2 and its Organization.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
WRKSP GPP2 SC Workshop Planning Ad-Hoc Title: Operator Network Improvements Source: Jane Brownley Abstract: Draft Presentation on Operator.
ABSTRACT: This contribution introduces the inter-RAT fast handover solution. TITLE: Inter-Radio Access Technology Fast Handover TSG-A WG4 RECOMMENDATION:
1 | L2-Tunnel based – Inter-tech. HO | October 29, 2007 Title: An L2-Tunnel based method for UMB-HRPD Inter-Technology handoff Source: Alcatel-Lucent,
HRPD Network Load Balance ZTE grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
Active Call Hand-in in cdma2000 1x Airvana Qualcomm October 27 th, GPP2 Seoul, Korea Notice ©2008. All rights reserved. The contributors grants a.
TSG-A WG3 Title: Possible solution for HRPD-LTE SON Source: Yuanfang Yu, Xiaowu Zhao, Ting Lu, Yonggang Fang Abstract: This contribution provides a possible.
ABSTRACT: This contribution proposes the HRPD-WiMAX handoff solution. TITLE: HRPD-WiMAX Handoff TSG-A WG4 RECOMMENDATION: Review and Adopt Samsung Electronics.
Supporting Local Breakout in HRPD Femto Peerapol Tinnakornsrisuphap Qualcomm Doug Knisely
August 25, 2008 Alcatel Lucent ABSTRACT: 1x System Reliability is important in the face of major events, such as an earthquake. There are several ways.
3GPP2 Network Evolution: UMB->HRPD Handoff October 16, 2007 Qualcomm Inc. Contact: Jun Wang Notice Contributors grant a free, irrevocable license to 3GPP2.
SOURCE: Ke-Chi Jang Yi Song Wang Neng ABSTRACT: This contribution provide comment/suggestion/question.
X xxx ZTE Discussion on cdma2000 Charging with PCC Title: Inter-RAT RAN information management protocol Stack Sources: NSN Contact: Scott Marin,
3GPP2 X xxx Title: Subscriber QoS Profile Support in eHRPD System Sources: China Telecom, ZTE Contact: CT: Peirong Li Wenyi.
Comment to Limited Idle Mode Nortel Networksgrants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable.
1 | Tunneling Method – Inter-tech. HO | August 2007 Title: A Tunneling Method for Inter-Technology Handoff Source: Mike Dolan, Alcatel-Lucent,
Subject:Proposed Liaison from TSG-X to BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely cdma2000® is the.
1 Discussion on Handoffs for 1x/HRPD Femtos Peerapol Tinnakornsrisuphap David Ott
M2M Enhancement for HRPD Rev C VIA Telecom grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable.
1 MAPSUP in eHRPD: Data forwarding Tunnel Sources: ZTE Contact: Bi YiFeng Rajesh Bhalla
X xx CT+ZTE PCC for cdma2000 MS Init Call Flows 1 1 Title: PCC for cdma2000 – MS-Init Call Flow Example Sources: CTC, ZTE Contact: CHINA TELECOM.
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
1 Title: Performance of Default Parameters for 1xEV-DO RTCMAC Source: Christopher Lott, QUALCOMM Incorporated , Date: Februrary.
TSG-C SWG2.3 BCMCAHG Source: Lucent Technologies Contact: Krishna Balachandran Kenneth Budka Joseph Kang
C Title: Next Steps for Femtocells Date: 03 December 2007 Source: Airvana, Alcatel-Lucent, Nortel Abstract:The contribution addresses.
1 3GPP2 A TITLE: TITLE: Energy Saving Mode Architecture ThoughtsSOURCE Scott Marin,
0 软交换应用的探讨 赵慧玲 2004 年 05 月 Dynamically Coverage Management By Caiqin Zhu(Catherine Zhu) China Telecom Apr © GPP2 China Telecom.
1 Subject:Draft Responses to BBF Comments re. cdma2000 MO Preview Date: 25 January 2010 Source: Doug Knisely TSG-X FMOAHG Co-chair, BBF Liaison Contact:
Adding LTE-1x CSFB IOS specification in 3GPP2 Sources: China Telecom, Contact: Li Wenyi ABSTRACT: This contribution is to analyze the.
1 OMP for Dual Rx AT in LTE tunneled mode Contributors grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text.
HUAWEI TECHNOLOGIES CO., LTD. HUAWEI TECHNOLOGIES Co., Ltd. Page 1 Zhiming Li 18 Feb Notice.
1July 12th, 2002 S00VISION Update of Vision Issues in ITU-R WP 8F Christine Di Lapi Motorola Inc. Global Government Relations PH:
C August 19, 2003 Page 1 SMS Push Teleservice Nobuyuki Uchida QUALCOMM Incorporated Notice ©2003 QUALCOMM Incorporated. All rights reserved.QUALCOMM.
3GPP2 A r0 3GPP2 C xxxr0 TSG-A WG3 and TSG-C WG2 Title: M2M Congestion Control in the RAN Source: Mike Dolan Dave Rossetti Satish.
Clarifications on Work Split among TSG-X/A for 3GPP2 Network Evolution March 26, 2007 Airvana/Alcatel-Lucent/CTC/Fujitsu/ Hitachi/KDDI/NEC/Qualcomm/ZTE.
Inter-RAT Measurement Control Jungsoo Jung Samsung Electronics Samsung Electronics grants a free, irrevocable license to 3GPP2 and.
1 Lucent Technologies grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained.
C R1 1 3GPP2 TSG-C WG3 TITLE : FL BRCH Full Buffer Simulation Results in AWGN for Calibration SOURCE: KDDI Corporation Toshihiko Komine,
1 Notice Contributors grant a free, irrevocable license to 3GPP2 and its Organization Partners to incorporate text or other copyrightable material contained.
Source: Qualcomm Incorporated Contact: Jun Wang, George Cherian March 1, 2010 Page 1 3GPP2 Femtocell Phase II Femto Access Control Enhancement Notice ©
Requirement for Proxy Mobile IP tunnel for AGW-eBS data tunnel Qualcomm, Inc. Contributors grant a free, irrevocable license to 3GPP2 and its Organization.
IEEE MEDIA INDEPENDENT HANDOVER DCN:
Presentation transcript:

SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Mike Dolan – ABSTRACT: This contribution provides the current status of femto cell requirements work in TSG-S WG1. TITLE: Status of 3GPP2 Femto Cell Requirements Work 3GPP2 Femto Cell Workshop RECOMMENDATION: FYI The contributors grant a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. The contributors are also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution. This document has been prepared by the contributors to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on the contributors. The contributors specifically reserves the right to amend or modify the material contained herein and to any intellectual property of the contributors other than provided in the copyright statement above. S S00-FEMTO GPP2 Femto Cell Requirements Status

2 | October 15-16, 2007 | S00-FEMTO | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1 Schedule for S.P v1.0  May 2007: Work Item Initiated  July 2007: Document number S.P0126 assigned, editor appointed  May – October 2007: Review inputs, refine drafts  October 15-16: Workshop in Boston, forge cross-TSG consensus on femto development  November 2007: Finalize draft, begin TSG Review Cycle  Expedited comments by TSGs due January 2008  January 2008: Resolve TSG Comments, begin V&V  March/April 2008: Complete V&V, Approve for SC Review and publication  April 2008: SC Review complete, S.P v1.0 published

3 | October 15-16, 2007 | S00-FEMTO | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1 Status of Femto Cell Requirements in 3GPP2  Deliberation of input requirements started May 2007  Full draft containing sum of input was put together August 2007  An interim TSG-S WG1 teleconference held September 13, with good progress:  Approximately 33% of the requirements at least discussed;  Approximately 25% of the total proposed text accepted.  At the close of the TSG-S WG1 meeting in Long Beach last week:  Approximately 75% of the requirements has been discussed.  Approximately 70% of the total proposed text has been accepted.

4 | October 15-16, 2007 | S00-FEMTO | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1 High Level View of Proposed Requirements  Introductory text, descriptions, definitions, references  System (general) requirements (9 proposed)  Radio Requirements (14 proposed)  Mobility Requirements (21 proposed)  Security Requirements (13 proposed)  Operations, Administration and Maintenance (OA&M) Requirements (41 proposed)  Regulatory Requirements (2 proposed)  Performance Requirements (7 proposed)  Accounting Requirements (1 proposed)  System Goals (2 proposed)

5 | October 15-16, 2007 | S00-FEMTO | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1 Scope and Direction  Femto Cell System is envisioned to support a common OAM&P, a common femto system architecture, and a common core network  Femto cells will provide ease of installation and subscriber support  Device procured as a commodity item in general electronics store  Installed by the user at home according to operator guidelines  After connection to the fixed broadband network, it starts operation  Initial goal is to have femto cells support existing HRPD and 1x terminals  Improvements in “femto-aware” terminals to be considered after Phase 1  Femto cells co-exist and interwork with the macrocellular system  Minimize interference, support handoff  Femto cell systems use existing standard RAN and core network interfaces  It is possible to either restrict access of a terminal to a femto cell, or to allow unrestricted access by any terminal

6 | October 15-16, 2007 | S00-FEMTO | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1  Phase 1:  1x Circuit-Switched Voice  HRPD Connected State one-way handoff: femto  macro  Existing 1x cell selection  Basic OA&M requirements  HRPD rev A high speed data and VoIP (HRPD rev B support is implicit)  Phase 2:  Femto-aware terminals  HRPD Connected State 2-way handoff : macro  femto  Connected State handoffs of VoIP  Connected State handoffs of VoIP to 1x Circuit-Switched Voice when transitioning from femto to macro  Post Phase 2:  Enhanced OA&M requirements Expected Phasing S.P will focus primarily on Phase 1 to meet the schedule shown on slide 2 Phase 2 will follow afterwards, probably in S.P0126-A