Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja INTEGRATED BUILDING DESIGN For: Andhra Pradesh Pollution Control Board A3, I.E.

Slides:



Advertisements
Similar presentations
BIM Education at Stanford University
Advertisements

Construction Method, Material Selection & Building Services
Contents: Cover
Enzyme Stabilized Mud (Earthen) Construction using DBV-1
Ferrous Infrastructure Pvt. Ltd. Ferrous City At Greater Faridabad.
Construction in the Future
The Must-See event for the World of Architecture and Construction MADE expo is the Italys leading international architecture, building and construction.
eQuest Quick Energy Simulation Tool
Skyscraper Construction
Chapter 16 Floor Plan Symbols.
P3Architecture and Sustainable Design Sustainable Design Strategies.
Commercial Building Project Portfolio
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
PowerPoint Presentation
Hope VI Residents Deserve Green Housing Affordable, Healthy Home Design Choices.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
Project 3 DS 413: Design Studio 413 May 9, 2010.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Design Features Structure Concrete slab floor (27’x25’x3”, 6.25 cu yards) Walls created with mud bricks (dry season) or concrete blocks (wet season) Aluminum.
Interior Construction
Sustainable Construction Technological Design Sustainable Construction © 2011 International Technology and Engineering Educators Association, STEM  Center.
Types and Construction Including framework and coverings
Benjamin Welle Stanford University Grant Soremekun Phoenix Integration
Forging new generations of engineers. CEA Presentations.
Construction Drawings
Intermodal Center / Multimodal Terminal Presentation Guidelines.
Mission Statement Axonometric View Site plan Floor Plan Roof Plan Plumbing plan South Elevation North Elevation East Elevation West Elevation Section.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
Green Homes Nancy Sierra Nicholas Acuavera 1A
code calculations, construction drawings
Design Development Code analysis Partition types.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Property Inspection & Analysis: The Improvements
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
AASHE CONFERENCE 2008 | BNIM Architects | people. innovation. design. Fayez S. Sarofim Building Institute of Molecular Medicine University of Texas Health.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Edexcel BTEC Level 2 Diploma in Construction Influencing Factors Unit 3 Sustainability in the Construction Industry.
土木工程概论 Introduction to Civil Engineering 第四章 建筑工程 Chapter 4 Building Engineering.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Elevations.
High Performance? “Greening” “Energy Efficient”
Building Environmental Systems
An-Najah National University
Fun Facts: James M. Bennett High School
Technological Design Sustainable Construction
Unit 6.05 and 6.06-Learning about blueprints
Architecture, Civil Engineer, and Interior Designer
INTEGRATED BUILDING DESIGN
Green Building Design An-Najah National University Engineering college
CEN 180: Civil Engineering Drawing II
Green Building and Sustainable Architecture
PLAN, NETWORK ANALYSIS AND 3D MODELING OF MULTISTORY BUILDING
Commercial Building Project Portfolio
BEEP Integrated Design Process for Energy Efficient Buildings
Elaborating The Committee Charter:
INTD 503- Materials Topic: Partition Walls
Green Building and Sustainable Architecture
1 Semester Project Design A Multi Story Office Building
Concept of Energy Efficiency
Green Building and Sustainable Architecture
Design Development Approach
© OnCourse Learning.
Presentation transcript:

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja INTEGRATED BUILDING DESIGN For: Andhra Pradesh Pollution Control Board A3, I.E. Sanath Nagar, Hyderabad Architect: Matrix Consultants 117, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad.

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja PROPOSAL General Requirements for office/Laboratory Building. 1.Chambers for Chairman, Member Secretary, Board Room and Mini Conference. 2.Office spaces for different wings like Environment Engineering, Environment scientist, Administration, Accounts, Cess, Public Information etc. 3.E-Library, Documentation Room, Auditorium, Applate Authority’s wing etc 4.Common facilities like Guest House, Lunch,/Canteen, Recreation, Parking etc 5.Wet Laboratory, Instrumentation Laboratory, Bio Laboratory, Air Laboratory etc. 6.Services like central Airconditioning, UPS, Communication Networking, Elevators, Generator, Security Systems etc.

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja CONCEPT Architecture: 1.Less Ground Coverage – More Open Spaces for Landscaping. 2.Central Landscaped Area for pleasant\, Visual and Environmental features. 3.Visual Identity of APPCB office building. 4.Open Planning System for Effective Spatial and Behavioral Advantages. 5.Minimum Internal walls, doors.

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja Contd… Environmental issues: 1.Conservation of Energy/ Alternate Energy Sources –Use of solar Energy for hot water generation. –Use of Automated Switch ON /OFF systems –Use of Energy Efficient Light Fixtures and Fittings. –Reducing Usage of Artificial Lighting/Ventilation by adapting to Solar Passive Architectural Design Techniques –Using Building Materials like Fly Ash Bricks, Gypsum Sheets etc Made out of Industrial Waste. 2.Minimum Use of Natural Resources –Use of Water Treatment/Recycling Plant. – No Use of Wood as Building Material –Rain Harvesting for Environmental Friendly Building

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja CONCEPT FOR INTERIORS Spatial Efficiency of space utilization Saving in Space – Cost Saving Optimum Exposure to Internal Green Areas Behavioral Inculcates Team Spirit Promotes Décor of Behavior Allows Transparency in dealings, increase in efficiency, trust and understanding

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja AREA STATEMENT DescriptionMax Allowable/ Min RequiredProposed Coverage1958 sq m (40%) sq m (33.3%) FAR area8566 sq m(1:1.75)4182 sq m Common Area2988 sq m(35%)1300 sq m (31%) Total Built up Area sq m5482 sq m Set Backs (G+2) Front Rear Sides 6m 4.5 m 4.5 m each 12m 5.5 / 8.5 m

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja BUILDING SPECIFICATIONS Reinforced Cement Concrete structure Fly ash brick masonry construction Metal frames and flush shutters Aluminum windows/ventilators with tinted/reflected glass Ceramic/vitrified tiles flooring for officers and graphite flooring for labs Internal walls with plastic emulsion and oil bound distemper paints.External walls with combination of girths and textured finishes Electrical, sanitary items with ISI mark. Interior partitions with gypsum board/particle boards Lighting with energy efficient fittings Smoke/ Heat detectors in labs/ Cellar Appropriate Security devices

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja METHODOLOGY Proposed methodology fro the project thus defined is as under: Structural Analysis and Design Energy Audit of the structure and Recommendations Use of Active Controls for better Performance Integration of Non Conventional Energy sources for energy optimization. Lighting & Acoustic Simulation and Recommendations Detailed Planning, Scheduling and Costing of the project Presentation drawings, perspective views, walkthru for the building

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja ARUN CONTINUES……

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja STRUCTURAL ANALYSIS AND DESIGN Analysis of the Building Frame as proposed. –Detailed Load Calculations –Footing Analysis as per the Calculated Loads and SBC –Optimum Frame Analysis using latest Commercially Available Software/ and comparing the same with self made module. –Submission of Detailed Computations.

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja Contd.. Design of Footings, Columns, Beams,Slabs and Misc. structure like Sun Shades, Parapets, Stairs etc –Optimum Section Designs as per the constraints given by the Architect –Design based on modules developed in house with necessary Drawings. –Submission of Detailed Report.

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja ANKUR CONTINUES……

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja ENERGY AUDIT Study of the proposed building with respect to the energy consumption –Study of energy efficient building materials and documentation of the same –Study of total energy load of the building Electrical load Cooling/heating load Solar energy load –Detailed computation of the total energy consumption of the building –Recommendations for optimizing the same: Architectural recommendations Material specification –Submission of report

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja ACTIVE CONTROLS FOR BETTER PERFORMANCE Identification of problem areas in the building where active control systems could help improve the total performance of the building envelop Detailed study of commercially available controls and documentation of the same Recommendations for adapting active controls along with quantitative benefits Preparation of necessary drawings, as per the requirement Submission of report

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja INTEGRATION OF NON CONVENTIONAL ENERGY SOURCES Working along the concepts of the design and also the requirements of the client: Study of possible and relevant non conventional energy sources along with the implementation details and intricacies Recommendations for the same along with quantitative benefits Submission of report.

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja LIGHTING/ACOUSTIC SIMULATION Identifying areas of importance for lighting/acoustic simulation within the building envelop Study of standards for optimum illumination/ /acoustic levels for identified areas Simulation of these areas using software tools Recommendations to achieve desired illumination /acoustic levels Submission of report

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja PROTIM CONTINUES……

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja PROJECT MANAGEMENT Estimation: –Earthwork –Concrete –Reinforcement Steel –Shuttering –Misc. Finishing Activities like Brickwork, Plastering, Sanitary Items etc. Requirement of Man Power, Materials and Machinery as per the above Estimate.

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja Contd… Planning: –Schedule of Work. –Schedule of Man Power –Schedule of Materials –Schedule of Machinery –Schedule of Cash Flow All the above includes Identification of Major and Minor Activities, Setting of Milestones, Determination of Critical Path and Resource Allocation. Preparation of Bar Charts supported with detailed quantitative analysis.

Project Team: Arun Vyas, Protim Banerjee, Sapan Agarwal, Ankur Thareja Contd.. Costing: –Optimization of Quantitative Parameters using standard linear optimization techniques –Analysis of Qualitative Constraints and selection of the best alternative so as to minimize cost related to the concerned Activity. –Summarization of Detailed Cost and Duration of the Project