ENERGY AND POWER  Bangladesh Development Forum 2010  DHAKA Ministry of Power, Energy & Mineral Resources Government of the People’s Republic of Bangladesh.

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
Dr. Kamal Kant Dwivedi Counselor (S&T) Embassy of India Washington DC,
November 13, 2009 Chairman, BPDB. 2  Electricity Growth : 5.8 % in % Av. since 1990  GDP Growth rate : Around 6 pc (last 5 years)  Installed.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Gas Statistics in Myanmar 24~26 September,2012 Beijing,China International Workshop on Energy Statistics Presented by Tin Zaw Myint Deputy Director Energy.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
1 By: Mr. Zafar Mahmood Chairman, Water and Power Development Authority OCTOBER 2014.
Sustainable Energy Development-Mongolian Energy Policy and Goals
Donors’ Conference on Sustainable Energy for Kosovo
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Hydropower Development: Experience of Nepal
MINISTRY OF OF ENERGY AND MINERALS DRAFT NATURAL GAS POLICY Presented By: Norbert. A. Kahyoza Assistant Commissioner for Natural Gas.
BY S. U. YAMUSA II AND A. H. ANSARI
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
A Developing Power System: Challenges & Prospects
 Dr. Ibrahim Togola The challenges of African Energy Policy in the 2010 Berlin,14th June 2010.
BUSINESS OPPORUNITIES IN SAUDI POWER SECTOR US-Saudi BUSINESS OPPORTUNITIES FORUM CHICAGO April 28-29, 2010 Ali Albarrak President &C E O Saudi Electricity.
E NERGY, E NVIRONMENT AND S USTAINABILITY Gaurav Shukla CUTS International.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Power Africa Governance Donor Partner WG November 14, 2013.
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
FY Preliminary AssessmentQuick Wins by 2015 National Sector Strategy ● Need the mid- to long-term Power M/P based on demand forecast.
State Policies and Energy Markets VINCENT S. PÉREZ Secretary Department of Energy REPUBLIC OF THE PHILIPPINES.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Electricity Reforms in Bangladesh
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
DATA COLLECTION ISSUES (DATA SOURCES, STATISTICAL UNITS AND APPROACHES TO DATA COLLECTION) PROBLEMS AND SOLUTIONS. By Salami R Ayodele National Bureau.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
1 South Asia Energy Regulation Partnership Executive Exchange Program October 7-9, 2002 Thimpu, Bhutan. Power Sector Regulation and Regulatory Policy in.
Updates on the RFE Energy Sector and the RFE LEAP model, and Implications of a Regional Alternative Path for the Russian Far East Victor Kalashnikov Economic.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
DEVELOPMENT COOPERATION FRAMEWORK Presentation by Ministry of Finance 10 December 2013.
(1). I.Introduction  The current situation of Energy Sector in Palestine II.The Strategic Objectives III.Energy Efficiency and Renewable Energy A.Strategic.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
World Environment Center International Environmental Forum European Roundtable Paris, France October 28-29, 2002.
Energy Development Schemes/ Energy Programs
Perspectives of Nuclear Energy Further development in Armenia A. A. Gevorgyan Obninsk, RF 27 June – 2 July 2004.
Moving Forward with Clean Energy Priyantha Wijayatunga Principal Energy Specialist, Asian Development Bank
Energy Transition: Reforms, Investment and the Post-Paris Agenda Dr. Robert Ichord CEO, ICHORD VENTURES, LLC February 4, 2016.
Implementing Power Rationing Programs The Tanzania and Uganda Experience Karen Rasmussen (AFTEG)
1 Per capita Energy Consumption National Energy Policy Declaration 1. Providing Basic Energy Needs 2. Ensuring Energy Security 3. Promoting Energy.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Ijaz Hossain Chemical Engineering Department, BUET Presented at: Roundtable on Energy – Future of Bangladesh-Korea Cooperation in Energy and Power Westin.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
Better Energy, Better World Cooperation in Natural Gas Industry between Russia and Korea Sept Better Energy, Better World.
Kenya’s INDC: Actions in the Energy Sector
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
WELCOME DbœZ RMr MVb Kiæb
Damitha Kumarasinghe Director General
REFLECTED IN JAMAICA’S ENERGY POLICY
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

ENERGY AND POWER  Bangladesh Development Forum 2010  DHAKA Ministry of Power, Energy & Mineral Resources Government of the People’s Republic of Bangladesh  15 February, 2010

22  Electricity Growth : 7.0 % Av. since 1990  Present Generation Capacity : 5250 MW  Total Consumer : 11.5 Million  Transmission Line : 8,300 km  Distribution Line : 2,60,000 km  Distribution Loss : 14.6 %  Per Capita Generation : 220 kWh / annum  Access to Electricity : 47 %  Current Avg. Daily Gas Prod. : 1970 MMCF  Curr. Daily Actual Gas Demand : 2200 MMCF  Remaining Gas Reserve (P1+P2) : 12 tcf  Estimated Coal Reserve : 3.3 billion tons

3  To make electricity available for all by the year 2020  To ensure reliable and quality supply of electricity  To provide electricity at a reasonable and affordable price  Regional energy security through mutual cooperation  Diversification of energy source  Accelerated adoption of an environment friendly policy to harness coal resources

4  National Energy Policy in 1996  Private Sector Power Generation Policy in 1996  Policy and Vision Statement in 2000  Regulatory Commission Act in 2003  Renewable Energy Policy in 2008  Enhancement of Private Participation in Power Sector in 2008  Updating of Energy Policy along with Coal Policy is being finalized  CNG opened to Private Sector

5  Rationalize Tariff  Strengthen BERC  Strengthen BAPEX  Strengthen Power Cell and Hydrocarbon Unit  Make SEDA functional to facilitate investment in renewable energy  Implement cross border power trading  Implement Power Sector Financial Restructuring & Recovery Plan  Introduce e-governance to ensure transparency and accountability  Petroleum Import and Distribution

6 IndicatorJanuary 2009December 2009 Gas production (MMCF) Coal Production (ton)677,000858,000 IndicatorPRS Target ( ) Achievement ( ) Achievement (2009) Distribution loss of BPDB (%) No. of consumers of REB increased (million) (total: 7.3)7.9 (total) Access to electricity (%) Installed Capacity (MW) B. Power: A. Energy:

7  Public Sector : 480 MW  Private Sector: 272 MW Subtotal: 752 MW (Commissioning expected by March 2010) UNDER CONSTRUCTION  Public Sector : 1720 MW  Private Sector : 980 MW Subtotal: 2250 MW (Commissioning expected by FY11-FY13) UNDER PROCUREMENT PROCESS COMMITTED  Public Sector : 995 MW  Private Sector : 450 MW Subtotal : 1445 MW (Commissioning expected by FY13-FY14) Total : 4897 MW

8 YearFY-09FY-10FY-11FY-12FY-13FY-14 Demand-Supply Gap (MW)

9 Mid term: Additional 300 mmcfd by 2012  Drilling of 7 appraisal/ development wells  Work over of 8 existing gas wells  Drilling of 4 exploration wells  DSM measures Long Term: Additional mmcfd by 2017  Drilling of 9 appraisal/ development wells  Drilling of 4 exploration wells under offshore bidding 2008  Steps taken to establish LNG terminal Energy

10  Steps taken to add around 9000 MW to the grid  Reached understanding with India for cross border trade  Renewable energy development through strengthening SEDA  Development of new transmission facilities e.g. 400 KV lines, NLDC, shunt compensation project etc.  Development of distribution network  DSM measures Power

11  Short term: 6-12 Months - Rental Plants (liquid fuel) : 530 MW  Medium term: Months - Peaking Plants (liquid fuel): 820 MW  Long term: 3-5 years - Combined Cycle Plants: 1100 MW - Peaking Plant (Gas or dual fuel): 200 MW - Coal plants: MW

 13  Shifting peak load by changing shop closer time reduce 350 MW demand  Staggering holiday: reduce 150 MW demand  Replacing ‘incandescent lamp’ by CFL: reduce 200 MW demand by June 2010  Introduction of DST  Steps to reduce ‘air-conditioning’ load  Energy efficiency improvement program by enhancing ‘Energy Auditing’  Ensuring efficient use of gas in all sector  Domestic use of gas would be gradually restricted and ultimately phased out by replacing it with LPG

15  Establish LNG terminal project to import LNG  Installation of Mega Power Projects through imported coal  Ensure regional energy security through mutual cooperation and import of energy  Use of liquid fuel to mitigate demand within short period  Nuclear power plants for future base load  Renewable energy as alternative energy resources

16  BERC is authorised to review and fix downstream price of energy products.  Refixation of gas price by BERC on 30 July  Gas Price increment : %  “Gas Development fund” created  Unbundling the entities of the energy sector  Energy entities are being operated on commercial basis.

SLName of the ProjectFuelCapacity (MW) 1.Bibiyana 2nd UnitGas Meghnaghat dual Fuel CCGas and HFO Bhola 2nd CCGas Savar Peaking (near tannery industry) Gas and HFO Kaliakoir Peaking (near IT park) Gas and HFO Imported Coal Based Steam Plant Imported Coal Total3925 MW  17

 18 DescriptionTotal Investment (Million US$) Equity (Million US$) Debt (Million US$) New Initiative 530 MW Rental Projects ( 25 % ) 318 ( 75 % ) New Initiative 820 MW Public Sector Peaking Plant ( 40 % from GOB) 600 ( 60 % ) Combined Cycle and Peaking Plants in Private Sector: 1325 MW ( 25 % ) 1125 ( 75 % ) Solar and Wind Projects: 110 MW ( 25 % ) 150 ( 75 % ) 2600 MW Coal PPP ( 25 % ) 3000 ( 75 % ) Total7.1 billion US $

19 DescriptionLengthEstimated Cost (Million Tk.) 400 KV Line from Bahrampur, India to Bheramara, Bangladesh 45 km (Bangladesh) 11, KV Line from Khulna to Dhaka 200 km 9, KV Line from CTG to Dhaka 260 km 16, KV Line from Sylhet to Dhaka 226 km 20,102

 20  Generation : 7,000 M US $  Transmission: 1,000 M US $  Distribution: 1,500 M US $ Total for Power: 9,500 M US $  LNG terminal : 320 M US $  tcf Gas by 2025: 7,700 M US $  Gas Transmission : 1,500 M US $ Total for Gas: 9,520 M US $

21  Sustained primary fuel supply: gas, coal and petroleum products  Financing capital intensive projects  Enhancing operational and financial efficiency and transparency  Improving sector efficiency by strengthening regulation capacity and ensuring good governance

22  Establish LNG terminal to mitigate present gas crisis  Strengthening of BAPEX  Accelerate exploration and production drilling  Develop cross border pipeline under PPP  Coal fired power generation under PPP to reduce burden on natural gas  Make SEDA functional to facilitate investment in renewable energy  Implement cross border power trading  Strengthen Power Cell and Hydrocarbon Unit  Implement Power Sector Financial Restructuring and Recovery Plan  Reduce extreme dependence on natural gas through diversification of energy

23  Continued funding, including technical assistance for public sector projects  Assistance in capital mobilization for private sector projects, particularly from IFIs  Continued technical support for energy sector reforms and restructuring  Exchange of information and experience, technical cooperation and human resource development

 24  Government is committed to realize it’s ‘Vision’  Government is committed to ensure transparency in the procurement process  Private Sector will play a key role to meet the challenge of huge amount of financing requirement  Continuous efficiency improvement ensuring good governance is key for sustainable development  Concerted efforts from all quarters can ensure affordable and quality power supply to the people of Bangladesh  Role of DPs is important

 25