08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)

Slides:



Advertisements
Similar presentations
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Advertisements

HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Skyscraper Construction
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction.
The building. The crane The crane lifted the big beams into the building. First they got a small crane then because it was too small they got a bigger.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 Installation of Delphi Frame  ITS Installation.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
May 5, 2004H.J. Krebs LST Installation Readiness Review 2004 IR-2 Installation Schedule H.J. Krebs May 5, 2004.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Construction and Installation of the CLIC Experimental Area
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
West Manchester Library “Thirty-five years of providing Library Services on the West Side April 7,1980 to today”
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
Created site awarenessRecover personal equipment Opportunity to take abandoned equipment.
MICE MICO September ‘07 Chris Nelson. Beamline and Hall Shielded area virtually complete –SW corner –Replacement West wall concrete ordered, corner pieces.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
UCN 2014 Installation Overview/Logistics UCN Monthly Meeting Dec.18, 2013 (L.Lee)
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
L-band test stations in End Station B Richard Swent.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
Welcome! Yes, we’re still in assigned seats. Yes, we’re still in assigned seats. No, we’re not going to be reading today. Unfortunately, there’s too much.
WHAT IS WORK?. Work when you exert a force on an object that causes the object to move some distance Work is done when the object moves in the same direction.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
MTA Installation Meeting March 7, 2007 Agenda 1)Progress report (Fernanda) 2)Water skid discussion (Maurice) 3)Alignment needs (O’Sheg + all) 4)AOB Key.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
MTA Installation Meeting February 21, 2007 Agenda 1)Progress report (Fernanda+Carol) 2)Floor Plan layout (Fernanda+Larry) 3)AOB Key Red – critical Orange.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Experimental hall design in Japanese site
Extract from today’s talk given to DCB
Polarized 3He target installation
Presentation transcript:

08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)

08/24/07Shutdown’07 Week 3 F.G. Garcia2 MTA Weekly Report – Week 3  Shielding underneath hatch area Crane showed up last Friday (Aug 17 th )  Shielding blocks were completely removed by early Monday morning (1.5 days)  Crane was heavily used for: Lift 3 barrels full of concrete (old ramp) Lowering auxiliary equipment to aid the magnet installation Lowering all magnets in the tunnel Lowering all the LCW pipes, cable trays Lowering most of the big cable spools Next week: - Crane/Iron Workers will be moved to another job site. Expect to return Tuesday (08/28) Parking lot will remain roped off during this time. - Leveling the floor will occur during this time.

08/24/07Shutdown’07 Week 3 F.G. Garcia3 MTA Weekly Report – Week 3  Electrical Work 70% cable tray have been installed Most likely will finish the MTA stub side today Next week: Take a guess! MTA cable tray

08/24/07Shutdown’07 Week 3 F.G. Garcia4 MTA Weekly Report – Week 3  Alignment Completed the network and stake out the MTA stub area Assisted on measurements for the core drill Next week: Check magnets stationing and elevation  Core Drill Core drill of 3 blocks was successful performed yesterday  Some other cuts were also done in order to get the right amount of shielding blocks for the new wall.

08/24/07Shutdown’07 Week 3 F.G. Garcia5 MTA Weekly Report – Week 3  Magnet installation Being performed by Iron Workers  40% magnets in place Remaining will be stationed today Next week: proceed with spool pieces after elements have been surveyed.

08/24/07Shutdown’07 Week 3 F.G. Garcia6 MTA Weekly Report – Week 3  LCW work Pipe fitters starts their activities today!  1 day ahead of schedule …for a change! In reality, not too bad for the MTA real first week of tunnel activities…