TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.

Slides:



Advertisements
Similar presentations
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
LHC Machine Interlocks & Beam Operation LHC Machine Interlocks & Beam Operation ARW2011Bruno PUCCIO (CERN) 13 th April v0 Thanks to Benjamin Todd.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
TE-MPE-TM 02/08/2012, TE-MPE-MS section RENOVATION OF SPS MAGNET INTERLOCK SYSTEM 1 CURRENT SITUATION CONSOLIDATION PROPOSALS Y.Bastian, P.Dahlen, R.Mompo,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
Machine Interlocks in the Injectors MPE-TMB. Puccio & al.25 th Aug v0.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
Chiller control system Lukasz Zwalinski – PH/DT.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Interlocks for Magnet Protection System Iván Romera Ramírez, Markus Zerlauth - CERN.
Status of ITER collaboration for Machine Protection I. Romera On behalf of the colleagues who contribute to the project Thanks to: Sigrid, Markus, Rüdiger,
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Machine Interlocks in the Injectors IEFC workshopBruno PUCCIO (TE/MPE) 22 nd March v0.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
60kW Thermosiphon control system
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
TE-MPE- Post LS1 Review: 02 & 03/06/2015, Richard Mompo Upgrade, IST and Powering tests of the WIC systems Richard Mompo for the WIC team 1.
TE-MPE-TM 27/06/2012, TE-MPE-MS section SPS RENOVATION Final design and status 1 R.Mompo, P.Dahlen, Y.Bastian, I.Romera, M.Zerlauth.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Status And Plans For Consolidation Of Magnet Protection Systems And Interlocks TE-MPE A. Siemko 12/09/2013 Accelerator Consolidation Workshop2.
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Beam Interlock System SPS CIBU Connection Review
Injectors BLM system: PS Ring installation at EYETS
LV Safe Powering from UPS to Clients
prepared by R.A.Barlow 30/056/2016
Installations, modifications, consolidation in 2005:
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
352MHz Klystron Control for the 3MeV Linac test stand
WIC deployment and commissioning in HIE-ISOLDE
Interlocking of CNGS (and other high intensity beams) at the SPS
M. Zerlauth, I. Romera 0v1.
TS2 PSS Architecture, Concepts of Operations and Interfaces
SPS Injection BIS - Draft requirements
Presentation transcript:

TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation - Linac 4 - HIE-ISOLDE - PS - Other projects - SPS: See Yan’s dedicated presentation Co-authors: Markus Zerlauth, Pierre Dahlen, Ivan Romera Ramirez, Richard Mompo and Yan Bastian 1

TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC (Warm magnet Interlock Controller) layout Standardized interlock system for normal conducting magnets based on SIEMENS PLC (Programmable Logic Controllers): –Collects inputs from thermo-switches, flow switches, PC faults… –Then gives the Power Permit to the power converter + Beam Permit to BIS (LHC) Configuration DB

TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC principle The Warm magnet Interlock Controller is a PLC based system, using deported I/O crates (connected via Profibus). The Siemens “F” (F stands for Fail safe) Series PLC is used, offering a self checking safety environment and programming through ‘Safety Matrix’. We use generic SW and (to some extent) HW for all our installation, to allow for efficient and resource optimized installation, commissioning and operation. The program running in the WIC is extremely simple IF (Magnet Overheats) OR (Flow Switch opens) THEN [According to the Configuration file] Switch-off the relevant PC(s) 3

TE-MPE-TM 09/08/2012, TE-MPE-MS section Interlock boxes Interlock boxes are placed on or close to each magnet to collect all input signals. For maintenance purpose, a remote test feature is implemented (by means of a relay) in order to simulate the opening of any input signal. This operation can be done remotely and allow us to check periodically the installation during shutdowns.

TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC elements installed in LHC tunnel Thermoswitch - ELMWOOD Type 3106 – T117 (responsibility of TE-MSC) Magnet Interlock Box with relay to simulate the opening of a thermoswitch Note: Only the Magnet Interlock Boxes are installed in the LHC tunnel (I/O crates are installed in US/UJ/TZ areas)

TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC systems currently in Operation 17 Controllers & ~ 310 I/O crates ~ 1000 magnets are protected WIC  LHC (2007)  TT60 & Ti2 TT66 (Hi Rad Mat.) 4 c.  TT40 & Ti8 (2004) 2 c. WIC  TT41 (CNGS) 1 c. WIC  LEIR (2005) 1 c. (2009) 1 c. WIC 8 controllers  LINAC3WIC (2005) (2010) Courtesy of Pierre Dahlen

TE-MPE-TM 09/08/2012, TE-MPE-MS section PLC & PVSS programming The programming of the PLC is done in collaboration with EN/ICE-PLC. The Programming of the PVSS supervision is done in collaboration with EN/ICE- SCD. The advantages of having a supervision: o On line status of the full installation (Magnets & PCs). o Communication statuses: Ethernet and Profibus. o Full diagnostic with exact location of faults o Archiving of all faults (History Buffer) in SCADA + LHC Logging o Full integration in DIAMON + LASER (Alarm system) o Allows remote operation, supervision and testing of the installation o We receive a warning message in case of problems on one of the PLC power supplies (true redundancy). 7

TE-MPE-TM 09/08/2012, TE-MPE-MS section BOOSTER Project 8 The PS Booster is a synchrotron composed of four superimposed rings divided into 16 periods. It delivers a variety of beams for the downstream PS, SPS and LHC machines as well as high intensity beams for ISOLDE.

TE-MPE-TM 09/08/2012, TE-MPE-MS section 9 BOOSTER Project View of a typically period Mains: -2 Dipoles: BHZ11 & BHZ12 -2 Focusing quadrupoles: QFO11 & QFO12 -1 Defocusing quadrupole: QDE Multipoles: Different configuration per period (cf. slide 12)

TE-MPE-TM 09/08/2012, TE-MPE-MS section 10 BOOSTER Project Spare quadrupole magnet Quad installed in the Booster Multipole Stack: XNO/XSK/ONO/OSK Magnets views in the Booster machine

TE-MPE-TM 09/08/2012, TE-MPE-MS section 11 BOOSTER Project Due to the configuration file in which we cannot exceed 20 input modules (=480I) and 80 output for the Power-converters, we have to use 4 PLC to control all the magnets and the 177 Power-Converters: -PLC1 with 16 Deported units CIWRA_11 to CIWRA_116 for the main magnets inputs which control 3 Power-Converters. -PLC2 with 16 Deported units CIWRA_21 to CIWRA_216 for the 1 st Multipoles which control 22 Power-Converters. -PLC3 with 6 Deported units CIWRA_33 to CIWRA_316 for the 2nd Multipoles which control 72 Power-Converters. -PLC4 with 5 Deported units CIWRA_42 to CIWRA_412 for the 3nd Multipoles which control 80 Power-Converters.  174 interlock boxes will be installed on the magnets to collect the signals from thermo-switches as well as to carry out the remote tests.

TE-MPE-TM 09/08/2012, TE-MPE-MS section 12 BOOSTER Project Distribution of the Power-converters for the multipole magnets based on the PLC where they are connected

TE-MPE-TM 09/08/2012, TE-MPE-MS section Linac4 Project 13 2 PLCs will be installed in Linac4 -1 st PLC which controls 50 magnets and 65 Power-converters for the Linac4 line -2 nd PLC which controls 39 magnets and 45 Power-converters for the transfer line. Linac4 Transfer line

TE-MPE-TM 09/08/2012, TE-MPE-MS section Linac4 Project The DIC for the installation has been sent to EN/EL PLC for LINAC4 will be installed in rack: MYWIC01 PLC for Transfer Line will be installed in rack: MYWIC02 LS1 After LS1 (July-Dec 2014): Closing line for protons Commissioning to 100MeV After LS1 (July-Dec 2014): Closing line for protons Commissioning to 100MeV WIC commissioning

TE-MPE-TM 09/08/2012, TE-MPE-MS section Layout stage 1 Layout stage 2 Independent powering of each magnet (115 PCs) WPD ready to be circulated for approval 2 PLCs (11 I/O crates) + 8 patch panels + 90 Interlock boxes to produce HWC of the WIC planned for June – August 2014 HIE-ISOLDE project Magnets to be protected by a WIC system

TE-MPE-TM 09/08/2012, TE-MPE-MS section PS project Officially still under the responsibility of EN-MEF-INJ. o But R. Brown is leaving for retirement in Feb. 2013, TE-MPE + TE-MSC to take over responsibility thereafter (Memo to be written) R. Brown gave us a visit of the installation in Bldg. 355 & Bld. 365 on o Conclusion of the visit: Last consolidation was done in There are enough spares for the correctors, but the spare crate for the mains was cannibalised! Our priority is to re-cable and test this spare crate o We found all missing components. o The drawing for the cabling that we have is not up to date! It does not include modifications done after TE-EPC exchanged the main power supply (POPS). Action foreseen during next TS. During LS1, some refurbishment of the installation will require some modification to the existing installation! o Mainly to remove interlock switches on some cabinets that will be removed. No WIC deployment/renovation is foreseen for the PS for the LS1 period, but will be discussed for LS2. 16

TE-MPE-TM 09/08/2012, TE-MPE-MS section Other projects Ti2-Ti8-TT40: o Consolidation of existing system by adding remote testing feature (some 900 magnet interlock boxes to be modified + 40 remote I/O crates!) ELENA: o Not started as postponed by 1 year (2016?), plan is still to finalise the design this year. Block4, SM18, FRESCA: o Not started, no date for completion yet o Time frame to be agreed with QPS plans, probably between LS1 and LS2? S-FRS magnet test facility (Bldg. 180): o Not started, no date for completion yet o Time frame to be agreed with QPS plans, probably between LS1 and LS2? North zone consolidation project? o Big project (400 magnets & PCs)! o Nothing decided yet, pre-study for early 2013, then project and budget to be approved o Time frame >=LS2 Other projects + SPS renovation: See Yan’s presentation! + SPS renovation: See Yan’s presentation!

TE-MPE-TM 09/08/2012, TE-MPE-MS section Thank you for your attention! 18