Status And Plans For Consolidation Of Magnet Protection Systems And Interlocks TE-MPE A. Siemko 12/09/2013 Accelerator Consolidation Workshop2.

Similar presentations


Presentation on theme: "Status And Plans For Consolidation Of Magnet Protection Systems And Interlocks TE-MPE A. Siemko 12/09/2013 Accelerator Consolidation Workshop2."— Presentation transcript:

1

2 Status And Plans For Consolidation Of Magnet Protection Systems And Interlocks TE-MPE A. Siemko 12/09/2013 Accelerator Consolidation Workshop2

3 Outline Renovation of Warm Magnet Interlocks in the Accelerator Complex BIS V2.0 – Beam Interlock System for LHC and Injectors LHC PIC_V2.0 - Powering Interlock System V2.0 for SC Magnets Consolidation of the LHC Quench Detection Systems Consolidation of the LHC Energy Extraction Systems Summary 3 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

4 Outline Renovation of Warm Magnet Interlocks in the Accelerator Complex BIS V2.0 – Beam Interlock System for LHC and Injectors LHC PIC_V2.0 - Powering Interlock System V2.0 for SC Magnets Consolidation of the LHC Quench Detection Systems Consolidation of the LHC Energy Extraction Systems Summary 4 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

5 Baseline for Warm Magnet Interlocks in the Accelerator Complex 5 Standardized interlock system for normal conducting magnets based on Programmable Logic Controllers (PLC): –Collects inputs from thermo-switches, flow switches and internal PC faults –Provides Permits to the power converter and beam interlock system Configuration DB A. Siemko 12/09/2013 Accelerator Consolidation Workshop

6 Four varieties of existing ‘Magnet Interlocks’ SPS mains and auxiliaries PS mains and auxiliaries AD, CTF3, n-TOF, East Zone… + Direct cabling (patch panels) North Zone 6 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

7 7 * In accordance with L4 project schedule ** Not renovated but under MPE responsability * Done or approved and ongoing Status of renovation Proton Chain (MPE baseline to complete by end LS2) Ion Chain (completed) Other machines / experimental facilities (MPE baseline to complete by end LS3) Linac2 No renovation, as obsolete with LINAC 4 Linac3Since 2009nTOFNo Linac4LS1LEIRSince 2005ADNo Linac 4 TL to PSBNo (LS2?)*ElenaIn 2015/2016 PSB ringsLS1PS East areaNo TL PSB to PS/ISOLDENo (LS2?)HIE IsoldeAfter LS1 PS** No (LS2?)SPS West areaNo (no equipment) TT2No (LS2?)TCC2No TT10**No (LS 2?)CTF3No (but pre-study done) SPSLS1SPS North AreaNo (but pre-study done) TT40/Ti8 Since 2004/5 TT41/TT66Since 2005/10 TT60/Ti2AwakeNo (2015/16) LHCSince 2007 Test facilites: (Block4, SM18, Fresca, S-FRS,...) No A. Siemko 12/09/2013 Accelerator Consolidation Workshop

8 Required Budget and Spending Profile 8 Nota bene: List includes solely outstanding renovations in PS complex Cabling – > ~ 75% of project budget A. Siemko 12/09/2013 Accelerator Consolidation Workshop

9 Outline Renovation of Warm Magnet Interlocks in the Accelerator Complex BIS V2.0 – Beam Interlock System for LHC and Injectors LHC PIC_V2.0 - Powering Interlock System V2.0 for SC Magnets Consolidation of the LHC Quench Detection Systems Consolidation of the LHC Energy Extraction Systems Summary 9 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

10 Beam Interlock System V2 MOTIVATION: Main components are obsolete (CPLD, FPGA, Optical devices, etc.) Aging of Power Supplies and Optical components. Enhance monitoring of the (Optical) Beam Permit Loops Currently protecting SPS ring, TL SPS/LHC, Injection regions & LHC ring Will protect soon Linac4 (Q4/13 and 2014) and later on PSB (>2015) Design choices made in 2003, operating for SPS ring since 2006 Controllers x50 User Interfaces x370 + Manager board Optical cards Budget Profile: 600kCHF (2015), 1100k (2016), 1100k (2017) & 400k (2018) 10 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

11 Cost breakdown QuantityNameCost per unit (kCHF)Total (kCHF) 50VME-crate (or substitute)15750 50Set of BIC boards for backplane connection3.0150 100Set of BIC boards for Safety & Monitoring4.0400 350User Interface (copper link variant)2.5875 50User Interface (f.o. link variant)3.0150 2475 Renewal of all f.o. links200 Prototyping100 4 m/yFSU Lab tests, Installation, Commissioning)400 Approximate renovation cost ~ 3200kCHF ~50 Crates: LHC(17), INJ(2), EXT (8), SPS(6), L4(3), PSB(3), LAB(7), SPARES(4) ~90 Controllers: LHC(34), INJ(4), EXT (14), SPS(6), L4(6), PSB(6), LAB(8), SPARES(~10) 11 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

12 Required Budget and Spending Profile Activity 201320142015201620172018 LS3-3LS3-2LS3-1 SUM Comments BIS v2 for LHC ring & Injection - - 200 350 150 - - - 1,050 Due to obsolescence of main components & for Monitoring enhancement BIS v2 for PS ring + TT2 + TT10 - - - - 125 - - - 250Note: Not yet included in LIU-PS BIS v2 for SPS & TL - - 400 750 250 - - - 2,150 Due to obsolescence of main components & for Monitoring enhancement BIS v2 Total 600 1,100 1,225 525 3,450 12 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

13 Outline Renovation of Warm Magnet Interlocks in the Accelerator Complex BIS V2.0 – Beam Interlock System for LHC and Injectors LHC PIC_V2.0 - Powering Interlock System V2.0 for SC Magnets Consolidation of the LHC Quench Detection Systems Consolidation of the LHC Energy Extraction Systems Summary 13 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

14 Powering Interlock System V2.0 for sc magnets MOTIVATION: Design dating back to 2004, operating since 2005. Several electronic components have become obsolete. - CPLD and HMS Anybus I/O modules not produced anymore - Aging of power supplies and optocouplers (>10 years of operation in areas exposed to radiation) - SIEMENS announced discontinuation of CPU 319 series NEW FEATURES: -Improve dependability (redundant reading of current loops, redundant links to Beam Interlock System, …) -Enhance monitoring of safety critical hardware current loops -Improve maintainability of the system 14 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

15 Cost breakdown QuantityNameCost per unit (CHF)Total (CHF) 40SIMATIC S7-300 CPU 319-33600144000 80SITOP MODULAR 10 A POWER SUPPLY15112080 40 SITOP PSE202U REDUNDANCY MODULE722880 40SIMATIC S7, MICRO MEMORY CARD33013200 40 SIMATIC S7-300, DIGITAL INPUT SM 3211305200 150AnyBus I/O Module *25037500 ~400PCBs, Assembly, diverse components50000 (lot)50000 220AC-DC modules357700 2000Optocouplers2.55000 40CPLD251000 Radiation tests of components20000 Additional cabling (redundancy,..)30000 Approximate renovation cost ~ 400kCHF (no replacement of existing cabling) Due to limited resources project is postponed after LS2 15 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

16 Required Budget and Spending Profile 16 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

17 Outline Renovation of Warm Magnet Interlocks in the Accelerator Complex BIS V2.0 – Beam Interlock System for LHC and Injectors LHC PIC_V2.0 - Powering Interlock System V2.0 for SC Magnets Consolidation of the LHC Quench Detection Systems Consolidation of the LHC Energy Extraction Systems Summary 17 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

18 Consolidation of the LHC Quench Detection Systems MOTIVATION: Design of important part of electronics dating back to late ‘90, operating since 2007. Electronic components become successively obsolete. Original baseline assumed minimum number of spare parts and subsequent replacement of electronic boards (ca. 16000 boards in total) in function of the obsolesces of the components and/or their vulnerability to radiation induced phenomena Ongoing process After LS1 the main concerns are: vulnerability of the field-bus coupler chip of the MICROFIP type Obsolesce of several quench detection boards New DAQ systems based on the new radiation tolerant NanoFip are planned to be implemented Replacement of several board families is mandatory in order to eliminate obsolesce of the components and to improve their radiation tolerance 18 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

19 Required Budget and Spending Profile 19 R2E consolidation spending is not included in the above A. Siemko 12/09/2013 Accelerator Consolidation Workshop

20 Outline Renovation of Warm Magnet Interlocks in the Accelerator Complex BIS V2.0 – Beam Interlock System for LHC and Injectors LHC PIC_V2.0 - Powering Interlock System V2.0 for SC Magnets Consolidation of the LHC Quench Detection Systems Consolidation of the LHC Energy Extraction Systems Summary 20 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

21 600A Energy Extraction Systems 202 systems installed in the LHC tunnel in corrector circuits with stored energy between 2.2 and 150 kJ In 15 different locations; 8 x UA parallel service tunnel and 6 x RR and 1 x UJ tunnel caverns Systems developed in close collaboration between CERN and the Budker Institute of Nuclear Physics (BINP), Novosibirsk, Russia. 21 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

22 Main Failure causes 1- Loosening of holding coil mechanism Weak design of U-shaped support structure 2- Micro-switch not actuated Tolerances in dimensions of housing 3- Main axle fixation Weakness during production – failure rate not increasing so far 22 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

23 Why worry after LS1?  Manufacturer closed premises in 2012 and the production suspended  Breakers are now obsolete  Still 60 spare breakers available  Spare consumption rate (before LS1) approx. 10/year 6 years of operation !!  Spare consumption rate after LS1 is under evaluation 23 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

24 Required Budget and Spending Profile Activity 201320142015201620172018 LS3-3LS3-2LS3-1 SUM Comments 600A Energy Extraction system - 300 350 4,800 900 - - - 6,700 Due to known issues with the 600A EE switches and bankruptcy of the only supplier (Russian). 13kA Energy Extraction system 100 50 200 250 600 Replacement of control and acquisition electronics Total - 300 450 400 5,000 1,150 7,300 24 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

25 Outline Renovation of Warm Magnet Interlocks in the Accelerator Complex BIS V2.0 – Beam Interlock System for LHC and Injectors LHC PIC_V2.0 - Powering Interlock System V2.0 for SC Magnets Consolidation of the LHC Quench Detection Systems Consolidation of the LHC Energy Extraction Systems Summary 25 A. Siemko 12/09/2013 Accelerator Consolidation Workshop

26 Cons type Activity201320142015201620172018 LS3 -3 LS3 -2 LS3 SUM Comments LHC- CON S BIS v2 for LHC ring & Injection - - 200 350 150 - - - 1,050 Due to obsolescence of main components & for Monitoring enhancement 600A Energy Extraction system - 300 350 4,800 900 - - - 6,700 Due to known issues with the 600A EE switches) and bankruptcy of the only supplier (Russian). 13kA Energy Extraction system - - 100 50 200 250 600 Replacement of control and acquisition electronics QDS electronics consolidation - - 200 600 200 - - - 1,600 PIC v2 - - - - - - 80 220 100 400 Due to manpower restrictions both project are at present planned after LS2 QPS v2 (= QDS v2 + EE v2) - - - - - - - - - - LHC-CONS Total - 300 850 1,300 5,950 1,500 80 220 100 10,350 LHC-CONS profile 26

27 PS/SPS/N.A./AD-CONS profile Cons type Activity201320142015201620172018 LS3 -3 LS3 -2 LS3 SUM Comments PS- CON S WIC for PS ring --- 50 160 210 --- 420 No resources (manpower) available to proceed with the PS consolidation WIC for TLs (PSB to PS, TT2,TT10) --- 100 230 --- 560 WIC for TL Linac4 to PSB --- - 60 --- 120 BIS v2 for PS ring + TT2 + TT10 --- - 125 --- 250 Not yet included in LIU-PS PS-CONS Total - - - 150 575 625 - - - 1,350 SPS- CON S WIC for SPS ring (phase 1) 38050- - - - --- 1,180 most of "Phase 2" postponed after LS2 “ “ “ (phase 2) ---150 - - 200 BIS v2 for SPS ring + TL --400750 250--- 2,150 together with BIS v2 for LHC SPS-CONS Total 380 50 400 900 750 250 200 3,330 (not in LHC inj. chain) WIC for North Area --- 250 --- 750 No resources (manpower) available to proceed with the N.A. consolidation WIC for AD ------ -210 420 Grand Total 380 50 400 1’300 1’575 1’125 200 410 5’850 27

28 Risk analysis for MPE projects risk analysis Cons typeActivityPIoIrIfIsΣiΣiRsRs' Budge t LHC-CONS BIS v2 for LHC & Injection regions 2 4 3 3 10.3082.4 1,050 600A Energy Extraction system 3 4 3 3 10.30123.6 6,700 13kA Energy Extraction system 253310.30103.0 600 QDS electronics consolidation 3 4 3 3 10.30123.6 1,600 PIC v2 2 4 2 3 10.3082.4 400 QPS v2 (= QDS v2 + EE v2) 3 4 3 3 10.30123.6 ? PS-CONS WIC for PS ring 2 3 2 2 10.5563.3 420 WIC for TLs (PSB to PS, TT2,TT10) 2 3 2 2 10.5563.3 560 WIC for TL Linac4 to PSB 2 3 2 2 10.7564.5 120 BIS for PS ring + TT2 + TT10 2 3 3 3 10.5563.3 250 SPS-CONS WIC for SPS ring (phases 1 & 2) 2 3 2 2 10.4562.7 1,180 BIS v2 for SPS ring & TL 2 4 2 2 10.4583.6 2,150 (not in LHC inj. chain) WIC for North Area 2 3 2 2 10.1560.9 750 WIC for AD 2 3 2 2 10.1060.6 420 Rs = P × max(Io;Ir;If;Is) Rs’ = Rs × Σi 28

29 Other Consolidation profile Cons type Activity201320142015201620172018 LS3 -3 LS3 -2 LS3 SUM Comments (not in LHC inj. chain) WIC for PS East area ------ -120 240 No resources (manpower) available to proceed with these consolidations WIC for TL PSB to Isolde ------ -60 120 WIC for TTC2 ------ -120 240 WIC for Awake --25 ----- 50 Total - - 25 - - - 300 650 29

30 Conclusions 30 MPE is proceeding as a function of allocated resources with the renovation of interlocks in the accelerator complex Priorities of renovation need to be agreed (to take into account physics priorities) and must be coherent with other renovation programmes (mainly TE-EPC and EN-EL) MPE proposal is to complete main proton/ion chain until end LS2 Experimental facilities until end LS3 Due to successive obsolesce of electronic components consolidation of the LHC magnet protection systems is a continuous process In case of the quench detection electronics it is not easy to decouple “pure consolidation” from R2E upgrades Bankruptcy and closure of premises of Russian manufacturer of unique 600A energy extraction breakers forces us to develop an alternative solution A. Siemko 12/09/2013 Accelerator Consolidation Workshop