(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Agenda: First steps using WinCC OA First steps using UNICOS V5 Vacuum Test Rig Principles of.

Slides:



Advertisements
Similar presentations
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Advertisements

1 iHome Automation System Home Automation System Team: Million Dollar Contingency Regiment Adam Doehling Chris Manning Ryan Patterson.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Seismic Octave Programming for Analog/Digital Converters Michael W. Siekman Electrical and Computer Engineering Senior Capstone Design Project 2007 Advisor:
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Time Stamping and archiving of PLC data
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
UNICOS-like system for interlocks II Workshop on PLC-based interlocks systems ITER, Dec 2014 Jeronimo ORTOLA VIDAL CERN Engineering Department, Industrial.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
CONSOLIDATION OF THE CONTROL SYSTEM OF THE SUBU CHEMICAL POLISHING MACHINE TE-VSC-ICM Automation Forum João Rodrigo Alvelos Ferreira 20th November 2014.
FwSPY and UNICOS-CPC Benjamin Bradu Giulio Morpurgo CERN, EN-ICE May2015.
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
Project By:. 2 Agenda Introduction Problem Definition Proposed Solution Block Diagram Flowchart Technical Implementation Hardware & Software Requirements.
PLC introduction1 Discrete Event Control Concept Representation DEC controller design DEC controller implementation.
PLC: Programmable Logical Controller
Automatic Generation Tools UNICOS Application Builder Overview 11/02/2014 Ivan Prieto Barreiro - EN-ICE1.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
A new class in PC Data Acquisition Delphin Technology AG Felix Ottofuelling V5.0.
Project: Flexible Manufacturing System Manufacturing of segment display units.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
INTERFACE DESCRIPTION PLC objects and HMI 2 CERN, EN/ICE, UNICOS Team.
FAIR Accelerator Controls Strategy
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Industrial Control Engineering UNICOS device and front-end Hervé Milcent UNICOS device front-endHervé Milcent1.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Petra III Status Teresa Núñez Hasylab-DESY Tango Meeting DESY,
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Status of Vacuum Control System MACS week June 2011 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
News from LAL on Vacuum System Racks for cryotraps: call for tender done provider selected purchase of electro-tech components in progress prototype expected.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
60kW Thermosiphon control system
Toward UNICOS Major Tasks to be Done Leonid Kopylov TE-VSC-ICM.
Industrial Control Engineering Infrastructure: EN/ICE needs Wrap up Mandate: WG Infrastructure to establish the needs for an ICE server pool and study.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
April 2005OLAV Workshop Diamond Vacuum Controls Hugo S Shiers.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
Vacuum Controls framework for the LHC and its injectors Sebastien Blanchard CERN TE-VSC Integration of controllers in SCADA using OPC Server Goal: Improve.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
UNICOS-CPC course - CERN EN/ICE Industrial Controls Engineering Department Deployment of the CPC6 control application Marc Quilichini
Hydraulic Trainer
UNICOS Application Builder Architecture
National Centre for Nuclear Research, Poland
SCADA & Monitoring Developments for Vacuum
FCT and CERN Portuguese Trainee Programme Report
SCADA Application Service updates in TS1
Current Status of IPM-Linac Control System
Status of Vacuum Control System
Recent developments in the Vacuum Control Software
Engineering - potential areas for action
MAUVE CO2 cooling review
XFEL Vacuum System Commissioning
Cryogenic C&C Scope of work
Unicos Vacuum Package SCADA Features Vacuum Controls S. Blanchard
SC1R Cold Box PDR Controls
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Vacuum Control System for Monolith Vacuum
Project Migration / Management
Presentation transcript:

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Agenda: First steps using WinCC OA First steps using UNICOS V5 Vacuum Test Rig Principles of electrical design Test Rig configuration Commissioning steps What is needed from vacuum experts? Device specification for vacuum library Functional system descriptions and diagrams Design approaches of vacuum system panels First approach for the workflow of the FAIR vacuum CS design First approach for the vacuum simulation system Stand C.Betz CSCOIC "Industrial Controls" 1

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) First steps using WinCC OA: WinCC OA application for access control of System was updated because the old software is only usable under WINDOWS NT System has been successfully migrated to WinCC OA V3.10 Commissioning is planned for this year Problem so far is the server installation and the choice of the type of UI GSI wish to find a solution without needs of heavy software pieces inside the client PC, probably Ultralight client (WinCC OA 3.11 or 3.12 needed) Stand C.Betz CSCOIC "Industrial Controls" 2

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 3

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) First steps using UNICOS: Trying to understand UNICOS itself Learning to install the framework in WinCC OA applications Creating a simple application for SIS18 (reading, displaying and monitoring of pressure values) Learning from CERN cryo group about applications realization 2 trainings from EN/ICE group for GSI and cosylab people Stand C.Betz CSCOIC "Industrial Controls" 4

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 5

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Vacuum Test Rig: Principles of electrical design Test Rig configuration Commissioning steps: Bake Out for a single channel based on UNICOS standard library Test rig devices and manual mode with simulation (standard library) Test rig devices and manual mode with test rig (standard library) Test rig manual/automatic mode with simulation (vacuum library) Test rig automatic mode with real vacuum system (vacuum library) Stand C.Betz CSCOIC "Industrial Controls" 6

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Vacuum Test Rig: What is needed from vacuum experts? Device specification for vacuum library Approval of the vacuum hardware devices (controller, pumps, gauges etc.) PCO definition UNICOS like functional system descriptions for all PCO, stepper etc. Design approaches of vacuum system panels Definition for mobile pumping station functionality Stand C.Betz CSCOIC "Industrial Controls" 7

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 8 TSP pumps

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 9 ISP pumps

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 10 HCXG

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 11 Bake Out Channel

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 12 Layout

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 13 GSI vacuum test rig

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 14 Cabinet and terminal boxes

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Stand C.Betz CSCOIC "Industrial Controls" 15 Bake Out terminal boxes

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Vacuum Cryring: Cryring vacuum system has to be prepared until end of the year Only manual mode for each bake out channel is needed Pressure measurement should be included All cabinets for PLC and vacuum controller should be prepared and installed UNICOS driven manual operation of pumps, valves etc. and automatic mode to be done next year Therefore needed: Approval for electrical engineering principles Electrical engineering with EPLAN specialists, regarded as development of principles and macros as guideline for FAIR Construction of cabinets and terminal boxes Mounting and installation of the complete vacuum system Stand C.Betz CSCOIC "Industrial Controls" 16

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) First approach to the workflow for FAIR vacuum CS design: Stand C.Betz CSCOIC "Industrial Controls" 17

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) First approach to the vacuum simulation system: Stand C.Betz CSCOIC "Industrial Controls" 18

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Foreseen modes of the vacuum simulation system: Manual input for all analog and digital feedback signals (first step) To be discussed: Venting Bake out Start pump down without leakage Start pump down with leakage Operation without leakage Operation with leakage Stand C.Betz CSCOIC "Industrial Controls" 19

(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Thank you for your attention ! Stand C.Betz CSCOIC "Industrial Controls" 20