Building Services Design Process

Slides:



Advertisements
Similar presentations
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Software Quality Assurance Plan
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Continuous Value Enhancement Process
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
SOFTWARE QUALITY ASSURANCE Maltepe University Faculty of Engineering SE 410.
INDUSTRIAL & SYSTEMS ENGINEERING
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Systems Engineering Management
Purpose of the Standards
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
Green School Design Gary A. Jerue ED 846 Spring 2010.
Design & Layout of Foodservice Facilities
Process Engineer’s Role in Project Management Dr Abdullah Malik.
ACT 96 - Indoor Environmental Quality In conjunction with the requirements directed under WI Statute and Administrative Code, school building officials.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Systems Analysis and Design: The Big Picture
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Bill Harrison New Jersey Chapter February 3, 2009.
From Research Prototype to Production
Copyright 2010, The World Bank Group. All Rights Reserved. Planning a Statistical Project Section A 1.
ISO OPERATIONAL CONTROL
Industrial Engineering Roles In Industry
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Project Life Cycle.
Bill Harrison Cleveland - Akron Chapters Joint Meeting March 16, 2009.
We Are Not Alone.... HVAC Contractor OwnerEngineer Commissioning Agent Plumbing Contractor Electrical Contractor ArchitectOccupant Operations and Maintenance.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Fundamentals of LEED v4 for
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
State of Georgia Release Management Training
Chapter 8 - Integrative Process
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Value 4 Golf is formed by a group of professionals who have been all their life linked to the world of golf, and actively participating.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
The Design Team Carl James.
Quality assurance in population and housing census SUDAN’s EXPERIANCE in QUALITY assurance of Censuses By salah El din. A . Magid OUR EXPERIANCE IN 5.
BIM EXECUTION PLANNING PROCESS
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
(Additional materials)
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BEEP Integrated Design Process for Energy Efficient Buildings
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
OHS Staff Introduction Training
BIM EXECUTION PLANNING PROCESS
LEED BD+C – Integrative Process
M&E SYSTEM.
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Controlling Project Cost and Schedule
FIVE PROJECT PHASES.
Presentation transcript:

Building Services Design Process Engineer Fahad Hasan Yousuf Hasan Associates Consulting Engineers

Building Services Europe – Building Services Middle East- MEP Services Asian Countries – M&E Services Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Branch of Engineering that combines all the building services in buildings Services Other than Architectural and Structural Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Engineer Building Services are what make a building come to life. A building must do what it is designed to do – not just provide shelter but also be an environment where people can live, work and achieve. Building Services Engineer is the one who makes that happen Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Building Services represent 30-50% of the construction costs in buildings 40-50% of the energy consumed are due to buildings 60-80% of the energy consumed in buildings are due to Building Services Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services - Background Building Services has a rich history ASHRE was formed in 1959 by the merger of American Society of Heating and A/C engineers founded in 1894 and American Society of Refrigerating Engineers founded in 1904. Building Services were formally recognized in 1976 with the formation of “Chartered Institution of Building Services (CIBS). The word “Engineers was added in 1985 to become the “Chartered Institution of Building Services Engineers (CIBSE). ASHRAE and CIBSE has contributed immensely towards the development. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Engineering ELECTRICAL SERVICES Lighting Electrical power distribution Telephone/communicatio n systems Fire detection, security & surveillance systems Lifts/escalators and transportation systems MECHANICAL SERVICES Air conditioning & ventilation systems Fire protection Water supply Sewer, waste water and storm water disposal Solid waste disposal Acoustics Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Engineering Energy supply – gas, electricity and power Natural and artificial lighting Escalators and lifts Heating and air conditioning Ventilation and refrigeration Water, drainage and plumbing Acoustics Fire detection and protection Security and alarm systems Telephone and IT networks Operation and maintenance Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Role of Building Services Engineer Four distinct areas associated with it Design Manufacture Installation Maintenance Knowledge of (the above + architecture) makes a complete Building Services Engineer Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Role of Building Services Engineer Building Design Team requires Initial inputs, user requirements Door and window design Site selection – noise levels etc. Location and orientation of the buildings Design of the envelope Planning of internal divisions Actual Designs to follow Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Developments Building Services Management Facilities Management Water management Lighting Design Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Management For What ?? Higher energy efficiency Maintain appropriate comfort levels Higher productivity Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Energy Efficiency DEPENDS ON Building envelope/fabric Building Services Management of building services (often neglected) Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Facilities Management DEFINITION (of European Committee for Standardization and ratified by British Standards) Facilities Management is the integration of processes within an organization to maintain and develop the agreed services which support and improve the effectiveness of its primary activities Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Facilities Management Areas covered Property Strategy – Quality Policy, Maintenance Policy, Purchasing Policy, etc. Space Management Communication and Infrastructure including building fabric Building Maintenance Administration and Contract Management – including catering, cleaning, mail room, health and safety Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Facilities Management PROFESSIONAL INSTITUTIONS The Chartered Institution of Building Services Engineers, UK (CIBSE) – Facilities Management Group British Institute of Facility Management (BIFM) CIBSE and BIFM have joined forces, through signing a MOU, in December 2004 to develop and promote excellence in facilities management practices. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Institution promoting building services Internationally CIBSE ASHRAE Locally Pakistan Engineering Council Institution of Engineers Pakistan ASHRAE Pakistan Chapter Pakistan HVACR Society Pakistan Green Building Council Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Sustainability Sustainable development is one that meets the needs of the present without compromising the ability of future generations to meet their own needs. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Design of building services proceeds through the following phases. The process is subject to economic and time constraints, to availability of or preferences for certain equipment and to modifications in design criteria as the project progresses Concept Stage Schematic Design Preliminary Design Construction Phase Acceptance of or commission Phase Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Concept Stage The functional use of the building, owner and occupant requirements, architectural concepts and budget limitations are typically determined during this phase. These requirements should be documented in a statement of design intent for the building systems, which is refined and updated as the design progresses. If cold-air distribution is to be considered for the project, it is best to advance the option at this point, so the entire design can be developed to best realize its benefits. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process For example, the reduced space required for ductwork may allow revisions to the structural design and substantial cost savings. Reduced duct space may also be a solution for architectural design concepts such as vaulted ceilings. Similarly, if underfloor air distribution is to be considered, this is the time to evaluate that option, because it affects building height and services design. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process The concept phase begins when the owner identifies the need for the project and the program is developed. The two end products of the program phase for the services engineer A detailed design intent statement describing the selected systems A commissioning or implementation plan outlining the process by which the system will be designed, installed and commissioned Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process The design team performs a feasibility study to evaluate system options and establish a budget. At the conclusion of the concept phase, the owner selects the desired systems, and the design team produces the design intent statement. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process The Owners program includes information to develop the following design criteria: Building area, height and number of stories Geographic site location Building construction materials, area and type of glazing and insulation levels Conceptual architectural drawings Functions of each area in the building Occupancy and operating schedules Environmental requirements, such as temperature and humidity set points Process loads, temperature and flow requirements Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Power requirements of the project Life safety analysis which determines the type of fire fighting system Water requirements of the project Possibilities for future growth or expansion Acoustic requirements Applicable codes and standards Space available for equipment Reliability requirements Budgets for capital costs and operating costs Sustainability requirements Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Schematic Design In this phase, the designer selects and compares appropriate systems to meet the building’s functional needs and develops recommendations for the owner. This phase typically involves evaluation of the benefits and trade offs of different design approaches. Annual energy consumption, demand and costs, as well as system installed costs, are estimated. The level of analysis may range from simple rule of thumb estimates to hour by hour simulations with detailed cost comparisons Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Preliminary During this phase, building services engineer coordinates the MEP systems with architectural and structural systems to resolve potential conflicts. Building lighting calculations are refined Building power calculations are refined, detail load schedules are prepared HVAC calculations are refined Equipment sizes and capacities are selected, System layouts are developed Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Final Design and Preparation of Construction Documents In this stage, the preliminary layouts and equipment selections are fully developed and the final drawings and specifications are completed. Some projects involve preparing alternative designs, with bids for all options. In such cases, the primary option generally receives the most effort during the design Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Construction Phase The design engineer’s responsibilities during this phase typically include reviewing shop drawings, observing construction, and conducting or witnessing system performance tests. Contractors may require guidance to ensure that they follow the project specifications rather than their standard methods Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Acceptance or Commissioning Phase The term “commissioning” is often used to refer to the start up and functional performance testing of MEP systems. Experience has shown that a comprehensive commissioning procedure is essential to the success of a project Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process 5 steps for successful completion of complex building project Whether it’s a new hospital, renovation of an existing laboratory, or expansion of a manufacturing facility, complex building systems in complex building types are designed to perform at high levels. However, if not commissioned properly, the high-performing facility you thought was being built could be severely underperforming. In fact, a recent study by Lawrence Berkeley National Laboratory shows that in the U.S. alone, nearly $10 billion is wasted through energy inefficiencies, such as air duct leakages, unbalanced airflow, valve leakages, improper controls setup and so on. How can you save money and ensure that your complex building is commissioned properly? For starters, there are five simple steps. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process 1. Start early Begin the commissioning process during the pre- design or design stages. Just because the bulk of the commissioning effort takes place after construction completion does not mean that you should wait until then to begin commissioning. The process should start as early as possible and be a collaborative effort among all key stakeholders in the building’s success: owner, architects, engineers, construction manager, subcontractors, building management, and maintenance personnel. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process 2. Make a clear plan Create a commissioning plan that defines the roles and expectations of each stakeholder throughout the commissioning process. Most subcontractors do not understand what is expected of them during commissioning, drastically slowing the process. Preparing a commissioning plan as early as possible is key to maintaining the speed necessary to complete the project on time with no loss of quality. The plan provides direction during the commissioning process, particularly with regard to issues and details not fully developed during design, such as scheduling, participating parties, lines of reporting and approvals, coordination and so on. In conjunction, a commissioning matrix can be developed that lists all of the commissioning tasks, who is responsible for their completion, and the timing of those steps, providing a visual document to guide the process. The tasks identified in the matrix include procedures for review and acceptance; requirements for documentation, development and approval of commissioning plans; schedules; and inspection and testing. By taking these steps, the subcontractors’ responsibilities are clarified, making commissioning a much smoother process. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process 3. Put it into the schedule Commissioning activities should be built right into the master construction schedule. By incorporating the various commissioning tasks as line items in the master schedule, they are more likely to be completed in the proper sequence for a successful result. Adding commissioning to the master schedule also reinforces each stakeholder’s responsibilities over time, and reemphasizes the collaborative nature of the process by putting commissioning front and center for everyone to see. . Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process 4. Document the process Documenting each commissioning act—creating a log of performance standards, inspections, testing, and if necessary, corrective actions, for systems and equipment—verifies that all relevant design and construction work meets the objectives established during the pre-design and/or design stages. Detailed binders housing these commissioning logs, known as “turnover packages,” can then be created and maintained to serve as a historical record of the commissioning process for the facility’s systems. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process 5. Train the operators To ensure consistent building performance on an ongoing basis, it is essential to train the facility staff and management team regarding the correct operating procedures for all systems installed. This effort can include one- on-one training from the equipment manufacturer/vendor and/or the controls contractor, as well as producing manual and video support programs. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process Summing it up Although not a comprehensive list, these five steps are the cornerstone of a good commissioning process. This effort helps assure owners that: The project will be successfully completed within schedule parameters. The facility is fully functional at first occupancy. The building optimizes energy efficiency to reduce operational costs. Facility managers and maintenance personnel are fully trained and engaged, creating a better chance that ongoing maintenance is managed, reducing system down time, expenses and so on. A safer, more comfortable environment is created for workers and guests. There will be less miscommunication throughout the construction process. There will be fewer change orders. Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com

Building Services Design Process thank you Q/A Engr. Fahad Hasan, Y.H.Associates, fahad@yhassociates.com