© TransCare In cooperation with our Partner and TAACS Operational Readiness – Start-Up Support Airports & Airlines Integrated Operational Readiness IOR.

Slides:



Advertisements
Similar presentations
ISPM 6: Guidelines for Surveillance
Advertisements

© TransCare In cooperation with our partner and Airport monitor Rate yourself against Benchmarking your peers.
Airside Capacity Enhancement
Critical Infrastructure Protection and Continuity of Operations A Look at Asset Protection in the Airport Environment May 1, 2013.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Contractor Safety Management
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Project Cost Management Estimation Budget Cost Control
Computers: Tools for an Information Age
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
AMR Proprietary and Confidential FAA Compliance Training.
Unit 3: Command & Control IC/IMT Interface
Part II Project Planning © 2012 John Wiley & Sons Inc.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Winter Operations GENEVA CASE AIRPORT OPERATIONS IN EXTREME WEATHER CONDITIONS (winter )
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
SAMPLE IMPLEMENTATION PLAN OF A POVERTY ASSESSMENT TOOL To Report to the Management of Microfinance Association of Patharland (MAP), Patharland This proposal.
Systems Analysis and Design: The Big Picture
S/W Project Management
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
Miami International Airport’s Integrated Airport Management System
Information ITIL Technology Infrastructure Library ITIL.
1 PLANNING A description of what we want to accomplish in the future and agreement on the means for achieving it. Planning is an effort to arrange for.
1 1 The improvement of HR management by using Lean UNECE, Budapest, September 6th 2012 Jan Byfuglien & Anne S. Trolie Statistics Norway. Division for human.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
Airport Security and Operations Management Post 9/11.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
SacProNet An Overview of Project Management Techniques.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Start Presentation. A Boeing Company The role of Simulation in installation of Explosive Detection Systems Auckland June 03 Helping our customers increase.
Systems Analysis and Design
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
ENCHASE “ENHANCING ALBANIAN SYSTEM OF QUALITY ASSURANCE IN HIGHER EDUCATION: APPLICATION OF THE PROCESS AND OUTCOME BASED METHODOLOGY ”
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
INNOVATION PODIUM. 12: :00 NEXT SESSION BAG FACTORY UNCOVERED BEUMER GROUP MIDDLE EAST Dirk Fransen, Director of BEUMER Innovation and Automation.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
South African Football World Cup 2010
IMS Implementation Project
Economic issues Formulation of Business cases H. Sudarshan
ISO/IEC
Systems Analysis and Design in a Changing World, 4th Edition
Software and Systems Integration
Software Planning Guidelines
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Quality Management Systems – Requirements
Part II Project Planning © 2012 John Wiley & Sons Inc.
CLINICAL INFORMATION SYSTEM
Safety Risk Management (SRM) Process Overview
How to conduct Effective Stage-1 Audit
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

© TransCare In cooperation with our Partner and TAACS Operational Readiness – Start-Up Support Airports & Airlines Integrated Operational Readiness IOR &Integrated Operational Readiness IOR & Integrated Operational Optimization - IOOIntegrated Operational Optimization - IOO Integrated Airport Management

© TransCare Page 2 In cooperation with our Partner and TAACS IOR & IOO for Airports IOR and IOO: tool for large scale International Airports to guarantee success. The Integrated Airport Functions approach ensures:

© TransCare Page 3 In cooperation with our Partner and TAACS IOR & IOO for Airports That operational functions and interfaces are integrated and optimized. Results from past projects: timely inauguration, efficient operation from day one, higher quality and service level standard, higher user acceptance, higher ROI after start of operation and after optimization process.

© TransCare Page 4 In cooperation with our Partner and TAACS IOR & IOO for Airports Time versus quality and budget limitations Operational Issues versus manufacturing constraints and system implementation Be prepared…..

© TransCare Page 5 In cooperation with our Partner and TAACS Developer‘s & Operators‘ Conflicting Objectives Efficient Operations & Efficient Resource Allocation Attract Clients & Customers Return on Investment High Quality Standards Operator‘s ObjectivesOperator‘s Tasks Maintain Budget Minimum Quality & Time Schedule Design & Build to Specifications Avoid Changes / Variations Developer‘s Objectives Developer‘s Tasks = = = = IOR & IOO for Airports

© TransCare Page 6 In cooperation with our Partner and TAACS IOR & IOO for Airports Target: Pragmatic, structured and transparent integration of all activities until Start of operation or optimized current Airport OPS is accomplished. Prerequisite: Overview on all Airport components and functions, planning, design, schedules, costs, outsourcing concept, interfaces and operational concept. Steps: assessment, evaluation, interface clarification, integration of entities, function implementation, fine tuning of functions, trial operation, start of operation / operate enhanced operation

© TransCare Page 7 In cooperation with our Partner and TAACS IOR & IOO for Airports Partners for Integration: Airside & ATC Operations Security TSA Investors Relations CIQ Facility / System - development Landside Access Concessionaires Airlines / Handlers Airport Operator

© TransCare Page 8 In cooperation with our Partner and TAACS IOR & IOO for Airports IOR Exec. IOR Coord. AIRPORT ACCESS PAX / CREW HANDLING BAGGAGE HANDLING AIRCRAFT HANDLING Trial Operations Relocation (IOR) Post-Opening / Operation Support Implementation Methodology of IOR / IOO Organization IOR & IOO Implementation  Airport Authority  Airline & Handlers  Government Authorities  Concessio- naires  Security & Safety  O&M Systems INTERFACE Client & Third parties

© TransCare Page 9 In cooperation with our Partner and TAACS IOR & IOO for Airports Operations Support & Optimization H S I F = Facilities Interaction Systems HR T Ops. Commissioning / Trial OperationCommercial ConceptsProcess Management Planning Concepts Master planning, Functional Planning Human Resources Development Relocation Operations Concepts Operational Development Phases Transfer/ Trials Finance $

© TransCare Page 10 In cooperation with our Partner and TAACS IOR & IOO for Airports Samples of neglected work packages: » Implementation of new procedures, online access, the 5 W’s not implemented & trained » Operational suitable signage » Changes in space requirements » Security concept / adaptation of flows » Training concept and required time & systems for training » IT & Baggage integration testing prior Trial operations » Late integration of Airline, Handler, third parties and Gov. Bodies » Lack integration of operational activities in Facility and System time schedule » Baggage transport procedures,

© TransCare Page 11 In cooperation with our Partner and TAACS IOR & IOO for Airports Samples of neglected work packages II : Incheon Intern. Airport, S.-Korea: Task: Development of Interaction, Human Resources & optimization of Functions in relation to Facilities and Systems for Airport opening and future operation. F acilities and S ystems being developed I nteraction, H uman Resources, T rials to be developed and integrated Total Functions - SHIFT of IIAC to be completed for Start of Operation

© TransCare Page 12 In cooperation with our Partner and TAACS IOR & IOO for Airports Optimization Principles Reduce Costs Manage Quality Improved Performance ! Co-ordinate Activities Reduce Interfaces Increase Flexibility Process 1 Process 2 Process 4 Qualify Human Resources Implement New Systems Process 3

© TransCare Page 13 In cooperation with our Partner and TAACS IOR & IOO for Airports IOR and IOO Tools and Methods: Proven tools utilized in IOR Programs to enhance operational Value Development of IOR / IOO Manual Standard Functional Catalogue (StFC) Specific Functional Catalogue (SFC) Functional Integration Plan (FIP) Individual Time Schedules (ITS) Operational Readiness Progress Measurement (ORPM) Outstanding Issues List (OIL) Reporting operational shortcomings as monitored during Trials Analysis tool for functional performance of Trials Risk Management Analysis Database

© TransCare Page 14 In cooperation with our Partner and TAACS IOR & IOO for Airports IOR and IOO Components: Further methods used to implement and integrate the Project: Structured Interviews with all concerned parties Implementation of OREX Organisation Communication structure Interface Meetings resulting from OIL List Issues Site Visits, Progress Measurement Development & alignment of Trial Scenarios Execution of Trial Scenarios Contingency Flow Charts (trial / procedure related) Facilities / Systems Matrix Training / Procedure concept and implementation Relocation concept and execution

© TransCare Page 15 In cooperation with our Partner and TAACS IOR / IOO for Airports Operational Organization Functional Performance Report of Trials Trial Results Risk Management Influence on Airport Opening Date (AOD) Foreseeable Inconveniences Contingency Plans Ongoing Rectifications Transparent Reporting Execution of Trial Scenarios Operational Shortcomings Development of Trial Scenarios Standard Functional Catalogue Questionnaire Functional Integration Plan (FIP) Specific Functional Catalogue Individual Time Schedules (ITS) Operational Readiness Progress Measurement (ORPM) IOR Organization Outstanding Issues List (OIL) Database Questionnaire Operational Concept Data Concept: Functional Performance Report of Trials

© TransCare Page 16 In cooperation with our Partner and TAACS IOR & IOO for Airports Core Processes 1.Airport Access 2. Pax&Crew Handling 3. Baggage Handling 4. Cargo & Mail Handling 5. Aircraft Handling 6. Aircraft Control 7. Administration & Management 8. Facilities & System Management 9. Airport Security 10. Commercial Optimization & Customer Services 11. Environmental Integration Core Processes 1.Airport Access 2. Pax&Crew Handling 3. Baggage Handling 4. Cargo & Mail Handling 5. Aircraft Handling 6. Aircraft Control 7. Administration & Management 8. Facilities & System Management 9. Airport Security 10. Commercial Optimization & Customer Services 11. Environmental Integration Components F Facilities I Interaction S Systems H Human Resources Components F Facilities I Interaction S Systems H Human Resources Main Functions For example: 1.Road/Rail Access 2. Pax Control, Information, Pax Services etc. 3. Departure/Arrival/ Transfer Bags 4. Export/Import Services, Quarantine etc. 5. Ground Handling, 6. NavAids, Visual Aids, Airspace Movement and so on……... Main Functions For example: 1.Road/Rail Access 2. Pax Control, Information, Pax Services etc. 3. Departure/Arrival/ Transfer Bags 4. Export/Import Services, Quarantine etc. 5. Ground Handling, 6. NavAids, Visual Aids, Airspace Movement and so on……... Sub Functions In excess of 600 Sub-Functions to be addressed to implement Sub Functions In excess of 600 Sub-Functions to be addressed to implement Core Processes - Breakdown

© TransCare Page 17 In cooperation with our Partner and TAACS IOR & IOO for Airports Samples of Tools and Methods: » Outstanding Issue List (PM Method)PM Method » Check list / Questionaire for Functions,Functions » Functions catalog Functions catalog » Functional Integration Plan (FIP) Functional Integration Plan FIP » Job description for OREXOREX » Operational Time Schedule – Terminal Airside SecurityTerminalAirsideSecurity » Trial Scenario / Trial Check List Trial ScenarioTrial Check List » Operational Readiness Progress Measurement (ORPM) Operational Readiness Progress Measurement » Training Matrix Training Matrix

© TransCare Page 18 In cooperation with our Partner and TAACS IOR & IOO for Airports Processes at Airports F acilities I nteraction S ystems H uman Resources Terminal Visitors Pax Baggage Cargo Land Transport Pax Baggage Cargo Air Transport  Organization  Administration & Management  Commercial Optimization  Customer Services  Safety & Security  Facilities & Systems Operations & Maintenance  Environmental Integration  Organization  Administration & Management  Commercial Optimization  Customer Services  Safety & Security  Facilities & Systems Operations & Maintenance  Environmental Integration Samples of overlapping Functions Landside Airside

© TransCare Page 19 In cooperation with our Partner and TAACS PM IOR PM IOO IOR & IOO for Airports Phases of Implementation Assess Invest Part > 60% = 50% < 20% Operation Part = 50%> 80%< 40% Introduce Proceeding Introduce Proceeding Organize Project Set-up Execute “Shift” - Programme Integrate Trials / Operation Project Content

© TransCare Page 20 In cooperation with our Partner and TAACS IOR & IOO for Airports Development of complete trial operations out of the operational procedures and their components Components: Duration of Trial Ops until Inauguration of Airport Trial operation of all components and necessary operational systems for the single operational procedure -Check in- Trial operation of all components and necessary operational systems for the single operational procedure -Gate Closure System- Duration of Functional Planning Applied to approx. 600 Operational Procedures Deadline for Functional Readiness of all Components I I S S H H Complete Trial operations of operational procedures and operational systems Trial operation of all components and necessary operational systems for the single operational procedure from Check-in to -Gate Closure System- Interaction Operations Systems Personnel Rooms / Finish Rooms / Finish Operative Systems Operative Systems Equipment Personnel Operative Procedure - Check in - Operative Procedure - Check in - F F I I S S H H Operative Procedure -Gate closure -system - Operative Procedure -Gate closure -system - F F Buildings / Equipment Buildings / Equipment Provision (free of dust) Provision Function of all O.S. Fall Back Plan Equipment Furnishings Training Instructions Topography Provision (free of dust) Provision Function of all O.S. Fall Back Plan Equipment Furnishings Training Instructions Topography BasicAdvancedIntegrated

© TransCare Page 21 In cooperation with our Partner and TAACS Trial Operation Methodology Development of Trial Scenarios Identification of Operational Shortfalls Execution of Trial Scenarios Trial Results Functional Performance Report of Trials Outstanding Issues List (OIL)  Influence on Airport Opening Date (AOD)  Expected Inconveniences  Contingency Plans  Ongoing Rectifications  Management Reporting Critical Management Decisions IOR & IOO for Airports

© TransCare Page 22 In cooperation with our Partner and TAACS IOR & IOO for Airports IOR & IOO Our Objective Smooth Airport Operations from day one onwards Main Carrier Other Airlines Concession Legisl. Govt. Bodies Deve-lopment Reali- zation Executive Govt. Bodies Airport Shareholders Airport Operator

© TransCare Page 23 In cooperation with our Partner and TAACS Project management for Airports & other Projects “Hardware““Software“ Facilities / Equipment Operations- System Organization Human Resources Implementation Conception Risk Assessment Feasibility Study Master-/ Biz- Planning Start - up Commissioning Relocation * “Environment“ Integration Project Development Development Phases Step 1

© TransCare Page 24 In cooperation with our Partner and TAACS Project management for Airports & other Projects “Hardware““Software“ Facilities / Equipment Operations- System Organization Human Resources Security Access Operations Administration Safety Production-Support Publicity Facility Management “Environment“ Integration Start up Project Start – up Processes Step 2

© TransCare Page 25 In cooperation with our Partner and TAACS Project management for Airports & other Projects “Hardware““Software“ Facilities / Equipment Operations- System Organization Human Resources Security Access Operations Administration Safety Support Publicity Facility Management “Environment“ Integration Operations Operations- Processes Step 3

© TransCare Page 26 In cooperation with our Partner and TAACS TransCare’s & Cooperation Partner Locations ISO 9001:2000 Atlanta London Geneva Dubai Johannesburg Singapore Tokyo New Delhi Sydney Voorschoten Wiesbaden Los Angeles Mexico City Moscow Nairobi Beijing In Cooperation with our Partner Frankfurt Airport Cargo City South/Bldg. 664c Frankfurt fon: fax: TransCare Western Europe TransCare India TransCare South America Sao Paulo TransCare Russia/CIS Frankfurt