Usage Guidelines Throughout this template you will find tip-boxes to the left of the slides. To remove this box from the final presentation, simply click.

Slides:



Advertisements
Similar presentations
Data Projector Setting Up/Connecting Laptop & Data Projector.
Advertisements

Zebra® 105SL™ * Removing and Installing Printhead
The following demo demonstrates features and benefits of the Fasfold CNC controller when retrofitted to a new or used Pressbrake. It can be retrofitted.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
inFire HTC speed Furnace Webinar
Components: Sansa Clip Mp3, earbuds, USB cable, Quick Start Guide.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
DEVELOPING ICT SKILLS PART -TWO
LogTag Training January 2015
Optical Manufacturing Solutions 1 Probe Assembly.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
1 Check all equipment is included before returning. If you have an accident or the equipment is damaged or you need support please contact Blaize
Unit Test Calibration Training
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
DR-2000 Customer Benefits Security; Tamper resistant programming protects your customer and you! Low maintenance, long battery life & long squeeze tube.
1 Zebra 170 XiIII Plus Removing and Installing Printhead Calibrating Head Resistance Print Quality Adjustments.
*** CONFIDENTIAL *** © Toshiba Corporation 2008 Confidential Wallboards.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
Using the Unity 98 Cordless Response System Directions : Courtesy of IHC public relations.
AccuMax Multi-Point Injection Mechanics
Overview Test Interface (TIU PCB‘s) are extremely expensive.
$100 $400 $300 $200 $400 $200 $100$100 $400 $200$200 $500$500 $300 $200 $500 $100 $300 $100 $300 $500 $300 $400$400 $500.
Microsoft Visual Basic 2012 CHAPTER TWO Program and Graphical User Interface Design.
A lesson approach © 2011 The McGraw-Hill Companies, Inc. All rights reserved. a lesson approach Microsoft® PowerPoint 2010 © 2011 The McGraw-Hill Companies,
Cypress-Fairbanks I.S.D. 04/04/05 PC6 Word Processor Training Assistive Technology
Working with Numbers in Alice - Converting to integers and to strings - Rounding numbers. - Truncating Numbers Samantha Huerta under the direction of Professor.
Installation. Indoor Unit Installation Typical Installation.
Working with iMovie: The Basics Created by MJ. Importing Video Footage attach your camera to your computer and set to VTR mode move the camera button.
Associate ® Typist – Transcription Module Starting Associate Transcription: To start Associate typist module, double click the Associate dictation icon.
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. WORD 2007 M I C R O S O F T ® THE PROFESSIONAL APPROACH S E R I E S Lesson 21 Fields and Forms.
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Access Project 5 Enhancing Forms with OLE Fields, Hyperlinks, and Subforms.
Introducing the UHC-HD for McDonald’s
GCS 300 System Operation Application – Level 1.
Analog Discovery Arbitrary Function Generator for Windows 7 by Mr
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Access Project 5 Enhancing Forms with OLE Fields, Hyperlinks, and Subforms.
Set Up for Live Streaming Video This presentation will walk you through the set up and delivery for streaming video of a live event over the internet.
Using E-Class Searching for position descriptions belonging to a particular ministry.
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Access Project 7 Advanced Report and Form Techniques.
IT Services Getting Started on your iPad Created by Michael Mackenzie.
Processing Lab 2 – Geometry Bryce Hutchinson Objectives: Add a dictionary Gain a better understanding of header issues Display geometry correctly Visualize.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
AAP with PCOM Scripts Graham Woof – 7/23/2012.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
PowerPoint Basics Tutorial 2: A Slide Show In this tutorial you’re going to create a presentation from scratch. You will have to keep this presentation.
Part 1 Working with Devices in the CQ Lab. Agenda 2 How to select a device and reserve it. Basic device operations inside the Lab Other features to get.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Document that explains the chosen concept to the animator 1.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Hardware Configuration Guide Configuring Dongles and Creating Barcodes for Devices Used with VSC.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
USER GUIDE TEMPERATURE CONTROLLER TR-2006 Hot runner temperature controller ShenZhen TanRex Electronic Co.ltd.
© English Language Testing Ltd Taking the Password Skills Test.
An Introduction to Programming with C++1 An Introduction to Control Structures Tutorial 1.
PostBase Automatic Feeder Component Removal Service Training
SPen & Camera Kit Experience App
Gayle K. Martin November 14, 2016
Tool removed during cycle Fault #2
Global Standard Video Conference System User Guide.
ReadySet Achieve Maximize Training Agenda
Laser 3000™ Operating Instructions
Millennium touch screen Operated Profiler Series Roaster control
Category 1 Category 2 Category 3 Category 4 Category
Presentation transcript:

Usage Guidelines Throughout this template you will find tip-boxes to the left of the slides. To remove this box from the final presentation, simply click on the edge of the box (so that you select the whole box, not the text inside) and then press the delete key. Slide Description: Title Slide Usage: When creating a title slide, be sure to keep the title as short and descriptive as possible. The subtitle should be one sentence long. MRS-1000A Setup and operation

Confidential and Proprietary to OK International. © OK International All rights reserved. Summary  The MRS-1000A and B are supplied with 4 main components PCT-1000 HCT-1000 ATH-1000A LM-1000 Plus the nozzle carrier.  There is a small amount of assembly required to connect all parts which will be explained in the following slides. 1

Confidential and Proprietary to OK International. © OK International All rights reserved. Initial assembly - PCT-1000 to ATH-1000*  A support bracket is required to be mounted to the ATH-1000* to the PCT Remove the top plate of the PCT by unscrewing 4 x M3 screws. 2.Fix the bracket to this plate and the additional plate using 3 x M4 screws supplied. (The smaller mounting plate extends slightly from the main PCT plate) 3.Re attach the main plate to the PCT using 4 x M3 screws 4.Secure the back of the bracket to the PCT housing using 2 x M3 screws provided. 2

Confidential and Proprietary to OK International. © OK International All rights reserved. Initial assembly  Connector cable is provided with the HCT  LM-1000 must be secured to the ATH-1000 using screws provided 3

Confidential and Proprietary to OK International. © OK International All rights reserved. ATH-1000 and ATH-BH The co-planarity of the rails to the PCT can be adjusted using the adjustment screw located on the ATH-1000 After securing the ATH-BH to the ATH-1000*, lock the support rails using the grub screw supplied. Both screws can be adjusted using the driver supplied. 4

Confidential and Proprietary to OK International. © OK International All rights reserved. Board rail levelling 5

Confidential and Proprietary to OK International. © OK International All rights reserved. MRS – System set up 6 There are 4 available modes within the PCT and HCT units. Setup Manual Run Active setup (Programming of the HCT is entered exactly the same as with the PCT-1000.) When the HCT-1000 and PCT-1000 are connected together, the HCT serves as the main controller. When this happens the time displays on the PCT are no longer shown.

Confidential and Proprietary to OK International. © OK International All rights reserved. Set up mode 7  Press the P once to change the program number, scroll to the correct number using + or - and re-press P  To enter set up mode, press and hold the “P” button for 2 seconds on the selected program.  In setup mode, the parameter which is being adjusted will flash repeatedly.  Using the + and – buttons adjust each parameter, then scroll to the next parameter using the P button.  When complete, hold the P to return to run mode.

Confidential and Proprietary to OK International. © OK International All rights reserved. Set up continued  Temperature settings on the HCT-1000 can be programmed from 25 to 450 degrees in 4 zones.  Zones 1 to 4 can be programmed from 1 second to 300 seconds.  TC: Can be selected to internal or external. Note: If external is set, the Thermocouple must be placed in the heat area. Failure to do this may result in damage to the heaters. TC1 is the master input for external monitoring. With the TC set to INT, the TC1 and TC2 can be used for reference.  Airflow levels can be adjusted in setup mode.  TM (Turbo mode) has been included for the Japanese market and should not be used in areas using 110v or 240v supplies. 8

Confidential and Proprietary to OK International. © OK International All rights reserved. Manual mode  In set up mode, each zone can be programmed to a maximum of 300 seconds.  When zone 1 is extended beyond this time, Manual mode is entered and all other zones are removed from the display.  Start and stop are triggered by the red button on the hand piece or red pedal on the dual foot switch. 9

Confidential and Proprietary to OK International. © OK International All rights reserved. Run mode 10 To start a profile, the red button on the hand-piece or the HCT dual foot pedal should be activated. During the profile, the blue button can be pressed to toggle the function between remove and place. When the program is set to remove, the vacuum will activate and retract into the nozzle at the end of profile 4. The vacuum will continue for the duration of the Cooling zone. The profile can be aborted at any time during the cycle by pressing the red buttons. This will advance the profile to the Cooling zone.

Confidential and Proprietary to OK International. © OK International All rights reserved. Active set up  Within the active set up mode, it is possible to increase or decrease the temperature and time settings for each zone in real time.  To start the active setup. Press and hold the P until the first parameter flashes and begin the profile using the red button/footswitch.  Within each profile the + / - will adjust the temperature accordingly.  To shorten a zone and advance to the next profile, press the red button at the desired time.  To extend a zone length, Press and hold the P button within the last 5 seconds of its time and hold until the required time has been achieved.  The zone will advance to the next as you release the button and the new time will be stored into the program. 11

Confidential and Proprietary to OK International. © OK International All rights reserved. Temperature profiles 12

Confidential and Proprietary to OK International. © OK International All rights reserved. APR-MRS Demo KIT 13 A new demo board has been released for the APR and MRS. The new board has been designed with a number of PBGA, CSP, micro SMD, PLCC, QFP, LGA, POP and discretes. The PCB includes component location lines to assist in demonstrating placement of BGA’s during Demo. Test points have also been included with pre-drilled holes so the board can be set up as a “gold” board for pairing of systems.

Confidential and Proprietary to OK International. © OK International All rights reserved. Calibration mode  Both the HCT-1000 and PCT-1000 have a revision of 1.5 which allows the TC inputs to be calibrated.  PLEASE NOTE! Calibration should only be performed AFTER the system has been run for at least to profiles. Calibrating the TC inputs when cold will offset the readings incorrectly.  To enter calibration mode, Press and hold the P then the on/off for 5 seconds and a calibration screen will appear.  Using a calibrated TC device as shown, use the +/- buttons to adjust the readings accordingly.  To return to normal settings, press P.  Details of this have not been included in the user manual so a separate document can be issued when requested. 14