CONSTRUCTING A FIVE CABIN LATRINE

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Interior Wall and Ceiling Finish
CASTING A CONCRETE WALL
SHOTCRETING K.V.SUBBA RAO.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
By Dr. Julia Arnold
Split Sole 45 Degree Raker
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Concrete
Planning, Laying Out, and Tooling Concrete Block
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Foundation Systems.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Introduction: Standard Test Method for Density (unit weight), Yield, and Air Content (Gravimetric) of Concrete –Apparatus –Sample –Procedure ACI Certification.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
New Mexico FFA Agricultural Mechanics Career Development Event Concrete and Masonry.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Installation Presentation
Constructing Homes and Other Buildings
LINEAR MEASUREMENT.
Calculations On completion of this unit the Learner should be able to demonstrate an understanding of: The formula used to calculate: Areas Volumes Ratios.
Intro to Concrete 18.0 & 19.0 Class notes.
Plain & Reinforced Concrete-1 CE-313
Preparing Foundations for Cylinders & ASME Tanks
UNIT: CONCRETE/MASONARY
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
One Point Perspective Design and Technology. One Point Perspective Task 3 Here are some high quality examples of what we are aiming to produce by the.
Objective Distinguish between site preparation, placing, finishing, and curing.
Definitions of terms associated with concrete masonry units A.Masonry Units: Blocks made from concrete, cinders, or other aggregates. B.Laying Block:
Making a Excalibur letter opener Prepared for Ken Jeberg By Ken Jeberg Trades Technology Teacher Education.
How to Build a Divider Wall By Charysse Roberson.
Agricultural Mechanics Career Development Event Concrete and Masonry
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
TAKE NOTE ON THE ORDER OF PROCEDURE FOR CONSTRUCTION OF THE LAMINATE COUNTERTOP. Countertop Procedures.
Copyright © Ed2Net Learning, Inc.1 Three-Dimensional Figures Grade 5.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 40 Concrete and Masonry.
Chapter 10 Geometry © 2010 Pearson Education, Inc. All rights reserved.
Jewelry 1 Project # 3. Soldering Cutting Filing Sawing Burnishing Pushing Sanding.
BUILDING CONSTRUCTION
Chapter 10 Geometry Part 1. 1.Polygons on a Coordinate Grid 2.Nets of Polyhedrons 3.Surface Area of Polyhedrons 4.Surface Area Continued 5.Spring Break.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
Preparation of Plant tissues for histological study.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Making Made from Scratch Concrete Stepping Stones Created by: Joan Jackson, Tiffany Prather and Dr. Frank Flanders Agriculture Education Curriculum Office.
5. FERROCEMENT.
Demonstrate Concrete Skills Form A wood or metal structure that confines concrete to the desired shape until it hardens.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
UNIT: CONCRETE/MASONARY Concrete Proportions Modified by Georgia Agricultural Education Curriculum Office July, 2002.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Leads Institute of Technology & Engineering
Concrete Lesson 2: Site Preparation
Foundation – jay Desai.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
BUILDING CONSTRUCTION
Building Planning and Drawing
Planning and Placing Concrete
Flood: Build a Stronger Plinth
Building Construction I Sofia Sebastian 1
Step-by-step assembly instructions
Student: xxxxxxxxx AEC 204 Lab December 5, 2006
How to install pavers..
FBE05 – Mathematics and Statistics
Make a Two Note Wooden Whistle 1: Cut a piece of wood 20mm thick x 30mm wide to a length of 100mm. Use a back saw and a miter box to make the cut. 2: Use.
Rocket Stability Building a Test Rocket LabRat Scientific © 2018.
Presentation transcript:

CONSTRUCTING A FIVE CABIN LATRINE Agua Para La Salud, Guatemala

Be Advised The following power point presentation assumes the user is familiar with plumbing, concrete and masonry construction techniques and has a basic knowledge of geometry so as to select the proper dimensions of the latrine given site specific criteria.

Site Preparation and Calculations An area of land 3m by 7m must be cleared and made level. Any large protruding stones should be removed from the soil, and a 1m level should be used to check for a plane surface.

Site Plan Latrine Foundation 10 cm depth 260 cm 690cm NOTE: A CIRCULAR AREA, 2m IN DIAMETER SHOULD BE KEPT CLEAR FOR MIXING OF CONCRETE

Materials (5) Steel Doors 180cm X 60cm (1) lbs 2-1/2in Nails (2) lbs Nails para lamina (10) Lamina de 8in Wood for formwork (2) lengths 12ft X 2in X 4in (2) lengths 8ft X 3in X 4in (2) lengths 8ft X 3/4in X 2.5in (4) cubic meters Large Stone (15cm to 30cm dia.) (200) kg 3/8in reinforcing steel bars (15) rods 1/4in reinforcing steel bars (6) lbs Tie Wire (30) 50kg bags of Cement (3) Cubic meter Sand (2) cubic meter Gravel (425) Blocks 20*15*40 Water

Site Preparation Cut enough room for the entire latrine station to sit on solid, flat ground. A flat area nearby will be needed to mix concrete. Make sure the area is properly compacted and free of debris. Construct a wooden mold for the latrine foundation.

Latrine Foundation Use a level to ensure that the form is level, so once the cement is poured, the base is level Ensure forms are held firmly in place Concrete will not be poured in these areas. 5cm diameter stone is placed to cover the ground Leave a minimum gap of 5 cm between rebar and form to allow concrete to fill this area. Do not place stone between rebar and form.

Latrine Foundation Section View Wood Form 5 cm Concrete 5 cm Rebar 10 cm Rocks

Latrine Foundation Layout 7m 70cm 100cm 2.7m 100cm 50cm 100cm 25cm 100cm 25cm 100cm 25cm 100cm 25cm 100cm 50cm FRONT See following slide for detail of mold of (5) squares

Latrine Foundation Layout cont´d (5) square molds should be placed spaced equally at 25cm After the foundation has cured, pits will be dug in these locations 90cm outside dia. 100cm outside dia.

Latrine Foundation Trench Layout 7m 50cm 120cm 2.7m 70cm 50cm 100cm 100cm 100cm 100cm 100cm 50cm FRONT Trench – Cross section (15cm X 15cm)

Latrine Foundation Trench Layout

Latrine Foundation Rebar Layout 7m (10) Equal Spaces at 25cm 2.7m 20cm (28) Equal Spaces at 25cm FRONT Strip Footing Rebar (see following slide for details) 3/8in Rebar

Latrine Foundation Rebar Layout Note: In these photos rebar was terminated 20cm before the form all around. 10cm diameter stones were added to fill this area. Agua Para La Salud considers this an acceptable design.

Latrine Foundation Strip Footing Rebar Details 10cm 10cm Strip Footing Rebar is tied every 20cm using 5mm thickness tie wire 7cm 20cm 7cm A (SECTION A) (NOTE: TIES NOT SHOWN) (PLAN) All Reinforcing steel shall be 3/8in Strip Footing Rebar should be tied every 20cm using 5mm thickness tie wire

Latrine Foundation Strip Footing Rebar Details Strip Footing Rebar is tied every 20cm using 5mm thickness tie wire

Attach the rods using small pieces of metal wire, ensuring that once tied, there are no sharp tails left. For rods that are parallel to each other, a simple wrap round and twist with a pair of pliers, will be sufficient. Allow at least 10 cm overlap of bars

For rods that are perpendicular to each other use an “iron workers knot “ illustrated in the pictures opposite.

For the foundation, use a sand, gravel to cement ratio by volume of 3 parts gravel 1.5 parts sand 1 part cement It is not necessary to smooth the tank floor to perfection. A finishing layer will be added as a last step.

Pouring Concrete Concrete should first be mixed dry to obtain a homogeneous mixture Water is added until the desired consistency is obtained Concrete is then poured into the form

Placing Block

Placing Block How to Begin Mortar is mixed as 2 parts sand to one part cement by volume, then placed below the block along the edges. First the 4 corner blocks are placed, with the outside face of the block placed 50cm from the edge of concrete. A level tool should be used to ensure the block is placed level. Once the 4 corner blocks have been set, place a string (fishing line works well) across the top edge of a block to another corner block. A hack saw blade can be used to put a line in the block to allow the string to pass exactly across the top edge of the block. The string will be used to your line while setting block.

Placing Block Setting Corners Level Use a level tool to ensure the block is set level Also measure the height of the block to be sure the top of block is at the same height

Placing Block Set a String Cut a small notch into the top corner of the blocks at each end Run a sting (fishing line works well) across to another corner block The string will be used to set the blocks in between at correct location and height Be sure the string runs along the top edge of each corner block Fishing line placed between corner blocks Notched Corner

Placing Block Set a String The string should be used whenever setting a new line of block Here a string can be seen set to place the wall in between two stalls

Placing Block How To First Place two lines of mortar along where the bottom edge of the block will sit

Placing Block How To Now add mortar onto the block, on the side that will attach to the block at one side

Placing Block How To Now place the block in position Use a hammer to get the top edge of the block perfectly in line with the sting set for this purpose

Placing Block How To Now fill in any remaining gaps with mortar and make the joint flush on all sides

Placing Block Finishing Mortar Joints The joints between each stone should be finished using a 3/8” diameter bar to give a clean joint All exposed joints should be finished

Placing Block Finishing Mortar Joints When the joint has been finished it should look like this

Finishing Touches A final layer of cement is used to give the seats a smooth finish Mix cement for finishing layer with 2 parts sand to 1 part cement A hammer should be used to knock out cement and ensure a good fit of the seat within the contours

Ready to Use!