INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.

Slides:



Advertisements
Similar presentations
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Walls crates cables gas chambers electronics CERN adb.
BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
Tunnel Gallery Girders x ADC’s HV Power supply Rack channels digitizer VME module (SIS3300), 12 bits 96.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Straw electronics status  Signal generation and formation in straw  Webs + Cover  Backend  TTC  Services + DCS  New engineer on VIA program Georgios.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
BLM FOR THE INJECTORS PROJECT LINAC4 & PSB Linac4 Beam Coordination Committee - Meeting 33 (31/05/2012) Christos Zamantzas
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
BLM FOR THE INJECTORS PROJECT LINAC4 & PSB Beam Instrumentation Review – 18/10/2011 Christos Zamantzas
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Software for Testing the New Injector BLM Electronics
LKr status R. Fantechi.
BE-BI Activities and Status: LHC and Injectors
Brief Status SPS Prototype PSB Prototype Installed in LS1
EYETS David Hay EN-OSS.
Injectors BLM system: PS Ring installation at EYETS
Mini-drawers, FE-ASIC , Integrator
PMT cabling Gian Luca Raselli INFN Pavia
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
EMU Slice Test Run Plan a working document.
WP02 PRR: Master Oscillator and RF Reference Distribution
Injectors BLM system: PS and PSB Ring installations at EYETS
LHC BLM system: system overview
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
Combiner functionalities
BLM planning 24/02/2014.
BLM planning 03/03/2014.
Tunnel hardware installation
BLM planning 03/02/2014.
Presentation transcript:

INJECTORS BLM BI-TB on Proton Injector start-up

Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors with BLECFT; no budget for new system PSB Legacy Calibration of ACEMs on-going New Under deployment; in parallel to legacy system PS Legacy Calibration of ACEMs on-going New ACQ Cables ready; responsibility of acq. system under BI-SW Diamond 2 detectors operational; no more cables available SPS Refurbishment of crates; new HV power supplies; work in LSS1

LEGACY SYSTEMS

LINAC2 | PSB & PS Legacy Systems LINAC2 ► Possibility for a new system briefly discussed, but finally no official request or budget allocation. ► Currently, 8 detectors with the BLECFT portable measurement system. PSB & PS legacy systems ► All ACEMs removed for calibration ► Approx. two more weeks needed ► Afterwards, 2-3 days per machine for re-installation. ► 22 new detectors used (last batch available; end-of-life) 4 E. Effinger

PS new acq. | SPS system PS new acquisition system ► New cables ready to be installed (< 1h) ► Some small reduction in sensitivity to be expected ► Remaining tasks are with BI/SW PS Diamond based system ► Two Diamonds available (pos. 16 & 42) ► New position requested (pos. 15), but no cable is available SPS system ► Refurbishment of all crates ► Replacement of HV power supplies ► Some cable changes in LSS1; with deprecation of one monitor 5 J. Emery E. Effinger

NEW SYSTEM FOR PSB

Cabling Diagram 7  Screen of HV BNC is open on the IC side to assure there is no ground loop.  Internal screen to shield low frequency noise (GND only on electronics side, IC is floating).  External screen to shield high frequency noise. BNC SMA TRIAX Connector Types: 13/02/ Ionization Chamber 50 ÷ 200 m~ 1 m CKC50 BNCSMA Acquisition Card (BLEDP) External Screen 2 Internal Screen 1 Signal HV Power Supply (~1500 V) HV BNC BNC Patch-cords

BLM Cable installation in PSB New cable (CKC50) production run on tight schedule: ► Modification of the CKB50 specs ► Completed and delivered on-time Re-installation in PSB ► Conformity measured (developed a test-bench) ► Completed on-time Patch-Cords ► Several types needed (length and connector type) ► Currently under production HV CablesSignal Cables Signal and HV Patch-Cords 13/02/

BLM Detector Installation in PSB 9 PeriodPositionStatusComment 1 Internalok 2 Internalok 3 Internalok 4 Internalok 5 Internalok 6 Internalok 7 InternalokBPM pickups 8 Externalpartiallycustom support 9 Internalok1230uSv 10 Internalok 11 Externalnotcustom support 12 Internalnotno access at the moment 13 InternalokRF cavity 14 Externalokdisplaced due to ion pump 15 ExternalnotExtraction custom support 16 Internalok  Three periods require special supports due to space restrictions.  will be installed during technical stops  Patch-Cords not yet connected to the detectors  planned for next week  No access in period 12 due to crane renovation  scheduled for last week of February Support with Detectors configuration Tunnel installation: Very tight integration

Status of PCB Development All prototypes verified and functional. Pre-Series production will need to cover needs till LS2. Contracts for the Acquisition and Mezzanine modules ready – to be launched around March Name Acrony m Number of Components /7 Prototype DevelopmentPre-SeriesSeries Acquisition Module BLEDP1934 First Prototype (1 piece) V1.0 (2 pieces) V2.0 & V2.1 (3 pieces) - Production V3.0 (20 pieces) Production V3.x ( pieces) Acquisition Backplane BLEBP1173- V1.0 (2 pieces) V2.0 (1 piece) Production V3.0 (7 pieces) - Production V3.0 (10-15 pieces) Processing Mezzanine BLEPM210- V1.0 (1 pieces) -- Production V2.0 (20 pieces) Production V2.x ( pieces) Crate Main Panel BLEMP52- First Prototype (2 pieces) V1.0 (2 pieces) Production V2.0 (7 pieces) - Production V2.0 (10-15 pieces) Crate Control Unit BLECU180- First Prototype (1 pieces) Second Prototype (1 pieces) Production V1.0 (7 pieces) - Production V1.0 (10-15 pieces) Acquisition Crate BLEAC200- First Prototype (1 pieces) V1.0 (2 pieces) Production V2.0 (7 pieces) - Production V2.0 (10-15 pieces) Crate Programmer BLEJP160-- First Prototype (1 pieces) Production V1.0 (7 pieces) - Production V1.0 (10-15 pieces) High Voltage Distribution BLEHV Production V1.0 (7 pieces) - Production V1.0 (10-15 pieces)

BLM Electronics installation in PSB All large components have been installed: ► Processing crate (VME64) ► Acquisition crate ► HV Distribution crate ► Fan-trays ► CIBUS To be installed (currently under production): ► Electronic cards ► HV Power Supply crate ► Signal Patch-cords (SMA-to-TRIAX) Rear viewFront view Rack in BAT42 13/02/

Dust issue in PSB rack under the floating floor there is wood dust ► probably from cutting the panels when the new floor support was installed (?) cooling fans will deposit it in the electronics Asked help from the PSB responsible (David Hay) 12

Thank you 13

Reserved Slides 14

New BLM System Overview 15

Acquisition module (BLEDP) 16 Backplane connection Analogue inputs, power and control SFP connectors Gigabit optical and/or Ethernet links FPGA Altera Cyclone IV JTAG connection Local programming and diagnostics Acquisition digitisation of 8 channels Completed verification of version 2 of the printed circuit board Completed verification of version 2 of the printed circuit board Completed design of version 3. - Noise reduction Completed design of version 3. - Noise reduction