HLTC 15 th April 2014 EDMS:1374785 Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Design Office meeting Design office meeting.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
Construction and Installation of the CLIC Experimental Area
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
Catia Forum CAEC in short Organization Current composition of CAEC Sub-committees and Working groups CAEC in short Organization Current composition.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
2 nd PH-DT Training Seminar CERN TODAY An introduction to rapid prototyping techniques by C.Bault, PH-DT-EO NEXT on 3 th October at 11:00 Overview.
Update on the Laser Beam Line
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Extraction and beamline progress B.Goddard TE/ABT.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Latest news from GUCS ( Groupe Utilisateurs Catia-SmarTeam ) T.Klioutchnikova10th Catia Users Forum 22/03/2012.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
19 th CATIA FORUM Introduction. 2 April th CATIA FORUM2 A BIG THANK YOU TO JEAN-PIERRE FOR THE 18 PREVIOUS ONES !!! … and to all people (past and.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TE-CRG Activities D. Delikaris, TE-CRG.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
I. Bergevoet - Training preparation
TAXS and TAXN ABSORBERS - OVERVIEW
Equipment simplified model SMR UR safety
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Y. Muttoni - J.P. Corso TS Workshop Archamps
RWTCS Steering Commitee
RDR Baseline Layouts for Interaction Region
Project management Ray Veness.
East Hall under construction
Presentation transcript:

HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia

2 Summary Introduction : what is integration? Mandate Design office overview Integration work process CAD data in project HL-LHC Our strengths Possible issues Cad data and time life project PLM working group Conclusions Y. Muttoni EN-MEF-INT

3 Introduction : what is integration?

4 Mandate Provide the existent 3D CAD* data environment (using also reverse engineering) to realize new equipment studies. Centralize all the new 3D CAD data provided by all the design offices involved in a project (see slide integration work process) In order to guarantee the correct installation of each machine equipment and also to avoid the interferences during installation phases, handling and transport, the integration studies are an essential step in this project realization. In future also key to minimise radiation to personnel. Using our integration work feedback learnt during the previous following project LEP Machine LEP Machine to LHC Machine correct and apply the methodologies to new project LHC Machine to HL-LHC Machine** * CAD Computer Aided Design Y. Muttoni EN-MEF-INT ** Also LIU Project, HieIsolde, Elena and more

5 Design office overview Integration Deliverables: o 3D Integration assembly of the services for the machine (Picture 1) o Simplified models of machine equipment (Magnet, collimator, vacuum pipe) (Picture 1) o Layout machine in 3D and 2D layout drawing o Meshing scan* to check installation services (Picture 2) o Some mechanical drawing (Doors, shielding blocks, light metallic structure) Picture 2 Picture 1 Y. Muttoni EN-MEF-INT *treatment cloud of points provided by survey team in using a laser scanner

6 The design offices in the service groups Services and Infrastructure design offices Electrical services EN/EL. Cables trays, Racks layout. Cooling and ventilation EN/CV. Pipes, Water pump, Air duct. Transport and handling EN/HE. Transport volume, Handling equipment Civil Engineering GS/SEM. Building, underground cavern. Metallic structure. Cryogenic equipment TE/CRG. Cryogenic pipes, cryogenic plants. Deliverables: o 3D Model for integration (Theoritical/As built*) o PID Piping Instrumentation Diagram o Specification drawing o Installation drawing o Mechanical drawing Y. Muttoni EN-MEF-INT * To be clarify by methodologies

7 Design office overview Mechanical Machine equipment EN/MME Vacuum chamber, magnet, collimator …. Detector equipment inside the machine PH Roman pot, detector scintillator …. Deliverables: o 3D Model detail assembly for manufacturing and as built o 2D drawing detail assembly for manufacturing and as built LHC Collimators in DS plus QTLC Y. Muttoni EN-MEF-INT

8 Study phase 3D models Integration Team Design offices Metallic structure Shielding Lift Ventilatio n Cryogenic Eq. Access control Câbles tray Piping Sector door Electrical Eq. Civil engineering Ventilation door Transport & handling Security Eq. Fire detection Survey Integration work Process Machine Equipment Vacuum Magnet Beam Instrumentation Etc.. Services design office Integration meeting Ex: LS1 R2E Project ICL MeetingNumber by year Y. Muttoni EN-MEF-INT RF equipment Mechanical design office

9 Study phase 3D models Integration Team Design offices Metallic structure Shielding Lift Ventilatio n Cryogenic Eq. Access control Câbles tray Piping Sector door Electrical Eq. Civil engineering Ventilation door Transport & handling Security Eq. Fire detection Survey Machine Equipment Vacuum Magnet Beam Instrumentation Etc.. Mechanical design office Share the 3D data with external design office Integration work Process Y. Muttoni EN-MEF-INT RF equipment

10 Study phase Installation drawings or Installation presentation 3D models Design offices Integration team Metallic structure Shielding Lift Ventilatio n Cryogenic Eq. Access control Câbles tray Piping Sector door Electrical Eq. Civil engineering Ventilation door Transport & handling Security Eq. Fire detection Survey Integration work Process Y. Muttoni EN-MEF-INT

11 EN-EL Cables tray Installation drawing EN-CV Piping installation drawing EN-MEF Access control installation drawing Y. Muttoni EN-MEF-INT

12 CAD data in project HL-LHC

13 Our strengths Excellent relationship among design offices and designers. General effort to keep the designer knowledge to guarantee the quality of the 3D models provided by all design office. Management support to keep the number of designer in the integration section to realize the work (Integration studies and installation follow up). Dedicated integration meeting with designers (mechanical and services) and project engineer. ICL meeting linklink Using at CERN the same CAD software 3D. Using scanning* method to realize reverse engineering. Using scanning* method to check the new installation. To provide better tailored integration information and continually updated environment we do not provide integration drawing but we validate and approve 3D model and simplified PPT documents in EDMS. *See slide 5

14 Possible issues to watch and to improve Integration design office A better follow up by integration designer to update integration approbation. External design offices Necessary to stabilize the number of designer in each design office to be able provide CAD data. CAD data exist without design owner (ex: waves guide RF) All design offices Some CAD data should be used by the project with a migration cycle did not yet complete (ex. Many 3D model to an unique equipment necessary to clean data). See next slide. Not clear status indicator available to give the maturity of the 3D model. (PLMWG : Specification, Support : implementation)

15 Time life CAD software vs time life project. Using the feedback CAD software Euclid vs machine LHC Data migration Completely different CAD software During all the exploitation of the machine the CAD data should be available to visualization and modification. Cad data and time life project Y. Muttoni EN-MEF-INT

16 PLM working group On courtesy of S. Bally Y. Muttoni EN-MEF-INT

17 PLM working group On courtesy of S. Bally Y. Muttoni EN-MEF-INT

18 Conclusions All design offices at CERN should continue to work with the same CAD Software the same PDM* and the same methodologies. The high level of radiation increases the need to have the better visualization of the virtual machine. Put in place at CERN the correct process to produce CAD data to exchange the correct CAD data with external firm or collaboration. ( Input PLMWG) Quality assurance plan should be involved in the process. (Cycle approbation integration part of QA plan) Now design offices already are producing new data to HiLumi project data management and data structure shall follow. Future CAD software Which? When? How? Migration data? * PDM Product Data Management Y. Muttoni EN-MEF-INT

19 Thanks for your attention Questions?

20 Annexe

21 3DVia Player 3D integration published Regular publication are necessary to keep the version updated. The 3D publication provided 3D view to non CATIA/Smarteam users. Y. Muttoni EN-MEF-INT

22 CAD Data in project HL-LHC Software used at CERN Using CATIA V5 software to create 3D model and 2D drawing. Using SMARTEAM software to store the CAD data. Memo CAEC * Requirements on user access to CERN CATIA and SMARTEAM (Edms )Edms EDMS to exchange data with external firm. Rules and process should be written to produce to share and to protect the data (See slides on PLMWG) * Computer Aided Engineering Committee Y. Muttoni EN-MEF-INT