COMMISSIONING FIRE-LIFE SAFETY SYSTEMS Presenter: Mark Leafstedt, PE, CxA 2008 ACG Annual Meeting Best Practices for Total Building Commissioning!

Slides:



Advertisements
Similar presentations
Special Inspections
Advertisements

TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Basic Fire and Smoke Training Basic Fire and Smoke Actuators & Dampers.
Steve Williams, P.E. | Brian Olsen, P.E.
Presented April 16, 2009 at the ACG Annual Meeting in Chicago, IL. GAYLON RICHARDSON Engineered Air Balance Co., Inc. Houston, Texas 5/7/20151.
Four Learning Objectives Understand Smoke Control Theory Understand Design Methods Know Your Role in Commissioning Tests Be Familiar with Hardware, Test.
Elevators & Fire Alarm Systems: Understanding Interface Requirements Presented by: Antonio Torres- North Central Regional Sales Manager.
2007-CBC - UL Damper Requirements
AIRSIDE DESIGN © Copyright 2008 HVAC Design Solutions1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” Essential.
Enclosure Fire Dynamics
Building Codes Violation of building codes and regulations can cause injury to building users and expose architects to legal liability and the possible.
Retirement Home Regulated under the Retirement Home Act, 2010.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FALAR Part 3 – Post Construction  Compilation of  Maintenance records of fire protection/life safety equipment  Test records of fire protection/life.
FPF190: Fire Protection Fundamentals FPF190 Fire Protection Fundamentals 1 Code Consultant.
WELCOME DBI & SFFD Meet the Pros October 11, 2007.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
Unit 8: Portable Fire Extinguishers & Smoke Control Management Systems
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Smoke Control Systems Introduction and Commissioning
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Facilities Institute July , 2012 Houston, Texas CONSTRUCTION AND RENOVATION WARRANTY/GUARANTEE What Do You Get And When Does It.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Data to Deployment Clark County Fire Department IAFF 2007 EMS Conference.
Improving smoke control and protecting lives Air Sealing Industrial, Commercial, Institutional and Multi-Family Buildings to Improve Smoke Control.
Building Codes. Codes  Building Code –Regional  BOCA, SBCCI, CABO, UBC, CITY OF DALLAS, –National  IBC  Fire Code –NFC, UFC, NFPA, Life Safety 101.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Introduction to Building Codes. Babylonian Code of Hammurabi Purpose of Building Codes Engineering Failures US History of Building Codes Building Officials.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Building Codes COSC459_PPT2. A building code, or building control, is a set of rules that specify the minimum standards for constructed objects such as.
Firestopping – Filling the Gaps Makes a Difference Poole Fire Protection Brian Griffin & Jack Poole, PE 2007 DOE Contractor Fire Protection Workshop Argonne.
Design Intent Phase Design Intent Phase Determine what the design intent is and how the building is to operate when it is complete. Determine what the.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Barrier Management strategies
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Work Area Method Level 3 Alterations – Chapter 9 prescribes requirements. 50% of Building Area Rule.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
ACSR Report The 33rd ARCASIA October 29 ~ November 2, 2012 Bali, Indonesia Korea Institute of Registered Architects (KIRA)
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
 The airborne solid and liquid particulates and gases evolved when a material undergoes pyrolysis or combustion. – NFPA 92A  Follows Path of Least Residence.
Steve Griffith February 28th, 2017
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
Barrier Management Symposium
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Global Connections Day Building Safety Service Provider
Building and Fire Codes
Emergency Evacuations: Multi-Level Apartments
Fire Door Inspections Qualified Training
Introduction to Building Codes
Introduction to Building Codes
MGM Grand Hotel and Casino Fire
General Requirements of NFPA 101
Introduction to Building Codes
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Presentation transcript:

COMMISSIONING FIRE-LIFE SAFETY SYSTEMS Presenter: Mark Leafstedt, PE, CxA 2008 ACG Annual Meeting Best Practices for Total Building Commissioning!

Agenda  ¡ Viva Las Vegas !  Fire Life Safety Building Codes  Means & Methods of Fire Life Safety Commissioning  Conclusion

Statistics According to 2005 statistics published by Insider Viewpoint Las Vegas:  80+ major casinos  133,000 hotel rooms w/ 89.2% occupancy (20,000+ more open by 2010)  38.6 million tourists >25 billion $ in current construction 7 out of the top 10 world’s largest hotels reside within a five-mile radius of each other in Las Vegas The largest hotel has approximately 5500 guest rooms Viva Las Vegas

Relationship to Commissioning  100% growth each year since 1950 = More construction  Schedule = Liquidated damages of up to $7 million a day  Dependency on tourism = Occupant comfort is paramount  Reputation = Need for safety and strictest codes in the country  High occupancy = Little to no time for maintenance Viva Las Vegas

Building Commissioning is an owner-driven requirements. Smoke Control/ Life Safety Commissioning is a Code driven requirement. Life Safety Cx vs Building Cx Viva Las Vegas

The MGM Grand Fire  1980 fire swept through the 26-story hotel, killing 84 and injuring 679.  There were about 5,000 people in the hotel at the time.  This was the second largest hotel fire in history.  It started in the first floor restaurant and spread at a rate of 19 feet per second.  A massive fireball traveled through the casino and blew through the glass entrance doors, injuring people and destroying cars. WHAT? Viva Las Vegas

The MGM Grand Fire  The Hotel had refused to pay for the $192,000 sprinkler system. WHY?  A wire was not properly grounded.  A compressor was not properly installed.  A supposedly smoke-free stairwell that was a crucial escape route filled with smoke.  A piece of copper was not insulated correctly. …all of which “could have been found had the area been inspected.” Source: Sunday, November 19, 2000, Copyright © Las Vegas Review-Journal “MGM GRAND FIRE: THE DEADLIEST DAY” by Glenn Puity Glenn Puit  The laundry chutes failed to seal, and defects existed in the HVAC system -- all contributing to the spread of smoke.”  A fire alarm never sounded. Viva Las Vegas

MGM GRAND FIRE OF 1980 Just one bad Building? Just 3 months later, there was a fire in the Las Vegas Hilton that resulted in 8 dead and 198 injured.

Results of the MGM Fire $223 million in legal settlements Extensive Changes in NFPA Including fire protection for seismic joints, elevator standards, smoke-proof enclosures, active/passive fire protection systems Evolution of the following building codes for high-rise buildings 1994 UBC, section UBC, section IBC, section 909 Globally Viva Las Vegas

History of the Building Codes Smoke Control Requirements Fundamentals of Smoke Control Systems Section 909 of 2003 IBC Fire Life Safety Building Codes Agenda

Building regulations date back to the beginning of recorded history. The Code of Hammurabi (2200B.C) included simple but effective building code provision. “If any architect built a house so negligently that it fell down and killed the owner’s son, then the architect’s son was put to death.” In 1630, the City of Boston mandated that “no man shall build his chimney with wood nor cover his roof with thatch”. The enforcement authority is derived from the 10th Amendment of the US Constitution which gives states the right to legislate for the protection of the public health, safety and welfare. Code Overview

History Prior to the issuance of the IBC, there were three organizations of building officials who were responsible for developing and enforcing building codes in the United States: Building Officials and Code Administrators (BOCA) in the Northeast and Midwest International Conference of Building Officials (ICBO) in the West Southern Building Code Congress International (SBCCI) in the Southeast Code Overview

Definition “A combination of architectural, electrical & mechanical system design approach that utilized air flow and/or pressure to contain or remove smoke during a fire event” Code Overview

Requirements High Rise Exit Enclosures Atriums Covered Malls Underground Building Code Overview

Fundamentals Active: An active smoke control system utilizes mechanical air handling equipment, i.e. supply fans, relief fans or smoke exhaust fans to contain or remove smoke in the zone of origin. Passive: A passive smoke control system utilizes construction barriers to maintain the smoke in the zone of origin. (Typical passive smoke control systems would be found in equipment rooms, motel rooms.) Types of Smoke Control: Code Overview

Section 909 of 2003 IBC Section : This section discusses: Acceptance Testing Individual Device Testing Detection DevicesDuct Traverses DampersInlet/Outlet Air Quantities Fans Smoke Barriers Special Inspection Reports Code Overview

How Hard Can it Be? Roles & Responsibilities Commissioning Phases Means & Methods of Fire Life Safety Systems Commissioning Agenda

How Hard Can it Be? Introduction Detail Timing Intensity Means & Methods

How Hard Can it Be? Introduction Similar Process to Mechanical Cx Failures Critical Special Inspector Means & Methods

How Hard Can it Be? Detail Simplistic in Concept Complexity in Detail & Quantity Requirements Code Prescribed 100% Testing Means & Methods

How Hard Can it Be? Timing “DONE” Done prior to Certificate of Occupancy Testing Concurrent w/ Construction No Post-Occupancy Deficiencies & Issues Means & Methods

How Hard Can it Be? Intensity Critical Construction Sequencing C 3 Syndrome (Construction Completion Conjestion) Panic Means & Methods

Roles & Responsibilities Prime Contractor Subcontractors Designer Owner Commissioning Provider Means & Methods

Roles & Responsibilities Prime Contractor Construction of the Envelope Coordination Communication Scheduling Advocate! Means & Methods

Roles & Responsibilities Subcontractor(s ) Provide Input into the schedule Attend meetings Provide realistic completion information Avoid defensive posturing Assist in finding resolutions Proactively & quickly respond to deficiencies Means & Methods

Roles & Responsibilities Designer Provide detailed smoke control diagrams Respond timely to to questions, issues, & changes Means & Methods

Roles & Responsibilities Owner Hire the Commissioning Provider (req’d by code) Remain calm amidst the chaos Provide Contractor direction (if necessary) to respond to Cx issues & deficiencies Means & Methods

Roles & Responsibilities Commissioning Provider - General Part coach, task-master, expert, judge & mediator Build a Team!! Coordinate & Manage Cx Activities Obtain, assemble, create & submit Cx documentation Meet & coordinate with the AHJ Means & Methods

Commissioning Phases Life Safety System Commissioning Phases Design & Construction Document Review Document Development Pre-Functional Testing Functional Testing Commissioning Completion Means & Methods

Commissioning Phases Life Safety System Design Review Fire Protection Report provided? Equivalent to Design Intent (Referred to as a “Rational Analysis” Means & Methods

Commissioning Phases Life Safety System Design Review Are the smoke control diagrams complete? Are all fire/smoke dampers shown? Do the sprinkler zones & smoke boundaries match? Means & Methods

DESIGN DOCUMENTATION Smoke Control Diagrams - Floor Plans Means & Methods

Commissioning Phases Design & Submittal Review Are all smoke control devices included? Is the equipment compliant with the code? Does the smoke control system contractor’s design-build design meet the Engineer’s design, codes & AHJ criteria? Means & Methods

Smoke Control Diagrams - Functional Matrix Means & Methods

Passive Zone Leakage Calculations Means & Methods

Commissioning Phases Document Development Develop the commissioning plan Detailed roadmap of expectations Develop functional testing scenarios Must include an individual check-off for EVERY piece of equipment Submit Cx plan to the AHJ Means & Methods

DOCUMENTATION DEVELOPMENT Means & Methods

DOCUMENTATION DEVELOPMENT Means & Methods

Commissioning Phases SectionLife Safety System OutlineHVAC System Outline 1Acceptance LetterExecutive Summary 2 Commissioning Team 3 Mechanical System Overview 4Overview of Acceptance Testing ProceduresOverview of Commissioning Procedures 5Fire Protection ReportRecord Document - Sequences of Operation 6Smoke Management Sequences/MatrixPre-Functional Testing Checklists 7Component Testing FormsFunctional Testing Procedures 8Functional Testing Scenarios & ResultsDeficiencies & Issues Log 9Test & Balance ReportDaily Logs 10Product Data SheetsMiscellaneous Data 11Deficiencies & Issues Log 12Daily Inspection Reports 13Non-Compliance Reports 14Miscellaneous Data Means & Methods

Commissioning Phases Pre-Functional Assist in component pre-testing before functional Individually confirm F/S Damper commands and status feedback. Confirm fan command & status Review FAS software “rules” Means & Methods

COMPONENT INSPECTION Pressurization Fan Means & Methods

COMPONENT INSPECTION Fire Smoke Damper Means & Methods

COMPONENT INSPECTION Fire Command Means & Methods

COMPONENT INSPECTION Fire Fighter’s Smoke Control Panel Means & Methods

COMPONENT INSPECTION Fire Protection Flow Station Means & Methods

Commissioning Phases Pre-Functional Provide site observations & barrier inspection Means & Methods

BOUNDARY INSPECTION Conduit Penetrations Means & Methods

BOUNDARY INSPECTION Floor Slab Penetrations Means & Methods

BOUNDARY INSPECTION Duct Penetrations Means & Methods

BOUNDARY INSPECTION Elevator Shaft Enclosure Means & Methods

Commissioning Phases Functional Testing When does FT begin? Does construction have to be complete? How can FT be phased? How can multiple tests be avoided? Means & Methods

Commissioning Phases Functional Testing Assist in or define testing teams Witness functionality testing of the system Include component interaction Track deficiencies Means & Methods

PASSIVE ZONE TESTING Means & Methods

DUCT DETECTOR TESTING Means & Methods

Commissioning Phases Commissioning Completion Submit final report to AHJ Correct report deficiencies Assist in coordination & scheduling of AHJ Assist during the AHJ inspection ALL SYSTEMS TESTING! Means & Methods

Summary Discussed Critical Nature of Life Safety Systems Reviewed Code Requirements Discussed Life Safety System Commissioning Means & Methods Encourage Life Safety System Commissioning in other Cities Conclusion

Questions ? Thanks for your attention!