Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.

Slides:



Advertisements
Similar presentations
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Advertisements

Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
How to Make a Hot Air Balloon
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.
Teacher Pack Boat Design & Heritage (KS 2). 1. Floating and sinking Divide the items into two piles: 1) objects you think will float 2) objects you think.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
1. Veneering Veneering is a method of taking thin slices of more expensive wood and gluing them onto cheap manufactured boards. Why veneers are used:
Joining materials Wood, Metal and Plastics
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Jigs and Fixtures.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
PLAN #PartProcessTools and equipmentQuality controlSafety *Aprons must be worn is ALL stages of manufacture Tim e 1 MDF base Mark out on MDF piece Pencil,
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
Progress on staves – mechanical & thermal. Core and materials.
Left side Right side Note pad Roll block. The Plan.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
Production Decisions Chapter 6 Mr. Higgins. Objectives Identify the need for a plan of procedure Identify the need for a plan of procedure List the steps.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Visit to Heidelberg Loek Ceelie Henk Schuijlenburg.
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
What simple machine is in a windmill? Prediction: Wheel or Gear.
Stave production.
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
STC Plant Growth and Development Lesson 14: Making a Bee Model Option B Kennewick School District.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Building Boxes What is the largest volume open top box that you can build from an 8 ½ by 11 inch sheet of paper?
Stave Tooling & Plans for Future Stave-building (Tim)
Egg Carrying Rocket Complete Your goal is to have your rocket looking something like this at the end of this section– fins attached and rocket engine block.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
"Cryptex Style" Maze Coin Puzzle
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
The first step is to measure the depth of your box.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Ork Watch Tower – First Floor Measurements may vary on your printer
25th Annual 7th and 8th Grade Battery Car Challenge
Pipe Bending Ian Mercer, Harald Fox, Richard French.
Day 1.
Reminder of Stave250 Tooling Design
Horizontal Milling Operations
Bunker Wall Design Wall ESS
Presentation transcript:

Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014

Outline Recent Stave building experience – Plank#9 –> for wire bonding trial ( to evaluate if C- channel close out is adequate ) – Stave building steps Stave tooling Observations

Main Steps (Tape + CF prepreg) to make a pair of co-cured face sheets Glue lower foam blocks Glue cooling pipe, upper foam blocks and end closeouts Glue CF c-channels (side closeouts) Glue honeycomb core CNC machine to the designated height Glue the top skin on Trim Stave to size (using vacuum jig and C channel clamping pieces).

Some pictures  Partial stave core assembly after CNC machined to the designated core height (4.6mm from the face sheet).  Honeycomb at various places have been ripped off –> not enough glue! Smaller honeycomb pieces shows better gluing result than the bigger / longer pieces -> possible explanation and it needs to investigate further.  The ripped off honeycomb area have been repaired with Hysol and abrasive paper is used to bring it to the same height as the rest. Ripped off HC after machining

Stave tooling Current stave tooling used: – CF Vacuum Jig – C channel clamping jig – Cooling pipe gluing jig – Rulers and various location blocks New stave tooling – This includes new vacuum jig; – Stave side close out placement jig; – Other new jigs / modification on existing jig design as required.

New Vacuum jig Various hole patterns need to be added on the vacuum jig for the stave tooling (e.g. holes for reference corner pieces, c channel clamp jig, etc….). In addition, it – Provides reference features for gluing the locking points. – Provides 2 off 10mm dia dowel through holes and 8 off M10 clearance through holes are needed for positioning and fixing the vacuum jig onto the sub-plate of the CNC machine at Oxford (steel inserts preferred, holes go through those Steel pads at the bottom side of the jig). See next slide for detail. – Max length of the jig has to be under 1.6m. 2 off 10mm dia Dowel hole thru 8 off M10 clearance hole thru

X-section view Vacuum jig that holds the stave core Sub-plate on CNC machine Steel bush built into the vacuum jig Steel pad

Stave side closeout placement jig C channel clamping jig new design allows the variable stave width. If the stave side closeouts is changed from CF C-channels into other shaped channels (e.g. box section), this design will have to change.

Observations The old procedure suggested that the lower foam blocks glued on the face sheet first, then machine the cooling pipe channels and also to height; but recently 2 or 3 staves were done by machining the lower foam blocks to size before gluing to the face sheet. Need to decide which way to go. The cooling pipe gluing jig worked well, but need to improve (e.g. current jig can’t go through U-bend, also is difficult to hold it during the applying of the glue process). New jig should address these areas. Honeycomb core gluing - we should cut the honeycomb into smaller pieces and see if this gives better gluing quality. Need to design a proper glue bath for gluing the top skin. (Features like a Al plate with 0.5mm depth recess, and some reference features for Stave core partial assembly, and some indicators show where the cooling pipe locates etc) The way we did for trimming stave to size worked all right. All the tooling (e.g locations blocks and C channel clamping pieces, etc) need to be clearly marked, for correct position on jig.

Back up

Cooling pipe gluing jig