Robert Samour, P.E. Deputy State Engineer Valley Transportation

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion Board Retreat February 7, 2012.
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator April 5, 2011.
Reorganization of Procurement Services for Public Works Construction
Status Transportation Improvement Program & FY 2013 Five Year Spending Plan S. Alfred Kattan, P.E. Project Management and Construction Division Manager.
Lake Pleasant Parkway Final Design Dynamite to SR303L ASHE LAKE PLEASANT PARKWAY DYNAMITE TO SR303L C HRIS KMETTY, PE JAN 11, 2011.
Teaching and Learning Science & Assessment Informational Webinars Presenter: Linda Cabe Smith, Science Assessment Specialist Ellen Ebert, Science Director,Teaching.
Summative Math Test Algebra (28%) Geometry (29%)
TSPLOST Update River Valley Region TIA Citizen’s Panel April 24, 2014.
Budget Public Hearing and Budget Adoption Ralph Fortunato Director of Fiscal Services August 28, 2013.
Presentation to Berkeley Homelessness Taskforce August 15, 2013 Katharine Gale, Policy Director United States Interagency Council on Homelessness.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
Mead Valley Municipal Advisory Council October 17, 2012
PP Test Review Sections 6-1 to 6-6
The Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DPWH STRATEGIC INFRASTRUCTURE POLICIES AND PROGRAMS 1 Secretary ROGELIO L. SINGSON.
WHO – HIV department | August 18, |1 | November 2013 Core epidemiological slides HIV/AIDS estimates.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Great Western Corridor Feasibility Study
Bowls – A Sport for Life 69 Metropolitan Bowling Clubs read Jack Hi 140 Country Bowling Clubs read Jack Hi Hundreds of Community Members across the State.
TH 610 Design-Build Project S.P February 25, 2009 Dan W. Penn, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING Looking TH 169.
Western Piedmont Bicycle Plan Initial Survey Results October 22 nd, 2013.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
San Bernardino Associated Governments Presented to BDA/IE February 23, 2010 By Duane Baker, Director of Management Services.
To insert photo, click View > Master > Slide Master 1.42” x 1.83" To insert photo, click View > Master > Slide Master 2” x 2.68" To insert photo, click.
Before Between After.
Minnesota Assessment Update Jennifer Dugan “Leading for educational excellence and equity. Every day for every one.”
Weekly Attendance by Class w/e 6 th September 2013.
1 June 13, 2013YMPO RTP Technical Advisory Committee Meeting.
Physics for Scientists & Engineers, 3rd Edition
1 March 14, 2013YMPO RTP Technical Advisory Committee Meeting.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
Eileen O. Yazzie March 18, 2009 MAG Sub-Allocation of the American Recovery and Reinvestment Act of 2009 and Allocation Scenarios Transportation Policy.
Route Transfer February 2004 TAC Meetings. History of Route Transfer Study.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
2006 Annual Report on the Status of the Implementation of Proposition 400 Management Committee 9/6/06.
John S. Halikowski ADOT Director Phoenix Chamber of Commerce Transportation Committee Sept. 22, 2011.
Budget Update January 14, /14/ Non-Construction Local Sales Tax Month 3 Year Average FY2010 Budget FY2010 Actual% of Budget Projected FYE.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2010/11 – 2014/15 Presentation to Board of County.
The Missouri Department of Transportation 2007 Update.
Grand Canalscape Phase I and II General Update October 30, 2015.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
CAP Trail Master Plan: Pinal County Segment CAP Trail Draft Master Plan Presentation to Pinal County Board of Supervisors November 4, 2015.
TRANSPORTATION PROGRAMS HR 2487: Jobs for Main Street Act of 2010 MAG Regional Council January 27, 2010.
Valley Metro Update Open House and Public Hearing March 9, 2007.
EARLY PHASE INPUT OPPPORTUNITY Management Committee November 10, 2004.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
1 HIGH CAPACITY TRANSIT STUDY April 2003 MARICOPA ASSOCIATION OF GOVERNMENTS Final Presentation.
TRANSPORTATION PROGRAMS Fiscal Year Draft Transportation Improvement Program (TIP) Final Phase Public Hearing June 18, 2007.
FY 2006 MID-PHASE INPUT OPPPORTUNITY Regional Council April 26, 2006.
FY Annual Transit Performance Report Maricopa Association of Governments Transportation Review Committee February 26, 2004.
TRANSPORTATION PROGRAMS Re-Allocation of Unobligated ARRA Funds – Policy Options Eileen Yazzie Transportation Policy Committee September 23, 2009.
Regional Transportation Plan Draft Hybrid Scenario Transportation Policy Committee 7/22/03.
Phoenix Regional ITS Fiber Optic Backbone. PURPOSES  Improve agency operations by establishing a shared, regional, telecommunications network.  Create.
TRANSPORTATION PROGRAMS FY08–Arterial Life Cycle Program Regional Area Road Fund Closeout Transportation Policy Committee May 21, 2008 May 21, 2008 Eileen.
Arizona Forward Update
Bret Anderson Program Manager for Multimodal Planning
Maricopa County Transportation Improvement Program
Critical Transportation Issues
FY 2020 – 2024 Five Year Program Study Session January 29, 2019
Presentation transcript:

Robert Samour, P.E. Deputy State Engineer Valley Transportation ASHE Presentation Robert Samour, P.E. Deputy State Engineer Valley Transportation November 8, 2011

Update on ADOT Org. Changes

John Halikowski

Deputy Director for Policy Floyd Roehrich Jr.

Deputy Director for Operations John Bogert

Jennifer Toth State Engineer

Valley Transportation Group

Valley Project Management

ADOT Highway Program ● $5.4B FISCAL YEAR 2012 2013 2014 2015 2016 Statewide Highways $ 320 $257 $ 140 $ 123 $ 208 Statewide Subprograms $ 218 $ 230 $ 347 $ 313 $ 413 Subtotal $ 538 $ 487 $ 436 $ 621 MAG Area Highways $ 607 $ 465 $ 862 $ 731 $ 0 MAG Area Regionwide $ 44 $ 38 $ 37 $ 0 $ 651 $ 503 $ 899 $ 769 ADOT Program Total $1,189 $990 $1,386 $1,205

MAG RTP Freeway Program

FY 2012 CONSTRUCTION PROGRAM L303: Peoria to Mountain View, Landscaping, $7M SR51: Bell Rd to L101 FMS, 2M I-17: Arizona Canal - L101 FMS, $5M US60 Grand: L101 to McDowell, Ph 1, $21M L303: Glendale to Peoria & Thomas to Camelback, $189M I-17: Arizona Canal to L101 $5M FMS SR24: L202 to Ellsworth $148M SR51: Bell Rd to L101 $2M FMS L303: Thomas to Camelback $72M Glendale to Peoria $113M L303: Peoria to Waddell $2M Landscaping Waddell to Mountain View $5M Landscaping TOTAL $347M SR24: Gateway Freeway, L202 to Ellsworth, $148M

FY 2013 CONSTRUCTION PROGRAM I-17: L101-SR74 FMS, $8M SR51: Black Mountain Blvd TI, City of Phoenix Project L303: Landscape two roadway segments, $6M L303: Camelback Rd to Glendale Ave, $56M I-10: Perryville Rd TI, $18M I-10: Perryville Rd TI $18M I-10: 32nd St to L202 $167M Exp/Loc Lane Phase 1 I-17: L101 to SR 74 $8M FMS SR51: Black Mountain TI $24M City of Phoenix Project US60: Meridian Rd TI $12M L303: Camelback to Glendale $56M L303: Thomas to Camelback $2M Landscaping Glendale to Peoria $4M Landscaping TOTAL $291M SR85: Warner Street Bridge, $5M I-10: 32nd St-L202 Loc/Exp Ph 1, $167M US60: Meridian Rd TI, $12M

FY 2014 CONSTRUCTION PROGRAM L303: US60 Interim TI, $48M US60: L101 to Van Buren, Ph 2, $21M L303: Camelback to Glendale, Landscape, $2M L101: Shea Blvd to L202, GPL, $91M I-10/L303: TI Landscape, $7M I-10: 32nd St to L202 $114M Exp/Loc Lanes Phase 2 US60: L101 to Van Buren $21M Phase 2 L101: Shea Blvd to L202 $91M GPL L202: Dobson to I-10 $5M FMS L202: 17th Ave to 51st Ave: $228M new Fwy L303: US60 Interim TI $48M L303: Camelback-Glendale $2M Landscaping L303: I-10 TI $7M Landscaping TOTAL $516M I-10: 32nd St to L202 Loc/Exp Ph 2, $114M L202: 17th Ave to 51st Ave, $228M L202: Dobson to I-10, FMS, $5M

FY 2015 CONSTRUCTION PROGRAM *I-17, Arizona Canal – L101, GPL, $86M *I-17, Peoria – Greenway, Drainage Imp, $17M L202: L101-Gilbert Rd GPL, $56M I-10: Sky Harbor West TI, $37M L202: Baseline to Salt Riv. to Buckeye Rd, $223M I-10: Sky Harbor West TI $37M I-10: 32nd St to L202 $135M Exp/Loc Lanes Phase 3 I-10: L202 to Riggs Rd $69M GPL & HOV L202: L101 to Gilbert Rd $56M GPL L202: Val Vista to Dobson $6M FMS L202: Baseline to Salt River $46M Salt River to Buckeye $177M L202: Salt River Bridge $99M TOTAL $625M L202: Salt River Bridge, $99M I-10: 32nd St to L202, Exp/Loc Ph 3, $135M I-10: L202- Riggs Rd HOV & GPL, $69M L202: Val Vista -Dobson FMS, $6M

FY 2016 CONSTRUCTION PROGRAM ? I-10: Dysart – 83rd Ave $5M Landscaping I-17: Arizona Canal to L101 $86M GPL Peoria to Greenway $16M Drainage US60: L303 – L101 Ph2 $50M TOTAL $157M

Upcoming Alternative Delivery Projects ================================= I-10: Perryville Rd TI, Design Build US60 Grand Ave/SR303L TI, Interim, CMAR

MAG RTP Freeway Program FY 2012 Design Projects ================================= I-10: Perryville Road TI, Design-Build US60 Superstition: Meridian Road TI SR101L Pima: Shea Blvd to SR202L, GPL SR303L: US60 Grand Ave TI, CMAR SR303L: Thomas to Camelback & Glendale to Peoria, Landscape MAG Region wide: Four Drainage Tunnels, Drainage Tunnel Improvements

Where to Find Program Information ============================== ADOT – Freeway and Highways Statewide http://mpd.azdot.gov/mpd/priority_Programming/Five_Year_Programs.asp MAG – Freeways, Arterial Streets & Transit http://www.azmag.gov/Projects/Project.asp?CMSID2=1140&MID=Transportation

Robert Samour, P.E. Deputy State Engineer Valley Transportation ASHE Presentation Robert Samour, P.E. Deputy State Engineer Valley Transportation November 8, 2011