Www.bundesnetzagentur.de Development of CEPT and ITU deliverables Ralf Trautmann 6 th International Seminar on Spectrum Monitoring Kyiv, 10 – 12 July 2013.

Slides:



Advertisements
Similar presentations
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.5 – Electronic News Gathering Presenter: Andrew King on behalf of Roger Bunch.
Advertisements

ECC initiatives on spectrum for Programme Making and Special Events - PMSE Bruno Espinosa Deputy Director, ECO, Copenhagen.
EFIS (ECO Frequency Information System) Presentation to ITU-R Working Party 1B – 4-11 June 2013.
Activities in CEPT ECC/WGFM/ Project Team FM54
WRC-12 Preparation CPG Chairman /
Geolocation databases for spectrum sharing : ECC findings and studies EC DG CONNECT Workshop, 20 March 2015 Bruno Espinosa, Deputy Director, ECO.
Regulatory Framework in Europe Titus Spoelstra Wim van Driel CRAF URL:
SPECTRUM REGULATION IN EUROPE, ECC ACTIVITIES RELEVANT FOR UTILITIES Bruno ESPINOSA, ECO
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt October, 2009.
SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik,
LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Trial LSA workshop, Helsinki, 3rd September.
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand.
Doc.: 19-11/81r1 Submission July 2011 Junyi Wang, NICTSlide Liaison Report Notice: This document has been prepared to assist IEEE It is.
1 TIA Engineering Committees - Policies and Procedures TIA Staff.
PRESENTATION ON THE WORK OF WORKING GROUP 11 ON SPECTRUM MANAGEMENT EACO Seminar for Chairpersons of National Regulatory Authorities 28 May 2015 Kigali.
ITU-R Liaison Group Report - Session #70 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /00xx Date.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
ITU-R Liaison Group Report - Session #73 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0020 Date.
1.  Coordinated Universal Time, better known by its acronym UTC, is the legal basis for timekeeping for most countries in the world, and is the de facto.
©Ofcom IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008 Andrew Gowans, Head of Exempt Technology.
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
SEA in the Czech Republic Prague, 24 September 2008.
1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt October, 2009.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
CEPT/ECC-ETSI Co-operation Process
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
1 ITU-R Liaison Group Report - Session #71 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127.
Doc.: IEEE /??r0 TG4a PresentationSlide 0 Ultra Wideband in Europe The final few regulatory processes May 2006.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Possible Contribution to 11th Meeting of WP5D ~ Related to Updating of.
G5/4 Revision Project Progress Update Andrew Bower
1210 MHz of harmonised spectrum (ECC framework)
Updates on the digital dividend and UWB in the UK and Europe
Update on EFIS (ECO Frequency Information System) CEPT/ECC WGFM Civil/Military Meeting Dublin, November
Preparation for ITU Council 2016
SADC WRC-15 Preparatory Meeting
Reflection Of The NJFA In The ERC Report 25 (ECA Table) And Relation To EFIS And To The RSPP Inventory CEPT/ECC Civil/Military Meeting, November.
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
Activities in CEPT-ECC potentially relevant for UIC
Thomas Weilacher WG FM Chairman
Session 1 The ECC in practice, its structure, its working process
Session 4 ECO Documentation Database
Introduction to ECC PT1 February 2011.
Session 2 European Regulatory Environment (just a part!)
UNR116 splitting Informal document GRSG
Thomas Weilacher Chairman ECC Working Group FM
Broadband PPDR frequency situation in Europe
Doriana Guiducci, European Communications Office
RSPG 34th Plenary Meeting
Institutional changes The role of Bilateral Oversight Boards
EU-US-JP ITS Steering Group Annual Meeting 2018
Sergio Buonomo Counselor ITU-R Study Group 5
GSC: Standardization Advancing Global Communications
Relevant Activities in CEPT-ECC
Relevant Activities in CEPT-ECC
Reinhard Scholl, GTSC-7 Chairman
Status report from ITU-R WP 5A on ITS activities
GSC: Standardization Advancing Global Communications
Ca-US-ECC Consultation 2012
ECC actions on interference from 5 GHz RLAN into meteorological radars
SIG RFC 2019 Relevant Summary
Presentation transcript:

Development of CEPT and ITU deliverables Ralf Trautmann 6 th International Seminar on Spectrum Monitoring Kyiv, 10 – 12 July 2013

2 Structure International relations General considerations FM 22 – ECC Recommendations FM22 – ECC and CEPT Reports WG FM – ECC deliverables ITU-R WP 1C ITU-R SG 1 Consequent action Vorname Name | Veranstaltung | © Bundesnetzagentur

International relations National oranisation CEPT FM 22 Neigbours Other groups ITU WP 1C 3 Vorname Name | Veranstaltung | © Bundesnetzagentur

4 General considerations 1. Define your questions precisely, for example:  Which information is lacking so far?  How can I measure the maximum frequency deviation of FM broadcasting transmitters?  How can I measure GSM coverage? (Impossible!)  But: How can I verify the coverage predictions of GSM networks? 2. Elements of a solution  Do you have already a complete proposal? (You wish to share your knowledge with others)  Do you have at least some elements of a solution? Vorname Name | Veranstaltung | © Bundesnetzagentur

General considerations 3. May your problem/solution be relevant for other administrations too? 4. Is the subject of European or worlwide interest ? 5. Are there good reasons to start the discussion first in the ITU and later within the CEPT or vice versa? 6. Do you propose the development of a Report, of a Recommendation or both types of deliverables? 7. Which elements are absolutely essential for you? Is there room for compromises? 5 Vorname Name | Veranstaltung | © Bundesnetzagentur

General considerations Please bear in mind that there is a significant difference between a Recommendation and a Report. 1. Recommendations have a higher legal status and hence a higher commitment. 2. A Recommendation recommends, e.g. that the method described in Annex 2 should be used when the values of the deviation and modulation power are required. 3. A Report illustrates a method or a procedure. Example: The purpose of this Report is to provide guidance to administrations... The Annexes to this Report provide practical examples... 6 Vorname Name | Veranstaltung | © Bundesnetzagentur

General considerations Please don‘t formulate this way: The ITU Radiocommunication Assembly, considering d)that field-strength or pfd measurements of unwanted emissions, at locations distant from the transmitter, are recognized as the direct means of expressing the intensities of interfering signals due to such emissions; recommends 1that the maximum permissible levels of certain unwanted emissions defined at the output of transmitters may, under some circumstances, be applicable when the measurements are made in free space. 7 Vorname Name | Veranstaltung | © Bundesnetzagentur

FM 22 – ECC Recommendation  ECC Recommendations are measures that national Administrations are encouraged to apply.  They are principally intended as harmonisation measures for those matters where ECC Decisions are not yet relevant, or as guidance to national Administrations. 8 Vorname Name | Veranstaltung | © Bundesnetzagentur

FM 22 – ECC Recommendation  Input documents for FM 22 and other groups should be sent in due time before the meeting to the Secretary and to the Chairman.  Draft ECC Recommendation (yy)xx on Determination of the radiated power through field strength measurements in the frequency range from 400 MHz to 6000 MHz or  Working document towards a Draft New ECC Recommendation on Vorname Name | Veranstaltung | © Bundesnetzagentur

FM 22 – ECC Recommendation  Introduction of the document by the submitting administration  Discussion in the FM 22 plenary  Detailed discussion in a drafting group  Output of the drafting group is a TEMP document  Discussion of the TEMP document in the FM 22 plenary 10 Vorname Name | Veranstaltung | © Bundesnetzagentur

FM 22 – ECC Recommendation Possible decisions of FM 22:  a) The TEMP document will be annexed to the minutes of the meeting. Additional input for the next meeting is expected.  b) Same procedure as a). In addition, a correspondence group is installed to facilitate close co-operation between the meetings.  c) The document is considered to be stable. The TEMP document will be annexed to the minutes of the meeting and the Chairman will forward the document as an input document to the next WG FM meeting.  d) No further treatment of the subject. 11 Vorname Name | Veranstaltung | © Bundesnetzagentur

FM 22 – ECC and CEPT Reports  CEPT Reports are technical studies carried out by the ECC under mandates from the European Commission. These studies give results that are typically used as the technical basis of EC Decisions on spectrum policy matters. This case is normally not an issue in FM 22.  ECC Reports are the result of studies by the ECC. They are developed in support of ECC Decisions, ECC Recommendations or European Common Positions (ECPs) adopted on a voluntary basis by European countries at World Radiocommunication Conferences.  Treatment of Draft ECC Reports within FM 22 is the same procedure as for ECC Recommendations. 12 Vorname Name | Veranstaltung | © Bundesnetzagentur

FM 22 – ECC and CEPT Reports ECC Report 136 PRACTICAL CONSIDERATIONS REGARDING REMOTE MONITORING STATIONS, Kyiv, October 2009 EXECUTIVE SUMMARY This report provides practical experiences related to designing, establishing, operating, maintaining and decommissioning remote unmanned monitoring stations. The intention of this report is to share the knowledge gained by countries operating remote monitoring stations between themselves and also with countries that are in the process of building up a remote network. 13 Vorname Name | Veranstaltung | © Bundesnetzagentur

WG FM – ECC deliverables  Draft ECC Recommendations and Reports submitted by the relevant Project Team are discussed in WG FM in a similar way as described above.  A draft ECC Recommendation or ECC Report agreed by WG FM for Public Consultation shall be notified to Members by the Office using .  Public Consultation is carried out during a minimum period of six weeks. If needed, the duration of the public consultation can be extended.  WG FM shall consider the results of the Public Consultation when approving the draft Recommendation. 14 Vorname Name | Veranstaltung | © Bundesnetzagentur

WG FM – ECC deliverables  If no agreement can be reached, WG FM shall present the draft Recommendation to the Plenary together with the comments received. The Plenary shall decide on the approval of the Recommendation, preferably by consensus.  The final text of the ECC Recommendation shall be included as an annex to the Minutes of the meeting at which it is approved, published in the documentation area of the Office website and may be sent to ETSI. 15 Vorname Name | Veranstaltung | © Bundesnetzagentur

WG FM – ECC deliverables 16 Vorname Name | Veranstaltung | © Bundesnetzagentur

ITU-R WP 1C  The process in ITU-R Working Party 1C is very similar to the process in CEPT WG FM PT 22.  The first input document could be a Working Document towards a draft NeW Question.  QUESTION ITU-R 235/1 Spectrum monitoring evolution (2011) The ITU Radiocommunication Assembly, considering a)that spectrum monitoring is a key element of spectrum management; b)that radiocommunication technologies and systems are in a constant and rapid evolution; h); 17 Vorname Name | Veranstaltung | © Bundesnetzagentur

ITU-R WP 1C decides that the following Questions should be studied 1What are the new considerations for monitoring of radiocommunication systems that are based on new technologies? 2What are the new approaches that may be required in terms of organisation, procedures and equipment to monitor systems based on future radiocommunication technologies? 3What are the needs for administrations in order to implement the new approaches to monitor systems based on future radiocommunication technologies? further decides 1that the results of the above studies shall be included in (a) Recommendation(s) and/or (a) Report(s); 2that the above studies should be completed by Category: S3 18 Vorname Name | Veranstaltung | © Bundesnetzagentur

ITU-R WP 1C  Discussion of the input documents, improvements by Working Groups within the WP 1C meeting, TEMP Document to be attached to the Chairman‘s report, possibly installation of a Correspondence Group or Rapporteurs Group.  Probably not at the first meeting, approval of the Preliminary Draft New Recommendation ITU-R SM.[title] by the WP 1C plenary and submission as Preliminary Draft New Recommendation ITU-R SM.[title] to Study Group Vorname Name | Veranstaltung | © Bundesnetzagentur

ITU-R SG 1  Discussion of the input document, improvements by the WP 1C Chairman, TEMP Document.  There are different procedures applicable for the adoption and approval of a Draft Recommendation or Draft Revision of a Recommendation. Time can be saved by applying the procedure for simultaneous adoption and approval by correspondence.  Administrations are informed via Administrative Circular letters, e.g. CACE/ Vorname Name | Veranstaltung | © Bundesnetzagentur

Consequent action 21  Don‘t shut the deliverables away in the desk of the boss.  Make them available for all interested colleagues.  Cosider storing relevant deliverables on your server.  Transfer them in detailed, national work procedures in your own language! Vorname Name | Veranstaltung | © Bundesnetzagentur

References ECC, Framework, ECC Working Methods ECC, deliverables Radiocommunication, 22 Vorname Name | Veranstaltung | © Bundesnetzagentur

23 Questions and remarks? Ralf Trautmann Chairman CEPT FM PT22 and ITU-R WP 1C Vorname Name | Veranstaltung | © Bundesnetzagentur

27