Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doriana Guiducci, European Communications Office

Similar presentations


Presentation on theme: "Doriana Guiducci, European Communications Office"— Presentation transcript:

1 Doriana Guiducci, European Communications Office
Session 2 Role of World Radiocommunication Conference and European preparation for WRC Doriana Guiducci, European Communications Office 5th CEPT workshop on “European Spectrum Management and Numbering” ECO, 26 October 2017

2 Scope WRC and its role for European countries
CEPT CPG role in the WRC preparation process Status of the WRC-19 preparation Relationship with other activities in CEPT EU related activities (RSPG) CEPT workshop, 26th October 2017

3 World Radiocommunication Conferences (WRC)
WRCs are held every three to four years. WRC is reviewing, and, if necessary, revising the Radio Regulation (RR), the international treaty governing the use of the radio-frequency spectrum and the geostationary-satellite and non-geostationary-satellite orbits. Revisions of RR are made on the basis of an Agenda approved by ITU Council. Agenda for the following WRC takes into account recommendations made by previous WRC. Radio Regulations The Radio Regulations incorporates the decisions of the WRCs including all Appendices, Resolutions, Recommendations and ITU-R Recommendations incorporated by reference. WRC decides on a high level international framework which is afterwards implemented on a regional basis in all five regional organisations. CEPT workshop, 26th October 2017

4 WRC-19 Radiocommuncation Assembly +
World Radiocommunication Conference 2015 CEPT preparation for WRC - CPG Res. ITU-R 2-7 Res. ITU-R 4-7 WRC Agenda 1st CPM session Establishment of CPG PTs - allocation of the work ITU-R Study Groups SG Spectrum management SG Radiowave propagation SG Satellite Services SG Terrestrial Services SG Broadcasting Services SG Science Services Draft CPM Report to WRC 2017 CPG/CPG PTs contributions to ITU-R work / development of ECC views 2st CPM session CPM Report to WRC Final CEPT Positions – CEPT Briefs / European Common Proposals (ECPs) Contribution from membership WRC ECP Proposals from Member States 2019

5 Main Steps towards WRC-19
CEPT workshop, 24 October 2017

6 Conference Preparatory Group
CPG role within CEPT Charmanship of CPG CEPT partners in other regions (APT, ASMG, CITEL, ATU, RCC) ECO acting as a permanent point of contact between ECC/CPG and other regional organisations CEPT workshop, 26th October 2017

7 CPG main role and deliverables
Prepares European positions for ITU World Radiocommunication Conferences (WRCs) and Radiocommunication Assemblies (RAs) Develops common positions in respect of ITU-R meetings, in particular for the Conference Preparatory Meeting (CPM) (to prepare WRCs) Develop and agree European Common Proposals (ECPs) for the work of WRCs and RAs Prepare and approve Briefs (position documents) to present the European positions at WRCs and RAs CEPT workshop, 26th October 2017

8 CPG-19 Structure

9 Chapters of the draft CPM Report to WRC-19
Chapter 1: Land mobile and fixed services Chapter 2: Broadband applications in the mobile service Chapter 3: Satellite services Chapter 4: Science services Chapter 5: Maritime, aeronautical and amateur services Chapter 6: General issues CEPT workshop, 26th October 2017

10 WRC-19 Agenda from CEPT perspective (1/3)
Land mobile and fixed services new transport systems (harmonised bands for railways, intelligent transport systems) identification for land mobile and fixed service applications in GHz High-altitude Platform Stations (HAPS), including spectrum needs and spectrum sharing Broadband applications in the mobile service: IMT above 6 GHz issue (regarded as 5G) focussing on specific frequency bands not including bands around 6-20 GHz and GHz, RLAN in the frequency range between MHz and MHz, also considering mitigation techniques. CEPT workshop, 26th October 2017

11 WRC-19 Agenda from CEPT perspective (2/3)
Satellite issues: ESIM (earth stations in motion communicating with geostationary space stations in the FSS) in the bands 17.7‑19.7 GHz (space-to-Earth) and  GHz (Earth-to-space), Broadcasting Satellite Service (BSS)/Fixed Satellite Service (FSS) at 12 GHz, Regulation for Non-Geostationary Satellite Orbits (non-GSO) Fixed Satellite Service in the range from 37.5 to 51.4 GHz Satellite regulatory issues CEPT workshop, 26th October 2017

12 WRC-19 Agenda from CEPT perspective (3/3)
Science services: Meterological Satellite service allocation at MHz, Frequency requirements for the ‘short duration missions’ (nano-pico satellites). Maritime, aeronautical and amateur services: Modernisation of Global Maritime Distress and Safety System (GMDSS), Global Aeronautical Distress and Safety System (GADSS) needs Allocation to amateur service in MHz in Region 1 In total, 16 specific agenda items for WRC-19 + permanent items. CEPT workshop, 26th October 2017

13 EU related activities (RSPG)
Early common policy objectives with the interim Opinion on common policy objectives for WRC-19 from February 2017 which identified: 6 Agenda Items related to EU policies: 1 AI with relation to specific EU harmonisation measures: Work in progress on unified objectives for EU members, aligning work with WRC preparation: Final Opinion expected in Q after public consultation Electronic communications connectivity Space Transport Science Single Market Security and Defense RLAN 5 GHz CEPT workshop, 26th October 2017

14 Useful links for the WRC-19 preparation in CEPT
General information: CPG page: Questions/Answers regarding CPG: ECC PT1 page: Coordinators: CEPT Briefs/ECPs: CPG Meeting Schedule:

15 THANKS FOR YOUR ATTENTION


Download ppt "Doriana Guiducci, European Communications Office"

Similar presentations


Ads by Google