WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.

Slides:



Advertisements
Similar presentations
Eija TuominenHIP Detector Laboratory October Helsinki Institute of Physics DETECTOR LABORATORY National infrastructure to support Finnish research.
Advertisements

Electrical and thermal testing at Glasgow and Liverpool.
ATLAS Module building at Glasgow
Wire Bonding Quality Issues
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Mechanical Risks to Tracking Detector Bond Wires A. Honma, CERN PH/DT  Brief intro to wire bonding  Physical contact damage  Vibration and shock from.
Personal reflections, Belgrade, November 30,2009 Markus Nordberg, CERN/ATLAS.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Quality Assurance and Reliability of Silicon Trackers A. Honma, CERN PH/DT 3 June 2013A. Honma, 2013 Talent Summer School1  Quality Assurance and Reliability.
A. Honma, CERN  Module production: definitions, scope  Industrialization: What do we mean?  Possibilities for automation and outsourcing  Automation.
Some real-life experiences that highlight the importance of quality and reliability issues for CERN projects A. Honma, CERN PH/DT 4 July 2013A. Honma,
Detector and Front-end Electronics Issues: Qualification and Reliability Testing A. Honma, CERN PH/DT 23 November 2010ESE Seminar1  Introduction  Qualification.
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
P3MD Labs Introduction to the facilities of the Purdue Experimental Particle Physics research groups.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Paul Scherrer Institut
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
ALICE Silicon Strip Detector Module Assembly with Single-Point TAB Interconnections 1) Introduction 2) Collaboration 3) ALICE SSD module 4) Assembly phases.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
The Quality Assurance and Reliability Testing (QART) Lab at CERN A. Honma, CERN PH/DT 26 April 2010CMS Upgrade Meeting, A. Honma1  Purpose of Lab  Lab.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
1 W-band Module Production and Other Fermilab Contributions Proposed Significant Partnership in QUIET-II to the Fermilab PAC in November 2009 Modest Fermilab.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
PHENIX upgrade possibilities in Finland Detector Laboratory/Helsinki JYFL/Jyväskylä 1) Organisation 2) Detector Laboratory premises & equipment 3) Silicon.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Thesis: Introduction Study for a failsafe trigger generation system for the Large Hadron Collider beam dump kicker magnets prepared by Martin Rampl.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Work Package 1: Pixel detector systems for particle.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
By ASST. Prof. DR. ASEEL BASIM
Detector building Notes of our discussion
HV/HR CMOS in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Huffman, Jaya John, Nickerson, Placket, Shipsey, Vigani.
Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey.
LHC Science Goals & Objectives
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
CMS gas systems meeting
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
BOND/QART Lab and Pixel R&D
Target and Horn status report
Sidet Facilities A snap shot of space and equipment at Sidet and their current use Projected future uses and upgrades Hogan Nguyen, Fermilab May 22nd 2007.
J. Seeman Assistant Director for PPA/LCLS
HL-LHC upgrade at IPHC news
Setup for testing LHCb Inner Tracker Modules
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources  Equipment  Achievements  Current Activities  2010 Plan, ? Outline

Mandate Original WP6: Interconnect Technology and QA (for LHC silicon detector upgrades). Reliability Testing added as an essential QA component owing to lack of accessibility and long expected life times of detectors and electronics. Common QA lessons learned from LHC silicon detector construction should be documented to avoid mistakes in the LHC detector upgrades. Provide library of resources for QA  planning and procedures as pertains to silicon detectors (pixel or strip sensors, FE electronics, module design and production). Provide infrastructure (test equipment) and expertise (trained personnel) to apply QA and Reliability Testing for the upgrade R&D and construction phases. QART lab created for this task. Incorporated into DSF/Bondlab premises. QART Website: 30 April 2010DT Steering Board Meeting, A. Honma2

30 April 2010DT Steering Board Meeting, A. Honma3 Manpower and Resources WP6 Funding in KCHF * = PJAS paid from project budget

Equipment (QART + Bond Labs) 1.Climatic chamber (large volume, fast temp. cycling with humidity control) 2.Thermal cycling chamber (small volume, med. speed, no humidity control) 3.Vibration tester (mono-axial shaker can deliver 10G’s to 10Kg payload) 4.5KHz stroboscope (for vibration analysis) 5.Small aperture permanent magnet with B=0.7T for high mag field studies, 2T electromagnet on order 6.Infra-red thermal imaging video camera 30 April 2010DT Steering Board Meeting, A. Honma4 NEW equipment in magenta (< 2yrs old)

Equipment (QART + Bond Labs) 7.Glue dispensing robot for wire bond encapsulation 8.Die shear tester / bond wire pull tester 9.2 Delvotec 6400 ultrasonic wedge wire bonding machines 10.Die bonder with heated chuck (primarily for gluing chips) 11.High magnification stereo-microscope on probe station with video camera 12.Numerous medium magnification inspection stereo-microscopes 30 April 2010DT Steering Board Meeting, A. Honma5 NEW equipment in magenta (< 2yrs old)

Achievements Commissioning and routine operation of new climatic chamber. Thermal cycling tests performed for: Front-end electronic (CMS, TOTEM, ALICE), standard PCBs (LHC QPS system, CMS), silicon sensors and chips (Medipix). Accelerated aging studies performed on PCBs and wire bonds (corrosion, metal migration, oxidation). Humidity studies made for corrosion and surface charge effects. IR camera commissioned and initial study of silicon sensor hot spots performed. Camera used for thermal studies by users. Small test set-up for studying bond wire damage in strong magnet fields produced quickly and at minimal cost. Successfully demonstrated wire vibration and showed agreement with FEA calculations. Presentations to all 4 major LHC experiment upgrade groups made to inform them of the lab. Web site is on-line, showing QART lab resources and capabilities. 30 April 2010DT Steering Board Meeting, A. Honma6

Current activities All envisaged major equipment acquisitions have been completed. However, commissioning and operational training still in progress for some. Ongoing activities: Thermal cycling tests, humidity testing, cold testing as requested by clients. Additional infrastructure improvements (sound-proofing, DI water supply) needed. Commissioning of vibration test system and vibration recording device in progress. Additional infrastructure for this system (separate sound proof room) needed. Studies of bond wire damage in magnet fields in progress. 2T laboratory electromagnet ordered (0.7T permanent magnet for now). Web site continually updated with current state of lab and more QART resources. Advice and aid for QA issues in many projects. Usually bonding related but some for test jig and module design as well as RT issues. 30 April 2010DT Steering Board Meeting, A. Honma7

30 April 2010DT Steering Board Meeting, A. Honma8 Example study: Wire Bond Breakage Motivation: CDF silicon strip detector had broken bond wires from vibration owing to AC current at resonant frequency of wires (10-30KHz) in high B field (1.4T). Resonant oscillation on bond wire of 3.5mm length found at 6.3 KHz. In agreement with FEA calculations We were able to demonstrate the resonant effect with a simple test set-up (0.7T permanent dipole magnet, frequency generator, stroboscope). In addition, we can predict with good accuracy the resonant modes with an ANSYS model. ATLAS has published an analysis for at-risk bonds in ATLAS silicon detectors. But no known systematic study of effects of wire loop properties and bonding quality on breakage risk. Try to quantify more generally these risks. Measured vs Predicted resonant frequency (primary mode) as function of wire length Measured vs Predicted resonant frequency (primary mode) as function of wire length

2010 Plan, outlook Fully commission and be capable of running quality/reliability tests on all equipment. Assist clients in determining and performing appropriate reliability tests. Provide advice on QA planning and application to silicon detector R&D and construction. Continue developing resource and experience on-line library concerning quality assurance for silicon detector projects. Hold Workshop on QA experience from LHC silicon detectors construction, commissioning and operation. In addition, invite contributions from any recent silicon detectors in HEP. Goal: late April 2010DT Steering Board Meeting, A. Honma9 And for ??  Future depends on usage by user community.  Delay of LHC schedule  delay of detector upgrades  delay of lab usage.  Hence opening facility to a larger community.  WP6 funding will stop at the end of this year.  QART lab to become part of the DSF run by DT(?)  Anticipated QART lab manpower requirement: 2 FTE.