THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.

Slides:



Advertisements
Similar presentations
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Advertisements

The University of Priština, temporary settled in Kosovska Mitrovica (UPKM) Danijela Kulić, assistant lecturer, Faculty of Philosophy Nemanja Vasić, assistant.
Advanced Technology Environmental and Energy Center ATEEC Resource Center Grant Overview April 2013.
CTE Credential Program For IHE and District Representatives Meetings held March & April 2010.
Were attended by 12,800 individuals in the past year.
1 Presented by Media Services Media Specialists Connections and Issues Training: November – December Zone Based Meetings.
Empowering Staff Through Institute Planning (ESTIP) Executive Workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
Enhancement Request Process Improvements Update
 Please sign in.  You must register for the course to receive PAC.  PAC is valuable for advancing on the salary schedule.
Communication strategy and techniques to launch InnovMed Dr. Fatma H. Sayed Vienna meeting 25 June 2007.
ONS Congress 09 - the 34 th Annual Congress Jeanne Held-Warmkessel, MSN, RN, AOCN ®, ACNS-BC Congress 2009 team leader.
Co-funded by the European Union "This project has been funded with support from the European Commission. This publication reflects the views only of the.
DRAFT – Not for Circulation Investing in Innovation (i3) 2012 Development Competition Summary Document February 2012 Note: These slides are intended as.
PROFESSIONAL DEVELOPMENT PLAN WORKSHOP. What is the Professional Development Plan? The Professional Development Plan is a directed planning and evaluation.
Achieving the Dream Status Report Mentor Visit February 5-6, 2009.
Essential SNA Project being developed from 2011 to 2013.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
1 Department of Medical Assistance Services Stakeholder Advisory Committee June 25, 2014 Gerald A. Craver, PhD
American Community Survey (ACS) Program Review Webinar March 6, 2012.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
A Study on Environmental Standards and Their Trade Impact on Indian Textiles & Clothing Industry (SESTI) PROSAIG Project Advisory Committee Meeting 8 th.
Getting Started With Your ATE Evaluation ATE PI Conference October 24, 2012 This material is based upon work supported by the National Science Foundation.
EU BON Meeting, Joensuu, March 2015 WP2 Task 2.3: Data sharing tools – Action Point MS232 : Technical workshop, review of documents, test versions of data.
Take Charge of Change MASBO Strategic Roadmap Update November 15th, 2013.
April 10, A year of mentoring required to move from the initial to the professional license: Initial teaching Initial school specialist Initial.
Serve the Professional, Advance the Profession SHRM Student Member Benefits Presented by SHRM Student Programs Updated April 2007.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
MARGINS Successor Education Planning Workshop Workshop Goals: Review and evaluate impact and effectiveness of existing MARGINS education programs Develop.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
Welcome! Course Development Camp Session II July 16 July July
Documenting Completion of your PDP
A STUDENT’S GUIDE ACCREDITATION WHAT IS ACCREDITATION? The process by which a college is certified by a regional accrediting agency, such as the.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
Accelerator Safety Workshop SLAC Scott L. Davis Accelerator Safety Program Manager – SC Office of Science, U.S. Department of Energy Summary and.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Preliminary Highlights of the Past Year from the External Evaluators Prepared by The Sheinkopf Group April, 2015.
Health and Food Safety EU strategy for Pharmaceuticals in the Environment Patrizia Tosetti DG SANTE European Commission China/EU Pharmaceutical Industry.
A Framework for Assessing Needs Across Multiple States, Stakeholders, and Topic Areas Stephanie Wilkerson & Mary Styers REL Appalachia American Evaluation.
THE 2016 CACREP STANDARDS REVISION PROCESS LAST CALL FOR FEEDBACK.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Dynamics SL Annual User Conference San Diego, September 18-20, 2013 Slide 1 Planning Your Dynamics SL User Group Conference Presentation.
Kick Off Meeting Largs, Scotland
United Nations Statistics Division
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
Orientation Thursday, October 20 Washington Elementary
Year One: Project implementation overview
Working in Groups in Canvas
Why Accessibility Profession Matters IAAP UK Chapter
360o Feedback Report Post-Training After-Session Actions
Strategic Enrolment Management Planning OVERVIEW
Overview of the FEPAC Accreditation Process
Your Title Here SWE HQ Please use this template for your presentation and include each slide shown throughout.
21st Century Learning Environments Phase 1 Professional Development
HRA User Satisfaction Report
AACRAO Update.
End of Fieldwork Debriefing
Mark S. Orloff, MD Regional Councillor
Accreditation 2016 A student’s guide.
Marianne Wehby Skills Engagement Executive
Steering Group Meeting
Elizabeth A. Pomfret, MD, PhD Regional Councillor
Region 8 Meeting Harvey Solomon, MD
Marianne Wehby Skills Engagement Executive
United Nations Statistics Division
A Quick Carl D. Perkins Act Update
Next Steps on the §309 Regional Technical Support Document April 2003
Lunar Calibration Workshop Status of the preparation
New Special Education Teacher Webinar Series
Presentation transcript:

THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE

Prepared for the ATEEC National Visiting Committee by The Sheinkopf Group March, 2014 Note: This presentation has been prepared with more than three months remaining in this year’s program. There is still a great deal of information being collected that will be used in our evaluation due June 30, However, here is an overview of the report contents and some of the accomplishments to date.

This report looks at the impact of the current ATEEC programs and activities on educators, students, and other audiences involved in energy and environmental education around the United States. The following information is being provided to the National Visiting Committee today to highlight some of the accomplishments during the first nine months of this year’s program. The final report will include more complete information on each activity.

I. Project Goals, Objectives, Deliverables, and Activities Objective 1: Provide support and mentoring for institutions that wish to start or improve educational programs in environmental science and sustainable energy technologies. Activity 1: Revise the Best Practices manual. This has been an ongoing activity, and the report is now complete.

Activity 2: Provide professional development activities on the ATEEC Resource Center website. Two water-related webinars were held this year: “Water Considerations and Project Management” (November 21, 2013) and “Defining Water Management.” (December 4, 2013). The recordings of each webinar along with a summary of the programs and other information are posted on the web site.

Objective 2: Provide mentor services to ATE projects. Objective 3: Establish and support additional industry, business, academic partnerships. At this time, plans have been finalized for the Defining Environmental Technology Forum in Chicago set for last week. It is estimated that 20 people would be attending. As already noted, a Defining Water Management webinar has been held. Full information and a recording of the webinar are posted on the ATEEC web site.

In addition, the “Defining Water Management” report and careers chart are now available on the ATEEC web site. Activity 2: Revise Technology and Environmental Decision- making educational modules.

Objective 4: Promote technician careers, visibility and the public image of environmental and sustainable energy technology. Activity 1: Create interactive Defining Energy Technologies and Services, Defining Water Technologies and Services, and Defining Environmental Technologies and Services websites for high school career counselors or students. These websites are planned to be functional by this meeting.

Activity 2: Revise the national directory of traditional and online environmental and energy technology programs. This is an ongoing activity that is done on a regular basis during the year.

Objective 5: Address technician knowledge, skills and competencies needed for the evolving, converging and emerging technical workplace. Activity 1: Conduct DACUMs at NSF ATE Project college sites. A great deal of activity on DACUMs has taken place this year. ATEEC is presently scheduled to hold five DACUMs each year though there appears to be a need for more of them. Charts on the ATEEC web site link to resources. Because of the importance of this activity, we anticipate that this will be a large section in this year’s report. We have extensive information on the workshops, including their outcomes and surveys of all participants.

Activity 2: Conduct two PETE regional conferences during each project year to address technician knowledge, skills and competencies in the workplace. PETE has sent us information on one conference that was conducted so far this year. It was held in Tacoma, WA, in July. Full information and evaluations have been received and will be included. A second one was planned for March 18 – 20 in Kansas and we are waiting for information on the program. Their programs continue to be very well received by the attendees and evaluations are very strong.

Activity 3: Expand the Resource Center scope beyond environmental and energy educators to include technician educators in other career fields that require knowledge of environmental and energy technology.

Objective 6: Screen, validate, update, and broadly distribute exemplary materials, curricula and pedagogical practices adapted for designed by ATE centers and projects and other sources.

Activity 1: Update the ATEEC Resource Center website. Work is underway on developing the new platform for the water technologies and services chart. A new water programs database has been added to the ATEEC web site. An ongoing activity is updating the online map of environmental and energy programs around the country. Information on water has been added to this map.

Activity 2: Update the eERL website. ATEEC continues to update this site on an ongoing basis. Vetters have been selected for the products on the site and a new vetting web site has been developed for the reviewers and the project manager. ATEEC plans to have 20 resources vetted each month and the resources that make it through the process will be uploaded for dissemination. There is now a new contractor working on this site. The site has been redesigned and is online at

II. Other Current ATEEC Activities 1.The ATEEC website * We surveyed users of the ATEEC website between July 1, 2013, and November 1, 2013, and have obtained feedback from some of them. * Surveys were sent this week to the people who visited the site between November 1, 2013, and March 15, 2014.

2. Survey of the National Visiting Committee A survey has been developed and will be sent again this year to committee members to obtain feedback on the current programs and to identify new projects and activities that will further help ATEEC meet the program’s objectives. You will receive the survey by next week. Please take a few minutes to provide us with your comments and ideas.

III. Summary Because this new contract runs through July 1 each year, it is too early to compile and report on all the completed activities (the former contract ran through April 1). A great deal of information is being collected between now and May 30 so that a draft can be sent to ATEEC for review by early June. That allows them time to review a draft of the document, make edits and additions, and give us time to submit the final document by June 30. Our preliminary thoughts? It’s been another great year for ATEEC!