Presentation is loading. Please wait.

Presentation is loading. Please wait.

Next Steps on the §309 Regional Technical Support Document April 2003

Similar presentations


Presentation on theme: "Next Steps on the §309 Regional Technical Support Document April 2003"— Presentation transcript:

1 Next Steps on the §309 Regional Technical Support Document April 2003

2 Next Steps on the Regional TSD
Finish Modeling for SIP/TIP preparation §309 Control Strategies with Fire constant (Scenario 1) §309 Control Strategies with Enhanced Smoke Management programs (Scenario 2) Complete Regional Technical Support Document Provide documentation for preparation of §309 plans Align technical documentation with needs of STIP2 project Report technical results for regional haze analyses conducted by WRAP to date

3 Next Steps on the Regional TSD
Schedule: February TSD Workshop 50+ attendees, reviewed work completed to date March - Complete §309 modeling April - Complete external review draft of TSD Early May 2003: Publish external review draft of TSD Gather comments during May

4 Next Steps on the Regional TSD
Schedule, continued: June 2003: Compile external review comments Final document editing ~ July 1, 2003: Publish TSD in Adobe Acrobat format On WRAP website with direct links to technical memos and contractor reports On CD for states, tribes, and interested parties


Download ppt "Next Steps on the §309 Regional Technical Support Document April 2003"

Similar presentations


Ads by Google