ASN Implementation Package

Slides:



Advertisements
Similar presentations
specifically designed for Manufacturers and Distributors
Advertisements

Confidential Information Summa Technology Group, Inc. EC Outlook Order Management Application for Carestream Health Vendor Integration Option February.
1/23/2014 Transportation Software At Its Best! Aljex Logistics.
Credit Card Processing in SAP
Smart Connect – Supplier Portal Training Module 3 – Creation of Advance Shipment Notification.
Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Exchange Product Overview Secure Transmission for Transaction-based Documents.
EUCLID Student Award Processing Preview Demonstrations Student Systems Presented by Matthew Taylor Student Systems.
 Corporate Profile  BOSS Overview  Current Solutions  BOSS Modules  COLORS - New BOSS Web Module  BOSS Benefits  Supplier XML Services and BOSS.
<<replace with Customer Logo>>
Smart Connect – Supplier Portal Training Module 2 – Creation of Service Confirmation.
11 ASN (RNET 3B2) Implementation Package Saufi Bukhari Systems Analyst June 20, 2012.
Ben McCormickPhil Joseph Copyright © 2009 Catavolt, Inc. All rights reserved.
Intel’s Utilization of SAP*s Carrier Cockpit (XSI)
EDI Future Environment Initiative Project Kickoff 12/15/2004 Corporate Information Technology.
Avnet Company Confidential Lean Product Fulfillment (LPF) Proposal Overview September 25, 2007.
©2009 HP Confidential TUNGSTEN NETWORK AND PAPER INVOICING.
ISupplier Portal September iSupplier Portal Purpose Benefits Login Navigation Viewing Information Advance Shipment Notices Preferences.
Experts in e xtending Oracle e -Business Suite e nrich IT 1/16/2004VMI1 Vendor Managed Inventory (VMI) Presenter: Arul Murugan, CPIM.
Confidential Page 1 Oracle Internet Supplier Portal Oracle Internet Supplier Portal (iSupplier Portal, ISP) enables secure, self-service business transactions.
ISupplier P2P business process Supplier.
41-02: Advance Ship Notices Supply Chain Platform Training Presentation Updated September 2011.
Advance Ship Notices Training Presentation for Supply Chain Platform: BAE Systems July 2012.
Smart Connect – Supplier Portal Training Module 1 – System Overview.
QAD Distributed Order Management
CISTECH, Inc The XA Experts March 2, 2010 STREAMLINED PROCURE TO PAY (P2P) PROCESSING FOR XA Denise Luther Senior Technical Consultant CISTECH, Inc.
Leveraging JDA technology to support a Shelf Connected Supply Chain Amy Higgins VP, Space Management & Analytics Sears Holdings Corporation 1.
IntelliTrack ® WMS An Overview and Approach Powerful, Full Featured, Affordable.
Final Project A case study of The Real-Time Supply Chain System in Company I Group 2 Members: Angela Ivan Jimmy.
1. 2 >> Supply Chain Solutions that Deliver UTi Worldwide Inc. uOrder.
Model Bank Testing Accelerators “Ready-to-use” test scenarios to reduce effort, time and money.
Lean Procure to Pay David Kemp Senior Consultant
David Kemp  …can be inefficient ◦ Their systems may be manual ◦ Our orders may be lost in the swamp ◦ They get back.
2014 Reliance Manufacturers Rep Meeting AGENDA: Customer Relations Overview Manufacturers Rep Expectations Overview Quarterly Review Discussion Commission.
Purchasing Director’s Meeting MFMP 2.0 Upgrade Status February 15, 2007.
Onboarding: Enable Success or Failure Lindsay Dick Director of Sales.
New NOTIFIER Buyer SAP Based e-commerce
©2004 Deloitte Drop Shipment and Back to Back Order Processes in Oracle 11i July 19, 2004.
Mail Acceptance and Induction Seamless Mailing with Intelligent Mail Barcodes Debbie A. Cooper Quebecor World Logistics.
Prepared by SRA International, Inc. Confidential April Web-Based Supply Chain Management IFAC Conference – PVO/Freight Forwarders.
RSS Inventory Tracking System (RITS) Update February 23, 2005.
Screening and Selecting Software. HRIS Project Phases NeedsAnalysis Design & Development Implementation & Maintenance.
CISTECH, Inc.  220 N Ames Street, Matthews, NC   1 Supplier Portal Enabling Lean Procure to Pay David Kemp Mike Taylor.
September Interface Kickoff Sunflower Project Statewide Management and Reporting Tool Update September 02, 2009.
] Orange County Convention Center Orlando, Florida | May 15-18, 2011 Procure to Pay – Using SAP and SharePoint Jon Ross – Shure Inc. Jay Westberg – Dickinson.
Phil Joseph Copyright © 2009 Catavolt, Inc. All rights reserved.
Eric Wagner Mike Taylor Phil Joseph Copyright © 2009 Catavolt, Inc. All rights reserved.
HP PPM Center release 8 Helping IT answer the tough questions
1 Program Release 2008 Update to the Administrative Council August 9, 2007.
The information contained in this document is highly confidential and privileged. No part of this document may be copied or circulated without express.
What is eMarketplace? Web Storefront Buyers Suppliers eMarketplace
2015 NetSymm Overview NETSYMM OVERVIEW December
Collaborative Planning Training. Agenda  Collaboration Overview  Setting up Collaborative Planning  User Setups  Collaborative Planning and Forecasting.
Integrated Logistics Scenarios April 15, Integrated Logistics Scenarios 2005 RosettaNet. All Rights Reserved. Synergy of Integrated Standards.
© 2006 Oracle Corporation – Proprietary and Confidential Capture & Manage Services Spend Efficiently Extend Services Spend Programs Across Globally Improve.
Advanced Planning Update
ENTERPRISE DATA QUALITY (EDQ) – Vendor Portal EDQ Vendor Portal is an on-line web application hosted on the vendor extranet. The EDQ Vendor Portal enables.
Invoices Training Presentation for Supply Chain Platform: BAE Systems May 2015.
As a part of the ongoing implementation of our corporate Strategic Plan, specifically Strategic Objective #1 of “Implementing an enabling business system.
Microsoft Dynamics Sure Step Rana Abdul Rahman. What we will cover What is Sure Step? Benefits of Sure Step methodology Project phases as per sure step.
ECommerce EDI Toolkit Version September What is EDI? EDI stands for Electronic Data Interchange EDI is the electronic exchange of business data.
Log into WAWF, DoD single face to industry for submitting invoices, as normal.
CISTECH Supplier Web Portal
Electronic Data Interchange (EDI)
Supplier Portal Self-Registration
Texas Instruments Supplier Portal- Web Invoice Overview
SM KM Consignment Model
Supply Chain Visibility Solution powered by
Smart Connect – Supplier Portal Training
Presentation transcript:

ASN Implementation Package RosettaNet PIP 3B2

Inbound Freight Visibility Key Challenge Improve visibility of inbound freight spends and support continued capability development to optimize the inbound freight supply chain. Current State Key Gap Foundational data to get specific PO line shipments linked to freight invoice information.

Project’s Benefits Supplier Benefits B2B: Direct connection to Intel, no translation errors Web: Auto-population of key information, minimized manual data entry Overall: Reduction of status updates to Intel. Tracking enabled via BOL/HAWB identification Overall: Quicker processing of shipment information, improved payment possibilities Note: Many Intel suppliers confirm usefulness of ASN transaction for improving supply chain success Intel Benefits B2B/Web: Direct connection and linkage to other Intel supply chain systems, minimized data quality (DQ) issues Overall: Advanced notification of shipment to prepare lane/receiving for shipments..reduced cycle time Overall: Enables systematic tracking vs time consuming phone conversation or tracking spreadsheets Overall: Enables proactive identification of shipping issues

Supplier Roles and Responsibilities Business Representative Arrange resource(s) from supplier side Make business decision IT (Systems Analyst) Responsible to configure test environment Execute B2B testing with Intel to test the functionality of new implementation/changes Troubleshoot and propose solutions during testing phases Developer / Programmer Perform development based on Intel specifications User Process the PO (from Intel) and create ASN to be triggered to Intel

ASN Scope Supplier Intel 3B2 Physical shipment 3B2 Advanced Shipment Notification Physical shipment Note: ASN needs to be sent within +/- 4 Hours from actual shipment from supplier’s Dock Only one PO# to reference per ASN ShippingContainer structure can loop multiple times, ShippingContainerItem can loop multiple times within the same ShippingContainer. Within one ShippingContainerItem, there can only be one PO#, one PO Line#, and one Lot# referenced

Business Requirements PO # and PO Line # Part Number Vendor ID Tracking Information – HAWB / MAWB / BOL Ship Date and Arrival Date Weight Shipped Quantity Packing Slip # or Shipment #

New 3B2 Implementation For existing supplier with other RNET PIPs (without 3B2 ready): Approximately 12 weeks to complete Initial Business Engagement (2 weeks) Development (2 weeks) L1 Testing – connectivity (2 weeks) L2 Testing – syntax checking (2-3 weeks) L3 Testing – system testing (4-6 weeks) UAT – user acceptance testing (1-2 weeks)

Phase Details Initial Business Engagement: 2 weeks Hold Pre-Kickoff meeting with Commodity Team/Supplier/Data Quality Verify Business model and Supplier Infrastructure Hold Kick-Off meeting with Commodity Team/Supplier Gain agreement/buy-in from team on Intel proposal and/or Supplier plan Communicate changes, training , schedule etc. Development: 1-2 weeks Engage with supplier to review the requirement and mapping, propose solution, and commit timeline Gather information to be setup (especially for new implementation) Prepare test data L1 testing: 2 weeks Configure test environment Firewall configuration (if required) Middleware configuration (if required) Back-end system configuration (if required) Connectivity test (firewall to firewall)

Phase Details L2 Testing: 2-3 weeks L3 Testing: 4-6 weeks Syntax check (middleware to middleware) Ensure the 3B2 format satisfies Intel’s mapping and specifications L3 Testing: 4-6 weeks System test (end to end) Ensure the 3B2 is processed successfully by back-end system (SAP) Buyer to create PO’s for CONS for testing (Biz) User Acceptance Testing (UAT): 1-2 weeks End to end test with user involvement (CM/Supplier) Ensure the 3B2 is processed successfully with user involvement Go-live After completing the test Deploy new changes or implementation in production environment Business need to drive the deployment Stabilization period (1 week) will take place to ensure the B2B transaction is working fine

Backup

3B2 Message Guidelines 3B2 V01.01 Message Guidelines

3B2 Sample XML 3B2 V01.01 Sample XML 3B2 V11.01 Sample XML

Intel TP Information Template Intel Trading Partner Information Template with the list of complete IP addresses

Backup Solution – WEB ASN If trading partner do not have RNET capability, we offer WEB ASN solution