Production and Testing Status V. Fisch, T. Kiss, T. Tölyhi, V. Veszprémi BPIX Supply Tube Electronic Boards.

Slides:



Advertisements
Similar presentations
1 Designing for DVI General Applications Considerations.
Advertisements

JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
1 Integration issues of FPCCD VTX Yasuhiro Sugimoto May 22,
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
Lecture 8: Clock Distribution, PLL & DLL
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
MB4 New compared with MB3: Digital drivers / transformer drivers options 14 OPAMPS instead of 4 Thinner coaxial cables Shorter umbilical Heater coil integrated.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Layout of the Power Distribution on Support Tube for Phase I Lutz Feld, Waclaw Karpinski, Katja Klein, Jan Sammet, Michael Wlochal.
Layout Considerations of Non-Isolated Switching Mode Power Supply
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The printed circuit board (PCB) design
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Bologna, 10/04/2003 Workshop on LHC Physics with High P t Muon in CMS R.Travaglini – INFN Bologna Status of Trigger Server electronics Trigger boards TB.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
The Chicago Half of Champ
Design studies of a low power serial data link for a possible upgrade of the CMS pixel detector Beat Meier, Paul Scherrer Institut PSI TWEPP 2008.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Status of NA62 straw electronics Webs Covers Services Readout.
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Agata Week – LNL 14 November 2007 LLP ATCA Carrier Status M. Bellato on behalf of the LLP Carrier Working Group.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
TPC electronics Status, Plans, Needs Marcus Larwill April
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
The printed circuit board (PCB) design §PCB design is part of the design process of a product in electronics industry. §PCB is a piece of insulating plastic.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
Development of T3Maps adapter boards
CCS Hardware Test and Commissioning Plan
Analog FE circuitry simulation
T1 Electronic status Conclusions Electronics Cards:
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Meeting on Services and Power Supplies
HPS Motherboard Electronic Design
Test Slab Status CALICE ECAL test slab: what is it all about?
Overview of T1 detector T1 is composed by 2 arms
Test Bench for Serdes Radiation Qualification
RPC FEE The discriminator boards TDC boards Cost schedule.
Presentation transcript:

Production and Testing Status V. Fisch, T. Kiss, T. Tölyhi, V. Veszprémi BPIX Supply Tube Electronic Boards

 The followin PCB of Slot 1 are already produced  POH Motherboard (POH-MB)  DOH Motherboard (DOH-MB)  Aadapter Board (AB) L1&L2, AB L3&L4  4 sets (4 pcs /each): Budapest, Aachen, Zürich, CERN.  Connector Boards production stil have an issue  Changed company two times  Only CB L3 and L4 have been submitted now to Exception PCB  Now Eception PCB is looking for a right production plant or partner to be involved  Alternative solution would be a fully polyimid board with exactly the same thickness.  Flex cables are designed will be produced at Würth Elektronik  We waited for the Adapter Boards the precise length verification  have to be ready together with the CBs Status of the Prototypes

DOH-MB, DOH-MB, DOH, and POHs mounted together

Testing of the Prototypes

DOH Motherboard AB L1&L2 - bottom AB L1&L2 - top DOH-MB v1.2

 4 DOH-MB have been produced  At the time of testing we had not had the POH-MB poduced yet  The DOH-MB boards were first tested in themselves, powered up w/o the POH-MB  For all 4 DOH-MB (8 fast I 2 C channels) we have the following test results  Bringing up the boards  No shorts, power consumption are the same for all boards  Configuring of the ASICs (throgh the slow I 2 C chain)  We can access the two ASICs (PLL, DELAY25)  both ASICs respond with ACK,  we can enable/disable the DELAY25 outputs  we can set the delay values  Later these tests were repeated with a POH-MB as a carrier: voltage supply and I 2 C configuration are still OK Test Results of DOH-MB

 Functional tests  The DOH-MB PLL locks to a 40 MHz input bit stream with embedded trigger bits (TTC) generated by an FPGA board.  we have the decoded clock (CLK) at the DOH-MB output,  we have the decoded trigger (CTR) pulses at the DOH-MB output,  we have the fast I2C data (SDA) at the DOH-MB output, and we also have the regenerated clock for the return data (RCK) at the mDOH input.  Summary  No PCB or assembly issue  We would like to keep 2 pcs for further testing – see next slide  1 board to Zürich, 1 board to Aachen (if needed) Test Results of DOH-MB

 The following tests have not been carried out yet  Testing the signal integrity of the fast I2C signals through the entire signal chain (from DOH-MB – flex cable - AB – CB)  For L3&L4: two PCB routing options (selectable by jumper resitors) can be tested  Single long chain for L3 & L4 with one driver (1+1 Gatekeepers in total per DOH-MB)  Two chains for L3 & L4 with two drivers (1+2 Gatekeepers in total per DOH-MB)  Jitter issue  Use of QPLL is investigated (radiation tolerance?)  new components placement and routing of the DOH-MB is needed  DOH-MB v2  The POH-MB was modified in the last minute that it can accomodate a DOH-MB v2 (lock signals to CCU ring)  We can/must start to work on a DOH-MB v2 before having the test results and decision on the use of QPLL DOH-MB - Pending Tests

Test Results of POH-MB  4 POH-MB have been produced  Latest modifcations  Screw holes placement and implementation  2 reserved signals (LOCK) between DOH-MB and CCU-ring  For all 4 DOH-MB (8 fast I2C channels) we have the following test results  Connectivity test  This time measured manually line by line  All 4 boards passed the tests  Possible issue: tracks very close to POH screw holes  These boards always have to be handled with extra care (not to be bended)!  Pending tests  fast data signal quality measurements at the end of lines(at POH inputs). We would keep 1 board now.  1 board to Zürich, 2 boards to Aachen (?)

Adapter Boards AB L1&L2 - bottom AB L1&L2 - top AB L3&L4 - bottom AB L3&L4 - top AB L1&L2AB L3&L4

 AB L1&L2 and AB L3&L4 have been produced  We have the following test results  Connectivity test  This time it was measured manually line by line  All AB L1&l2, and 3 / 4 of the AB L3&L4 passed the tests  On 1 board we have a short circuit, not found yet not even with a microscope  it can be either under one of two connectors or inside the PCB  Low voltage (V d and V a ) voltage drop  Important quantitative parameter of the AB and CB boards (just like of the Extension Boards and modue cables): How we use up the voltage drop budget?  See results in next slides  Pending measurements  No (Maybe more precise measurement of the GND plane resistance)  AB boards have to be used in other pending measurements (fast I2C signal quality and Sector C-D entire voltage drop) -> We keep 1+1 of them.  1+1 boards to Zürich, 2+2 boards to Aachen (?) Test Results of AB L1&L2 and AB L3&L4

 AB and CB voltage drop simulations  In the PCB design phase, post-layout simulations were made for the forward V a and V d connections  iterating the „layout and routing” to minimize drop  Common ground plane for the return path: resistance was estimated  Both copper thickness, trace (plane) widthes, no. of layers (GND planes) are all limited  We think that with the design efforts we went just to the wall.  AB and CB voltage drop measurements  Originally we wanted to measure it through the AdpterBoard – ConnectorBoard chain (or even a module cable included), and this is what we have to do (will do) as soon as we have all the boards.  Now we measured the AdapterBoards only with the aim of verifying the simulations  To get the whole voltage drop picture now, we have to rely on a mixture of mesuremenst, simulations, and estimations, however the AdapterBoards measurements can verify/correct the simulation results. Sector C: V a nd V d voltage drop simulations and measurements

 AB and CB voltage drop simulations  In the PCB design phase, post-layout simulations were made for the forward V a and V d connections  iterating the „layout and routing” to minimize drop  Common ground plane for the return path: resistance was estimated  Both copper thickness, trace (plane) widthes, no. of layers (GND planes) are all limited  We think that with the design efforts we went just to the wall.  AB and CB voltage drop measurements  Originally we wanted to measure it through the AdpterBoard – ConnectorBoard chain (or even a module cable included), and this is what we have to do (will do) as soon as we have all the boards.  Now we measured the AdapterBoards only with the aim of verifying the simulations  To get the whole voltage drop picture now, we have to rely on a mixture of mesuremenst, simulations, and estimations, however the AdapterBoards measurements can verify/correct the simulation results. Sector C: V a nd V d voltage drop simulations and measurements

AB L1&L2 AB L3&L4

Sector C: V a nd V d voltage drop

Pending Issues  CB boards production to be completed soon  Power cables to be designed and produced  Verfication of the implemented delays vs. the detector needs measure with the actual cable length distrubution  Only minor changes is possible  For the final production we need a scheduling for the deliver of the boards (input from Lea till the beginning of summer)