PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy PREFER Project Overview.

Slides:



Advertisements
Similar presentations
NEFIS Meeting, Vienna, May 24-25, 2004 WP6 Links with Commission Services Dissemination of results Follow-up activities Status and plan.
Advertisements

© Infoterra-Global 1 PREVIEW HALO Workshop Toulouse, July 2006 Patricia CONTI, EADS ASTRIUM © 2005.
WMO RA VI Workshop, Zagreb, Croatia, 17 – 18 May 2012 Milan Erjavec, M. Sc. E. E. National Protection and Rescue Communication and Information System NATIONAL.
Meeting #3 ENDORSE ENDORSE (Energy DOwnstReam SErvices) Providing energy components for GMES Presentation.
PROFORCE Bridging of Probabilistic Forecasts and Civil Protection Yong Wang, Clemens Wastl, Franziska Strauss (ZAMG)
PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy PREFER Communication and Workshops PREFER Communication and Workshops.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Date 1 WP1 4 th Steering Group Meeting Faro (Portugal), 24th October 2012.
Wildland - Urban Interface Forest Fire Risk Observatory and Interest Group in Europe WUIWATCH Grant Agreement Nº ECHO/SUB/2014/
Research Programme Design and Management – Experiences from CRUE – Partner Countries Reiner Enders PTJ (Project Management Organisation Juelich) Brussels,
Federal Office for Civil Protection FOCP. Ident.-Nr./Version Civil protection system in Switzerland Willi Scholl, Director General, Swiss Federal.
19/20 May 2015, Riga “From Gaps to Caps – Risk Management Capability Based on Gaps Identification in the BSR” TASK D COMPARISON OF EVALUATIONS OF EMERGENCIES.
Protection and Disaster Risk Reduction (Place) – (Date) Session 6.1: Integrating Protection into Disaster Risk Reduction.
An Integrated Methodological framework for Emergency Logistics - MELOGIC Dr Georgios Boustras Associate Professor in Risk Assessment Dean of the Ioannis.
Action of Contrast to Contrast to Hydraulic Hydraulic Emergency in Emergency in LOcal LOcal Urban Urban Site SiteACHELOUS.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
ALPINE SEARCH AND RESCUE FOR SLOVENIA AND ITALY. ALPSAR IN SHORT  Budget: € ,00  EC Contribution: € ,25 (75%)  Duration: 24 Months 
Sapienza University of Rome a short presentation ERASMUS STAFF MOBILITY WEEK 2011 Sapienza University of Rome EU Research Programmes and visiting Professors.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
The Preparatory Phase Proposal a first draft to be discussed.
FINAL FORUM of the Project „through pREvention to Preserve the natural beauty Of the Rhodope mounTain” REPORT Smolyan, ΕΛΛΗΝΙΚΗ ΔΗΜΟΚΡΑΤΙΑ ΠΕΡΙΦΕΡΕΙΑ.
1 Long-term sustainability and business issues for volcanoes, landslides, subsidence, and forest fires. Hints from the downstream projects DORIS, EVOSS,
ENEA(Italy) EEWRC(Cyprus) CNRM(France) ICTP(Italy) IC3(Spain) NOA(Greece) CMCC(Italy) TEC(France) PlanBleu(France) PIK(Germany) UEA(UK) GREVACHOT(Tunisia)
PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy PREFER 1 st Annual Review Meeting 05-06/12/2013 Milan PREFER 1 st Annual Review Meeting 05-06/12/2013.
Rome, 15 May hrs 4th ODS3F Progress Meeting, 15 May 2014, Rome ODS3F project overview Giovanni Laneve DIAEE – Università di Roma ‘La.
Presidenza del Consiglio dei Ministri – Dipartimento della protezione civile Forest Fires Exercise Pre- exercise training programme April 2008.
SAFER PYRENEES Pyrenees Atlantics and Navarra civil protection preparedness in west Pyrenees Co-financed by the EU Commission.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Water and Climate Risk Management: Managing Hydroclimatic Risk in the Water Sector Technical Workshop and Training Addis Ababa, June 30 – July 2, 2009.
SAFER Services & Applications for Emergency Response Project scope and objectives David HELLO – INFOTERRA France January 2009.
Forest Fires in Europe: an overview Paulo Barbosa Joint Research Centre – European Commission Institute for Environment and Sustainability Ispra.
SCIENTIFIC AND RESEARCH ACTIVITIES IN THE FIELDS OF CRISIS MANAGEMENT AND CIVIL PROTECTION Tomasz Plasota, Bartłomiej Połeć 1 Scientific and Research Centre.
Shelter Cluster Vanuatu Meeting 16 July 2015 PWD Offices, Port-Vila.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy PREFER WP Prescribed Fire Map Methodology to Map the Areas Suitable for the Prescribed.
12-13 July 2011, University of Rome "La Sapienza" Rome, Italy pSHIELD Consortium Meeting Przemyslaw Osocha, SESM,
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
3d GOVERNING BOARD PM Ruti – O Casali
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
WP5– HANDBOOK ON PLANNING METHODOLOGIES Giovanni Leonardi JOINT ACTION HEALTH WORKFORCE WP5 Workshop, Turin – September 18 th 2014.
PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy PREFER WP Prescribed Fire Map Methodology to Map the Areas Suitable for the Prescribed.
Lessons learnt from France’s Awareness System for Enhanced Emergency Preparedness and Response Authorities F.Bénichou (Météo-France), JM.Tanguy (SCHAPI)
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Antonella Fresa Roma, 12 December 2005 kick off meeting.
Progress on WP9 (T9.1) Scientific and Technical Coordination K. Folkert Boersma, KNMI Jan-Peter Muller (UCL) QA4ECV 1 st (Interim) Review.
Why are we here? projectsnational coordinationWorking groupsTCS.
SEEDS: Programme and Objectives SEEDS Kick-off meeting May 4, Lausanne Renate Kunz.
Overview deliverables and achievements second reporting period Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels.
WELCOME SEE.ERA.NET KICK-OFF Monday, 20 September 2004.
Slide 1 GEO-GLAM The GEO led Initiative for GLOBAL AGRICULTURAL MONITORING GEO Agriculture Community of Practice 1.
Second Annual Meeting What will happen in the 3 rd TRAFOON project year? 12 November 2015, Athens, Greece Javier Casado| Hohenheim Research Center for.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
INTERREG III B ARCHIMED PRO ACTIVE MANAGEMENT OF WATER SYSTEMS TO FACE D ROUGHT AND WATER SCARCITY IN I SLANDS AND COASTAL AREAS OF THE M EDITERRANEAN.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Office 365 Security Assessment Workshop
GCOS IP and Update on CEOS Response
4th IHO-EU Network WG Meeting
MEFISTO Mediterranean Forest Fire Fighting Training Standardisation
SEEDS Kick-off meeting May 6, Lausanne Bojana Tasic Renate Kunz
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
GEO Capacity Building Coordination Capacity Building in GEO WP 2017 – 2019 Capacity Building Coordination TT GEO Programme Board Meeting 23 – 24 May.
4th IHO-EU Network WG Meeting
SWIFTERS: Safe and Rapid Evacuation Facilitated by UAV Swarms
Objectives of the Workshop
Introduction & WP1 CHAIN Meeting Taipei 22 March 2011
Aurora Hoxha & Drini Imami
Presentation transcript:

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy PREFER Project Overview

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy Agenda Agenda 5 December, afternoon Starting time 15:00 - end 18:30. 15:00 – 15:50 Introduction 15:00 – 15:10: Welcome and Logistics (CGS) 15:10 – 15:30: Project Status Overview (DIAEE/REA) 15:30 – 15:50: Management and Technical aspects(DIAEE) 15:50 – 17:20 Activities completed in the first year 15:50 – 16:20: WP 2.1 User Requirements Synthesis (KEMEA) 16:20 – 16:50: WP 2.2 Cross-Cutting between GMES Core Services (UNISTRA) 16:50 – 17:20: WP 2.3 Space Segment Analysis(GMV) 17:20 – 17:35 Coffee Break 17:35 – 18:30 Service infrastructure Progress & Q&A 17:35 – 17:55: Overview of the Information Service (CGS) 17:55 – 18:30: Discussion (Q&A) 18:30 End of Day 1 20:00 Social Dinner

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy Agenda Agenda 6 December Starting time 9:00 - end 15:30. Products Research Progress 09:00 – 10:30Information support to Preparedness/Prevention 09:00 – 09:30: Seasonal Fuel Map & Seasonal Fire Hazard Map (GMV) 09:30 – 10:00: Seasonal Exposure Map & Seasonal Risk Map (UCO) 10:00 – 10:30: Daily Fire Hazard Map & Prescribed Fire Map(DIAEE) 10:30 – 10:50 Coffee Break 10:50 – 13:00Information support to Recovery/Reconstruction 10:50 – 11:30: Post-fire vegetation recovery map (IESC) Burn Scar Map Optical SAR & VHR (IESC) 11:30 – 12:00: Biomass Burning Aerosol Map (CGS) 12:00 – 12:30: 3D Damage Assessment Map (UNISTRA) 12:30 – 13:00: Severity Damage Map (DIAEE) 13:00 – 14:15 Lunch Break 14:15 – 14:30: Communication and Workshop (CGS) 14:30 – 14:45: Planning & AOB (CGS) 14:45 – 15:30: Feedback reviewers EC Officer & Reviewer 15:30 End of Meeting Scientific Advisory Board Meeting 15:30 – 18:00

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy LIST OF PARTNERS Partner number Partner organization name Partner short name Country 1 Dipartimento di Ingegneria Astronautica Elettrica e Energetica – Sapienza Università di Roma. DIAEE Italy 2 COMPAGNIA GENERALE PER LO SPAZIO, S.p.A.CGSItaly 3 Intelligence for Environment & securityIESCItaly 4 GMV Aerospace and Defence SAGMVSpain 5 SATWAYSSATGreece 6 Center for Security StudiesKEMEAGreece 7 University of StrasburgUnistra/SERTITFrance 8 University of CoimbraUniCoPortugal

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy Scientific Advisory Board Prof. F. Ferrucci ( University of Calabria)Italy Prof. G. Laneve ( University of Rome) Italy Prof. L. Laurenco ( University of Coimbra)Portugal Jesus San Miguel ( JRC Ispra)Italy Giovanni Rhum (Group on Earth Observations - GEO) Scientific & Technical team Switzerland

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy USERSCountry Portugal National Authority for Civil Protection (ANCP)Portugal Ministry of Environment of AndalusiaSpain Office National des Forets Direction Generale CorseFrance Corpo Forestale e di Vigilanza Ambientale – Regione Autonoma della Sardegna Italy Prefecture of Peloponnesus Including associated Civil Protection Resources Greece Meteorological Dept - Ministry of DefenseItaly Other USERS Country Molise Regional Civil Protection Italy State Fire Corps Italy Fire Corps of Umbria Region Italy National Institute for Nature and Forest Portugal Fire Corps of Calabria Region Italy

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy Work Breakdown Structure In progress Completed Not started

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy WP Number WP TitleType of Activity Lead Beneficiary Start month End month 1.1Project managementMGTDIAEE Scientific & Technical CoordinationRTDDIAEE Analysis of User Requirements and Legal Framework RTDKEMEA16 2.2Cross-Cutting between GMES Core ServicesRTDUNISTRA Space Segment AnalysisRTDGMV Information Support to Preparedness/Prevention Phase RTDGMV Information Support to Recovery/Reconstruction Phase RTDIESC Service Infrastructure Design & Development RTDCGS Communication & NetworkingOTHERCGS User Training & WorkshopsOTHERSATW136 1 st year activities (Dec – Dec. 2013): active WPs

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy Del. Num.Deliverable titleType of activity Lead beneficiary Date D21.1PREFER User Requirements DocumentRTDCoordinator KEMEA Contributors: DIAEE, GMV, UNISTRA, UCO, KEMEA. 6 D21.2Analysis of the Legal Framework related to Forest Fires in the Mediterranean Area Document RTDCoordinator KEMEA Contributors: DIAEE, GMV, UNISTRA, UCO, KEMEA 6 D21.3Analysis of the Legal Framework related to dual use of the PREFER information RTDCoordinator KEMEA Contributors: DIAEE, GMV, UNISTRA, UCO, KEMEA 6 D61.1PREFER websiteOTHERCGS3 D61.2PREFER Promotional Material Design and preparation of the project dissemination and promotional material (brochures, slide presentations,etc.). OTHERGMV6 D62.1Workshop 1 materialOTHERDIAEE6 Deliverables submitted after 6 months The deliverables listed above have been submitted through SESAM at the end of June – beginning of July Final version for deliverables D21.1 – D21.3.

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy Del. Num.Deliverable titleType of Activity Lead Beneficiary Date D22.3Synergies with GMES Land and Emergency Services Report (Final) RTDCoordinator UNISTRA Contributors: GMV. 12 D22.4PREFER Information Service Product Portfolio Specifications (Final) RTDCoordinator CGS12 D23.2Space Segment Analysis Report (final)RTDCoordinator GMV Contributors: UNISTRA. 12 D31.1Information Support to Preparedness/Prevention Phase Service Design Report RTDCoordinator GMV Contributors: DIAEE, UCO. 12 D32.1Information Support to Recovery/Reconstruction Phase Service Design Report RTDCoordinator IESC Contributors: DIAEE, CGS, UNISTRA. 12 D61.3PREFER Dissemination PlanOTHERCoordinator CGS Contributors: STW, GMV, KEMEA, UNISTRA 12 Activities for the first year: deliverables

PREFER 1 st Annual Review Meeting, 5-6 Dec 2013, Milano-Italy Thank you