M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
Advertisements

FToF Status Report CLAS Collaboration Meeting1 Test Results, Ongoing Work, Still To-Do, and More … FToF Progress Report CLAS Collaboration Meeting June.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - 3/10/061 M. Bonesini INFN Milano Some results from BTF testbeam on TOF.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
M. Bonesini - MICE CM19 RAL 07/10/071 M. Bonesini INFN Milano PMTs tests in Milano (M. Bonesini, M. Rayner, S. Terzo)
M. Bonesini - 08/06/06 Fermilab1 M. Bonesini INFN Milano MICE TOFes construction & planning.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
27/6/05 Frascati1 M. Bonesini INFN Milano A possible design for MICE TOF stations.
M. Bonesini - MICE Collaboration Meeting 9/10/061 M. Bonesini INFN Milano TOF status (mainly TOF0/1)
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
MICE PID, 6 Dec 2007 V. Palladino Introduction to the meeting Introduction to the meeting 1 ) TOF I shielding (Vittorio introduces discussion) 2) Discussion.
M. Bonesini DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)
April 2006Jean-Sébastien GraulichSlide 1 Pmts and Scintillators o Used Material in Geneva - Big Scintillator Slabs + Pmts - XP2972, 1” Pmts + Voltage Divider.
Shielding EMCal-KL planes D.Orestano on behalf of L.Tortora MICE CM 8/10/06.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
PHOBOS TOF Construction Status
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
M Bonesini1 M. Bonesini – INFN Milano TOF news. M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Performances of SiPMT array readout for Fast Time-of-Flight Detectors 13th Conference on Innovative Particle and Radiation Detectors Siena – 7-10 October.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
M. Bonesini - 22/10/05 RAL1 M. Bonesini INFN Milano MICE TOF stations construction & planning.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
M. Bonesini - MICE PID review 12/10/061 M. Bonesini INFN Milano TOF upstream PID review (TOF0/1)
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Status update on the Central Neutron Detector J. Bettane, J.L. Cercus, B. Garillon, T. Nguen Trung, S. Niccolai, D. Sokhan Detector goals and design Tests.
26/10/04 Meeting1 M. Bonesini INFN Milano MICE TOF0, TOFI, TOFII status.
CLAS12 Forward Tracking: Status and Challenges
CRT / Test KEK Fuji Tomokatsu Hayakawa Nagoya University 12th B2GM 2012/7/23.
IFR detector mechanics
MICE PID detectors & Shielding MICE CM19, RAL Oct 10, 2007
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Particle ID Diagnostics in the MICE Beamline
Presentation transcript:

M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project

M. Bonesini - MICE CM CERN 24/2/072 Outline Hot topics BTF testbeam analysis completed TOF1/2 PMTs shieldings issue TOF0/1 schedule TOF2 schedule

M. Bonesini - MICE CM CERN 24/2/073 Completion of BTF data analysis BTF data analysis is completed and a MICE note (MICE-DET-163) has been posted Results include: intrinsic counter resolution (center bar hitting) Intrinsic counter resolution (x scan) study of time-walk (correction + use of a CF discriminators) determination of N pe ( pe) All results for Bicron BC404,BC408,BC420 and Amcrys-H UPS95F scintillators

M. Bonesini - MICE CM CERN 24/2/074

5 Estimation of N pe N pe ~ p.e. depending on impact point, in agreement with GUIDEIT lightguide simulation

M. Bonesini - MICE CM CERN 24/2/076 Conventional PMTs shielding  TOF0 PMTs requires no shielding, aside 1 mm  -metal due to small B field (B << 50 Gauss, Kevin private communication)  TOF1/2 even after the 100 mm global iron shielding needs some additional shielding to use conventional PMTs (as B // ~ G, B _|_ ~ 1000 G)

M. Bonesini - MICE CM CERN 24/2/077 Problem: R4998 can bare B _|_ but not B // B // < 50 Gauss fine; B _|_ < Gauss fine eventually additional  -metal or soft iron

M. Bonesini - MICE CM CERN 24/2/078 Advocated solutions: Solution A (“Ghislain cage”): extra shield (50 mm) connected with joints to first shield (100 mm) and local shielding of PMTs (  -metal only if 420 mm hole) Solution B: no-extra shield but heavy local shielding of PMTs a la D0 (test magnet delivered now at Bicocca)

M. Bonesini - MICE CM CERN 24/2/079 B field with one 100 mm iron shield (current design)

M. Bonesini - MICE CM CERN 24/2/0710 B field is ~ G //; ~ 1000 G _|_ at r=30-35 cm (PMTs position) I doubt it can be shielded with individual PMTs shields, preserving good timing properties this point to 2 nd shield, but we will try to test PMTs “exotic shieldings” by building a 400 G lab solenoid My old transparency at RAL CM16 BUILT: coil with 5 windings for fields up to G

M. Bonesini - MICE CM CERN 24/2/0711 D0 tests (note # 2706) Problems: It will work for R4998 1” PMTs? Tests to be done for Gain + timing See preliminary results later

M. Bonesini - MICE CM CERN 24/2/0712 R. Bertoni, M. Bonesini INFN MIB

M. Bonesini - MICE CM CERN 24/2/0713 Preliminary tests of Fe360 Box shielding (a la D0) seems promising Needs more work: full tests with PMTs for Gain+timing Use of different iron shields : Fe360, Armco, Inox … and shapes

M. Bonesini - MICE CM CERN 24/2/0714 From presentation by G. Gregoire at PC-224 and J.Cobb at PID // session  Close outer gap between to discs; thicker 2nd disc (50mm) Somewhat more complex – engineering / mounting TOFs…. G. Gregoire Shield

M. Bonesini - MICE CM CERN 24/2/0715

M. Bonesini - MICE CM CERN 24/2/0716

M. Bonesini - MICE CM CERN 24/2/0717 Problems: cabling (HV, signal, calibration fibers …) in/out alignments (1cm = 50 ps): risk to loose calibration every time you move in/out

M. Bonesini - MICE CM CERN 24/2/0718

M. Bonesini - MICE CM CERN 24/2/0719

M. Bonesini - MICE CM CERN 24/2/0720 B_r B_z G. Gregoire scheme gives very effective shielding for TOF1/2 500 gauss gauss

M. Bonesini - MICE CM CERN 24/2/0721 Solution A vs B Solution A makes life easier for TOF1, but requires an extra shield + some problems for detector access + to change PMTs you move all detector (50 ps = 1 cm !!!). Clearly it is very attractive for TOF1 if hole has a 420 mm diameter (only  -metal for PMTs) Solution B: must be tested (tests have now started at MIB), easier access to detector but more bulky support

M. Bonesini - MICE CM CERN 24/2/0722 TOF0/1 project spending to completion minimal, with many worked out savings timescale dominated by funding problems (now maybe burocracy ) I will divide project in 2 phases Detector construction in-house Detector installation/commissioning at RAL

M. Bonesini - MICE CM CERN 24/2/0723 Detector construction in house material procurement: up to now no big delays All PMTs ordered Scintillator/lightguides ordered (need to define LG shape for TOF1 mainly hole radius) Electronics ordered ( status of stretcher/splitter ?) Counter assembly: mount & calibrate detectors with cosmics here delay may arise 3 months (April-June) to do this Detector plane assembly: you need to assemble X/Y planes in a rigid structure 1-2 months (July-August) to do this

M. Bonesini - MICE CM CERN 24/2/0724 Front-End electronics a baseline design has been proposed (stretcher/splitter+CAEN V1290 TDC+CAEN V1724 FADC+recuperated CAMAC LE discr) all electronic boards ordered to CAEN needs Sofia/UniGE for splitter/stretcher design&construction)+integration into DAQ

M. Bonesini - MICE CM CERN 24/2/0725 Calibration system only prisms+ fibers for injection into counters has been ordered all the rest : cheap laser source, fiber bundle to be ordered/tested/assembled as example, recent quotation from Quanta ~70K (needs clearly cheaper “non-commercial solution” …)

M. Bonesini - MICE CM CERN 24/2/0726 RAL installation/commissioning main hardware item: external supports for TOF stations, cage for TOF1 (RAL, UniGE ?) detectors shipping to RAL installation of TOF planes on external supports cabling electronic debugging debugging with beam All this is less clear to me (as an INFN approval/prompt budgeting is needed)

M. Bonesini - MICE CM CERN 24/2/0727 TOF2 project TOF2 (albeit bigger … but how much? Need to fix dimensions in the PID group: 60 x 60 cm 2 ??) is a clone of TOF1 schedule is more relaxed: it can be assembled beginning 2008, but material procurement must be in 2007

M. Bonesini - MICE CM CERN 24/2/0728 TOF2 updated costs 24/12/06 TOF2 missing costs to completion earmarked INFN investment Conv PMTs (VAT) 66KE Support mechanics+local PMT shielding 10KE Scintillators+light guides+ counter laser injection 10KE Cables 5KE Patch panels …3KE Detector assembly (including external firms) 5KE FE electronics (FADC+TDC+L.E. discr.+splitter+stretchers) 35KESplitter+stretche r+ 1TDC + 1 FADC boards 12KE HV voltage (1/3)16 KENo, recuperated Total150KE111KE39(16)KE No contingency, minimal external costs …

M. Bonesini - MICE CM CERN 24/2/0729 Conclusions up to now no big delays for TOF0/1, but “friction” will increase with time some extra help in April-June may be needed in Milano for tests/assembly external supports, cage for TOF1 (if any) at RAL clearly uncovered