Presentation is loading. Please wait.

Presentation is loading. Please wait.

MICE PID detectors & Shielding MICE CM19, RAL Oct 10, 2007

Similar presentations


Presentation on theme: "MICE PID detectors & Shielding MICE CM19, RAL Oct 10, 2007"— Presentation transcript:

1 MICE PID detectors & Shielding MICE CM19, RAL Oct 10, 2007
V. Palladino, Univ & INFN Napoli for the small PID team Bonesini, Chimenti, Cremaldi, Giannini, Graulich, Gregoire, Kaplan, Karazdov, Orestano, Sandstrom, Summers, Torun, Tortora, Tsenov, and more MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

2 V. Palladino PID Detectors & shields
general picture TOF0,CKOV TOFI, KL at RAL before Xmas due Jan 20 at RAL CKOV+TOF0 stand is Production Ready …. green light for Wing to build it TOFI stand & shield undergoing Production Readiness Review shielding plate + global PMT niche (cage) PRR started …… first Fermilab quote sobering (60K$) … more quotes coming …. the fewer changes the better due Jan 15 at Fermilab TOFII & beyond ……. final shield & layout being decided cage, expensive, less practical local PTM niches, attractive as more practical and cheaper TOFII at RAL Jun 08 SW = back end of eμC AL finish its design & find the money SW at RAL uncertain MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

3 MICE PID PMT shielding needs
Large B fields at PMTs 4 Tesla An iron donut, the “Gregoire plate” then to become known as Virostek plate, drastically reduces the fields will be built in each solenoid MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

4 Further PMT shielding needed however
1) “Gregoire cage” global shield 2) local heavy shields MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

5 V. Palladino PID Detectors & shields
With Cage II Jan 08 B-mapped at FNAL Jan 15-Feb 15 including fringe fields Apr 08 B-mapped at FNAL Apr 15-May 15 including fringe fields Jul Jul 08 MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

6 V. Palladino PID Detectors & shields
No Cage II Jan 08 B-mapped at FNAL Jan 15-Feb 15 including fringe fields Apr 08 B-mapped at FNAL Apr 15-May 15 including fringe fields Jul Jul 08 MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

7 Second 90’ of PID session on Sunday
GENERAL DOWNSTREAM LAYOUT G. Gregoire Shielding of TOF II & beyond: 3D calculation (15') M. Bonesini Decision process for shielding of TOF II & beyond (15') Discussion on downstream layout (10') MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

8 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

9 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

10 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

11 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

12 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

13 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

14 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

15 V. Palladino PID Detectors & shields
rather MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

16 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

17 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

18 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

19 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

20 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

21 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

22 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

23 V. Palladino PID Detectors & shields
SW = back end of eμCAL Prototype successfully built & tested (TS+FNAL) Design progressing inevitably cost minded Costing will thus come along Funding ………. FNAL UniGe INFN ??? others Schedule …… 6 months for construction MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

24 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

25 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

26 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

27 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

28 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

29 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

30 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

31 V. Palladino PID Detectors & shields
MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields

32 V. Palladino PID Detectors & shields
general picture TOF0,CKOV TOFI, KL at RAL before Xmas due Jan 20 at RAL CKOV+TOF0 stand is Production Ready …. green light for Wing to build it TOFI stand & shield undergoing Production Readiness Review shielding plate + global PMT niche (cage) PRR started …… first Fermilab quote sobering (60K$) … more quotes coming …. the fewer changes the better due Jan 15 at Fermilab TOFII & beyond ……. final shield & layout being decided cage, expensive, less practical local PTM niches, attractive as more practical and cheaper TOFII at RAL Jun 08 SW = back end of eμC AL finish its design & find the money SW at RAL uncertain MICE CM19, RAL, 10 Oct 2007 V. Palladino PID Detectors & shields


Download ppt "MICE PID detectors & Shielding MICE CM19, RAL Oct 10, 2007"

Similar presentations


Ads by Google