Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014.

Slides:



Advertisements
Similar presentations
Preliminary Road Map to Information Distribution AMHS-SWIM Workshop 5-6 March 2012 Chiang Mai, Thailand SP/4.
Advertisements

Objective ENV01 ESSIP Plan 2013 Bernd HILL DSS/EIPR
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective FCM05 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
LSSIP Objective AOP04.2.
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
LSSIP Objective AOP04.1.
European Single Sky ImPlementation ESSIP DEVELOPMENTS Reference: SCG/10/AP05 – Action Paper 05 Christian Coëffé Head of European Single Sky Implementation.
Objective INF04 ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
LSSIP Objective AOP01.2.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
The European Organisation for the Safety of Air Navigation Objective AOP04.1.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
AMHS WORKSHOP POLICY & DOCUMENTATION. AMHS WORKSHOP POLICY & DOCUMENTATION  Operational Requirements for facilities or services are established through.
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective FCM04 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR

ESSIP Plan 2014 / Objective COM102 Objective COM10  Comprehensive Explanation  Link to European ATM Master Plan  Most important SLoA(s)  Finalisation Criteria and Closed Questions  Supporting Material  ESSIP Report 2013  Objective Coordinator’s Analysis, recommendations, tips & tricks  Conclusions  Links and contacts

ESSIP Plan 2014 / Objective COM103 Comprehensive Explanation  AFTN / CIDIN technology is now becoming obsolescent, and is not sufficiently flexible to support future messaging requirements. It is intended that existing AFTN and CIDIN users and systems will transition to more modern technology, using the ATSMHS application, defined by ICAO to replace the AFTN telegraphic style of working with a store-and- forward Message Handling System based on international Standards and providing enhanced functionality.  The ATS Message Handling System (AMHS) is a proven messaging application based on the X.400 worldwide standards for messaging and on the Internet Protocol (IP) for transmission and routing. In the EUR ICAO Region it was decided to implement the AMHS on top of a TCP/IP network infrastructure. The deployment of AMHS is an ongoing work, which was started with the implementation of the "Basic Service" since An important development will be the introduction of the "Extended Service" which is described in the ICAO documentation.

ESSIP Plan 2014 / Objective COM104 Link to European ATM Master Plan  Enabler - [CTE-C10]-AMHS

ESSIP Plan 2014 / Objective COM105 Most important SLoA(s)  COM10-ASP01 Implement AMHS capability (Basic ATSMHS) and gateway facilities to AFTN;  COM10-ASP03 Enhance AMHS capability (Extended ATSMHS)

ESSIP Plan 2014 / Objective COM106 Finalisation Criteria and Closed Questions  AMHS capability for Basic ATSMHS has been implemented, documented and in operational service (12/2011)  Extended ATSMHS capability has been implemented, documented and in operational service (12/2014)

ESSIP Plan 2014 / Objective COM107 Supporting Material  EUROCONTROL Specification on the Air Traffic Services Message Handling System (AMHS)" 0136, Edition number 2.0 "EUROCONTROL specification on the Air Traffic Services Message Handling System (AMHS)" published as Community Specification in the Official Journal of the European Union (ref. OJ C 323, , p. 24) EUROCONTROL Specification on the Air Traffic Services Message Handling System (AMHS)" 0136, Edition number 2.0 "EUROCONTROL specification on the Air Traffic Services Message Handling System (AMHS)" published as Community Specification in the Official Journal of the European Union (ref. OJ C 323, , p. 24)  ICAO ATS Messaging Management Manual (ICAO EUR Doc 021) ICAO ATS Messaging Management Manual (ICAO EUR Doc 021)  ICAO EUR AMHS Manual (ICAO EUR Doc 020) ICAO EUR AMHS Manual (ICAO EUR Doc 020)  ICAO detailed technical specifications (ICAO Doc 9880 Part IIB) ICAO detailed technical specifications (ICAO Doc 9880 Part IIB)

ESSIP Plan 2014 / Objective COM108 ESSIP Report 2013  While the implementation of Basic ATSMHS is expected to be finalized by all states by 12/2014, the enhancement of the AMHS capabilities will most probably suffer delays because still Six ANSPs have not yet planned the implementation while four ANSP are Late in implementation ;  23 States/ANSPs have implemented the basic ATSMHS, the remaining are implementing it but two which have No Plans yet;  5 States/ANSPs have implemented the Extended ATSMHS, while 3 have No Plans to implement it;  Some states are suffering from lack of regional support, awaiting their neighbours ACCs readiness to start planning implementation.

ESSIP Plan 2014 / Objective COM109 Objective Coordinator’s Analysis, recommendations, tips & tricks  Priority should be given to implement the required communication infrastructure covered by COM09 Internet Protocol (IPv6);  Start implementing Basic ATSMHS

ESSIP Plan 2014 / Objective COM1010 Conclusions  Importance of the IP based communication infrastructure  Implement COM10-ASP01 and ASP03

ESSIP Plan 2014 / Objective COM1011 Links and contacts  Objective Coordinator: Adriatik Kokona,  DNM Objective Expert(s): Yuksel EYUBOGLU,