SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report

Slides:



Advertisements
Similar presentations
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Tim Haeberle API SC Winter Meeting
API Subcommittee 17 Industry Standards for Subsea Equipment
API Standard 6X: Design Calculations for Pressure-Containing Equipment
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
TG3 17TR8 Liaison Report HPHT Design Flow Chart
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
February 21, 2001TR CFR PART 68 – pre R&O Refers to the document published by the FCC Contains the following sub-parts –Subpart A –Subpart.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group Status January ,11, 2017
API SC 10, Work Group 3 Update:
Updates from SC18 Summer Meeting
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API 17Q Proposed Technical Changes to Rev 0
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Impact on SC 6 Documents by Kenneth Young
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
API 17Q – Subsea Equipment Qualification
API SC6 Valves and Wellhead Equipment
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
2016 Exploration & Production Standards Conference Subcommittee 10
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
First 8 slides are what was presented in San Fransisco…
API SC-16 task group for Specification 16D
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
Don Wells Hess Corporation
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17H ROV/ROT Interfaces
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API 17H ROV/ROT Interfaces
API 17H ROV/ROT Interfaces
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
CSOEM Materials Advisory Resource Group
API SC6 Valves and Wellhead Equipment
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API 16C Choke and Kill Equipment
API 17P TASK GROUP June 26, 2013.
Presentation transcript:

SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report Updates from Winter 2015 Meeting Mohsen Shavandi Virgilio Garcia

SC 17 Report Winter 2015 Appointed liaisons with Materials group, International Standards, Industry Standardization 28 document (7 New), 14 TRs (8 New TR) 17A (RP) – Design and Operation of Subsea Production Systems Under revision SRRR submitted for Annex A and Annex I to be a separate documents (proposed TR13 and TYR14) Material section to be reviewed and revised 17D (Spec) –Subsea Wellhead and Christmas Tree Equipment Addendum for Annex O being balloted Ballot closed for removal of PSL 3G for wellheads 17E (Spec) –Subsea Umbilicals Draft will be sent for comment and ballot 17F (Std) –Subsea Production Control Systems 3rd edition published in May 2014 SRRR submitted to start the next edition to address issues from previous edition 17G (RP) –Completion Workover Risers 6th draft will be completed by end of February The next revision is recommended to be balloted as Standard rather than Specification Document size reduced by 20%

SC 17 Report Winter 2015 17H (RP) – ROTs and Interfaces n Subsea Production Systems Incorporate 17M (17M is withdrawn) SRRR  submitted and accepted for next revision Will issue errata now for figure 20 (Hot stab dimensions) Deep Star Task report: API agreed to accept report as Donated work from Deep Star Deep Star grants API permission to issue report under SC17, but retain ownership of report Document will be under API 17H umbrella 17K (Spec) –Bonded Flexible Pipe Up for review, the industry input due by Q1 2015, work will extend into Q1 2016 Established input requirements and task group (29 SMEs) 17N (RP) - Subsea Reliability Incorporate existing 17Q content to introduce TQ process RP due for next revision 17P (RP) –Subsea Structures and Manifolds SRRR submitted to update and rationalize the materials section Next meeting to be scheduled 17R (RP) –Flowline Connectors and Jumpers Resolved comments from ballot; will send out for recirculation and publication

SC 17 Report Winter 2015 17S (New RP) – Subsea Multiphase Flow Meters Ballot closed in December 2014 In comment resolution, will be submitted for re-ballot 17U (New RP) –Wet and Dry Thermal Insulation of Subsea Flow Lines and Equipment In publication process 17V  (New)- Subsea Safety Ballot comments reviewed and incorporated In final circulation; to be published in February 17Y (New RP) –Subsea Chemical Injection SRRR submitted in June 2014 Work in progress 17X (New RP) – Subsea Boosting Under development (started Jan 2013) Expect the first draft by April 2015 17Z (New RP) –Boded Composite Pipe for Offshore Applications TG to formed by end of Q1 2015 and the draft is targrted for end of Q3

SC 17 Report Winter 2015 TR7- Connectors (except flowline connectors) Annex I to be completed and recirculated Waiting on 17G technical team to free up SC16 encouraged to get involved in review TR8 – HPHT Design Guidelines Passed ballot; 1st edition to be published in February Motion passed for SRRR  to get CSOEM to put aside $345,000 to perform independent analysis and material testing Motion passed to start the 2nd edition ASME Section VIII Div 3 task group is helping with the material section We encourage SC 18 to participate TR9 –Subsea Umbilical Termination Selection and Sizing Recommendations Document to be completed in April 2015 TR10-Subsea Umbilical Termination Design Recommendations recommended to be re-balloted due to addition of two complete sections TR12- In final review; 2 negative votes being addressed

SC 17 Report Winter 2015 THANK YOU!