Presentation is loading. Please wait.

Presentation is loading. Please wait.

API 17H ROV/ROT Interfaces

Similar presentations


Presentation on theme: "API 17H ROV/ROT Interfaces"— Presentation transcript:

1 API 17H ROV/ROT Interfaces
January, 2016

2 BACKGROUND API 17H 2nd edition was published in June 2013
API 17M was withdrawn and replace with API 17H Errata to correct hot stab drawings issued January 2014 SRRR has been submitted and accepted for the third revision

3 API 17H TEAM MEMBERS Name Company E-mail Charles White BG Norge
Andy Lee FMC Brian Skeels Karl Schnakenburg BHP Didier Renard Technip Erich Luzi Statoil Steve Liso Chevron Eirik Kloster Jacobsen Blue Logic Aiyueh.Kwan BP

4 CURRENT STATUS Inquiries related to second edition hotstab drawings recieved Released Errata to correct Figure 20 January 2014 Held several meeting to review inquiries related to hotstab drawings 17TR15 currently out for ballot

5 CURRENT STATUS Historically the hotstab drawings have been donated to API use the drawings as provided without making any design changes to the design drawings do not use a common approach for stab/receptacle alignment seal squeeze/location panel clearance requirements datum for dimensioning misinterpretation of the drawings and a number of inquiries to the taskgroup   

6 CURRENT STATUS Task group is recommended to publish a technical report related to the hotstab drawings Normalize the drawings Clarify the intent of the drawings as interface drawings Adopt new straegy to control the recepticle dimentions Allow more freedom for manufactures to innovate male hot stab designs while maintaining subsea interchangeabiltiy   

7 CURRENT STATUS SRRR issued to develop hotstab technial report
Technical report to be issued for comment ballot (December 2015) Contents of technical report will be incorporated into 3rd edition API 17H

8 CURRENT STATUS Focus areas for the next edition are:
Incorporate comments from hotstab technical report Clarification of quality requirements Consider outstanding comments left from the previous edition Add references to recently released recommended practice Incorporate Deepstar AUV Document into API17H

9 NEXT STEPS Resove any comments to 17TR15
Issue hotstab technical report Continue work on third edition API 17H

10 MILESTONES


Download ppt "API 17H ROV/ROT Interfaces"

Similar presentations


Ads by Google