COMPANY INTRODUCTION AND OPERATION Prepared by: Eng. Abdul Rasool H. Nouri General Manager Plant on Jebal Ali Free Zone South on Plot # 20909 Tel : 00971.

Slides:



Advertisements
Similar presentations
Tips to a Successful Monitoring Visit
Advertisements

Emergency Evacuation Zayed University, Dubai Campus.
User requirements of a comprehensive ENVIRONMENTAL MONITORING software system Susan B. Cleary.
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
Petrotech Southeast, Inc. Oil Water Separator Maintenance.
SUPPLY CHAIN & LOGISTICS Career Opportunities. What is Logistics?  Logistics is the management of the flow of resources between the point of origin and.
Determine Scope of Assessment Select Assessment Team Notify Laboratory & Request Records Determine Team Assignments Sample Receipt and Storage Assessment.
THEFT OF GAS TEAM. THEFT OF GAS TEAM PO Box 6803, 31 Homer Road, Solihull, B91 3LT Fax : Free Phone : Seamus Rogers Account.
Accurate Monitoring and Real Time Tracking of Visits Complete Visitor Management Solutions A Product of Copyright © ANGLER Technologieswww.angleritech.com.
1 Exotic Disease Response Training Introduction to Movement Control.
Cranes, Hoists and Truck Hoists
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
NVIC VESSEL SECURITY PLAN OUTLINE
Introduction to SAP R/3.
Job Application Job Advertisements All Rights by James Worden (Merchant Marine Training Centre 2014)
How to create... A Fire Evacuation Plan.
Permit to Work Procedure Document Number: KOC.SA.004
Inspecting A Hedge Fund 2010 NASAA IA Training. Preparing for the Inspection  Getting over your fears  Treat as any other advisor  Preparation  Obtain.
ADMINISTRATION REVISION - BLOCK 3 RECEPTION. Reception is the first area someone enters when they visit an organisation and therefore it must create the.
Introduction to Business Organisations
Export Control System (Exit Summary Declaration) Implementation 01/01/2011.
A PRESENTATION TO THE SELECT COMMITTEE ON PUBLIC SERVICES (NCOP) 24 OCTOBER 2007 BY MPATLISENG RAMAEMA CHIEF DIRECTOR: MARITIME TRANSPORT REGULATION DEPARTMENT.
APLL Taiwan Organization Chart APLL Taiwan Daily Operation Process MCC Map LLS Taiwan Container Utilization Analysis LLS Taiwan Volume Analysis by Division.
UNHCR/e-Centre/InterWorks - Emergency Management Training
GWS SMS INTRODUCTION EMS Manual. 3. PROCEDURES FOR BILGE AND WASTE OIL MANAGEMENT OF MACHINERY SPACES As far as possible, the OWS must not be used.
SECTION 1 - BOOKING Requirement Timely and Accurate submission of booking information Where APL Logistic Taipei Office Cut-Off Vendor should submit the.
Health Insurance Portability and Accountability Act of 1996 (HIPAA) Proposed Rule: Security and Electronic Signature Standards.
Human Resources Administration Department of Social Services 1 Eligibility Data and Image Transfer System EDITS November 6, 2008.
Risk Management Guidelines. Not If, But When Injuries and medical emergencies can and WILL occur Injuries and medical emergencies can and WILL occur It.
Secrets to our Success at CSUN Margo L Dutton, Director, Accounting and Reporting Robin Patterson, Assistant Director CSU, Northridge April 24, 2015.
1 PORTLOGIC ON-LINE Cargo Module July PORTLOGIC ON-LINE Cargo Module Architecture Diagram: Import Sequence Manifests Discharge Tally Sheets EDIFACT.
Dispatching Operations Department of Transportation Project DISPATCHERS.
Staff Induction Fire and Emergency Nick Giles OHS Manager.
Data Protection Act AS Module Heathcote Ch. 12.
OPEN ACCESS IN INTER-STATE TRANSMISSION (e-Bidding)
Complete Visitor Management Solutions A Product of Accurate Monitoring and Real Time Tracking of Visits Complete Visitor Management Solutions.
June 2009Your Partner for Successful Solutions 1 Cash Handling and Management Guideline # 4.1 – Cash Handling and Management
The policy of the Organization Corona will cover the financing and purchase of vehicles bearing in account: a) cooperation on institutional strengthening.
Hawaii Wing Process and Procedures October Processing of Maint. Bills/Invoices Part ordered by Maintenance and copy of PO sent to Wing Administration.
SMS Sponsorship 18 March 2005 Eighth Army ACofS, G1.
Security Awareness Training. What is security awareness training? Security awareness training is an overview of how to be more diligent in the use, management,
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
Life and Work at the LSHTM SECURITY Tuesday 30 th September Improving health worldwidewww.lshtm.ac.uk.
LESSON 8-3 Disposing of Plant Assets
NASA Lunar Sample Loan Security. Video to be updated with new request procedures.
IT IS THE BEST SCHOOL SOFTWARE THAT HELP YOU IN MANAGING SCHOOL ADMINISTRATION WORK. Product of MACWILL.
AGENTS IN MARITIME TRANSPORT Marina Zanne, M.Sc.
Oyungerel Uvgunkhuu Senior Officer of Volume Standard Laboratory Metrology Department Tel: , Fax
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
NASC Audit Program & State Registrations. NASC Audit Program & State Registrations.
Introduction of Accounterlive - Online accounting software
Highveld Industrial Park Office Block ‘’C’’ Information Memorandum
Highveld Industrial Park Storage Warehouse No. 3
Highveld Industrial Park Workshop No. 21 Information Memorandum
Highveld Industrial Park Office Block – ‘’B’’ Information Memorandum
Facility No.41 at Highveld Steel
Highveld Industrial Park Workshop No. 5 Information Memorandum
Highveld Industrial Park Workshop No. 8 Information Memorandum
Data Protection Legislation
LOCATION: BRISBAN AIRPORT and ADJACENT PROPERTIES
“Walk the Talk” Truck Reception, Unloading and Departure
Booking a Visit to the Rutherford Appleton Laboratory
County HIPAA Review All Rights Reserved 2002.
CTICC LOAD-IN & LOAD-OUT LOGISTICS PLAN
INTRODUCTION FOR CASUAL STAFF
EPA Worker Protection Training
Health and Safety - Richard Quenby
ประกาศกระทรวงอุตสาหกรรม ฉบับที่ 5292 (พ.ศ. 2562)
Online Volunteer Work Health & Safety Induction
Presentation transcript:

COMPANY INTRODUCTION AND OPERATION Prepared by: Eng. Abdul Rasool H. Nouri General Manager Plant on Jebal Ali Free Zone South on Plot # Tel : Dir : Fax:

Introduction to Gulf Petro Gas Entry/ Exit Procedures at GPG Plant Communicate your arrival time to concerned GPG staff prior arrival. Ring bell & identify yourself upon request. Automatic door lock shall be opened from switch at office. Register details in Visitor log Book at reception upon entry/exit. Site Induction Training shall be given recorded & registered.

Operation GPG plant – Organization Chart GM Eng. Abdul Rasool Nouri Plant Ops Manager Ahmed Abood Plant administrator Jackuilin Plant Supervisor NoorNabi Operator Harun Operator Mohd Operator Fabi Operator Kumar Operator Sasi Operator Saleem QC/lab in charge Jenivas Accountant Faris Coordinator Emran

GPG Plant - Facility Details & Volumes Cap. *Area 8200 sq. mtrs 8200 sq. mtrs*Facilities Bitumen Storage – 3.5 KT Bitumen Storage – 3.5 KT Truck Loading Gantry – 3 Nos Truck Loading Gantry – 3 Nos Output points- 5 Nos Output points- 5 Nos Laboratory Laboratory Maintenance Block Maintenance Block Road Bitumen Tanker -25Nos Road Bitumen Tanker -25Nos Weighbridge – 100 Tones Weighbridge – 100 Tones Heating system Heating system *Volumes Planned for YR.2009 Bitumen 60 Kt Bitumen 60 Kt MAINT. BLOCK ROAD TANKERS HEATING SYSTEM Truck Loading Gantry Weighbridge

General Overview – Plant Facilities Office Block: toilet emergency exits Canteen Block Guardhouse: security checks entry passes Loading Gantry: Bitumen Tank Farms: Bitumen Office BlockTank Farms Bitumen Road Tankers Laboratory and canteen

Bitumen Cargo ( by vessel ) having quality certificate from origin Drown random samples for quality reconfirmation by third party Meets spec Yes Vessel Discharge Via Loading gantry Into road tankers No Rejected GM (recovery Plan) Trucks receipt at GPG plant Bitumen trucks discharged into GPG’s storages GPG’s quality reconfirmation Sales throughputs measured by GPG’s weighbridge GPG’s Operation Diagram GPG’s Operation Diagram

General Overview – Plant Facilities Laboratory and canteen Gpg Office block Heating sys. And pump station 45 T road tankers