Washington University Medical Center Campus Renewal Project MANDATORY BILLING MEETING JUNE 12, 2015 Presented by:

Slides:



Advertisements
Similar presentations
AmeriCorps is introducing a new online payment system for the processing of AmeriCorps forms
Advertisements

Managing your Loan Star Libraries Grant Part 3 Wendy Clark Jennifer Justus Texas State Library and Archives Commission.
Welcome to the Online Employment Applicant Tutorial Click here for next screen.
Electronic Timesheet User Manual
Secretary of State Delbert Hosemann
DMVA Monthly Time Sheets Hit “Enter” or click your mouse to advance to the next screen.
REQUESTING TRANSCRIPTS Student Training Presentation.
Applying for Tuition Assistance using eTA (Electronic Tuition Assistance Application)
July 2007 Health-e Web Entry. © ENS Inc, an INGENIX company. 2 Introduction  Before your installation appointment, complete the following: (Call your.
GSA eBuy Seller’s Tutorial
Guide to using the myNATE website
TECHNICAL TRAINING December Quick Overview Project Sunlight requires certain New York State entities to report certain appearances by the public.
ETravel Authorization / Reimbursement Overview SOLAR Financials x 6685 July 8, 2014.
Accounts Payable Training Vendor Information & Voucher Preparation Revised 10/16/2014.
1. Definition of a Reconciliation 2. Importance of a Reconciliation 3. When to Prepare a Reconciliation 4. Items Needed to Prepare a Reconciliation 5.
UConn ECE is your opportunity to take UConn courses while still in high school. The UConn ECE courses you will take are equivalent to the same course at.
ODOT Employee Intouch device training
Supplier Invoicing North America
1 Core-CT Student Worker Self Service Time and Attendance Training Rev. 10/22/14.
Applying for work study jobs at Stonehill College.
Billing Agent. Pre-Application Checklist Introduction to IMPACT and Key Terms Application Process Starting an Application The Business Process Wizard.
1 Begin the E Signature Process Here. 2 OPTION 1: Send a secure to the Insured to E-Sign and Pay Online This is a copy of the your Insured.
PURPOSE OF PAYROLL CERTIFICATION 1 The Payroll Certification is an important tool for Fiscal Officers and/or Delegates. It’s purpose is to allow Fiscal.
March 2008 Electronic Billing (EB) Developed by the Department of Developmental Services Developed by the Department of Developmental Services.
Time and Attendance System for Classified Service Employees.
Frank G. Jackson, Mayor Office of Equal Opportunity Monthly Report and Affidavit An Introduction.
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
UC Berkeley, Employment Services Candidate Gateway Tutorial External Applicants.
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts Contract Closeout Application.
Washington Campus Compact New Time Log Database Note to users: You should use Internet Explorer to use this database. In other programs (i.e. Firefox)
0 Electronic Subcontracting Reporting System (eSRS) Department of Defense Government Training.
ENTERING ELIGIBLE ENERGY RESOURCE APPLICATIONS IN DELAFILE Version 2.0 August 25, 2015.
Office of Student Life Human Resources: Manager Supervisors of Student Employees May 2014.
Revised 10/20/04Version 2.4Page 1 of 22 People First Manual Timesheet Training Guide Section 2 -- Training Scenarios.
TimeTrex Electronic Signature Process. Welcome to the new totally electronic TimeTrex System The purpose of this presentation is to explain how the electronic.
University Drivers Permit Application Process. Web Based Home Page Click here to apply for a University Driver Permit.
Department of Psychology Experiment Management System Experimenter Tutorial Stony Brook University Subject Pool Office
* HOW TO PAY YOUR MEMBERSHIP DUES ONLINE AT OWNERS.ORG* (*ONLY A PRINCIPAL CORRESPONDENT (PC) FOR YOUR HOTEL(S) CAN RENEW/PAY FOR 2015 MEMBERSHIP DUES.
Early Childhood Outcomes Indicator 7 Data Collection Application Review.
Steps for posting a training (single event or series) to the regional calendar R&C Regional Calendar.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Ceridian Time Solutions Supervisor. IMPORTANT If you are not the manager of an employee but have been assigned the task of approving time for that employee,
0 Electronic Subcontracting Reporting System (eSRS) Department of Defense Government Training Submitting a SSR – Commercial Plan.
0 Electronic Subcontracting Reporting System (eSRS) Department of Defense Government Training Submitting a SSR – Individual Plan.
©2016 IHG Owners Association HOW TO PAY YOUR MEMBERSHIP DUES ONLINE AT OWNERS.ORG* (*ONLY A PRINCIPAL CORRESPONDENT (PC) FOR YOUR HOTEL(S) CAN RENEW/PAY.
People First System Enhancements Release 1 B Manager and Employee Workshop February 2006.
Patient Portal Website Patient Training Powered by the.
PEOPLESOFT TIMESHEET – SUPERVISOR TRAINING KCTCS Payroll Jefferson Community & Technical College.
ELISTING How to use eListing to conveniently and quickly file your personal property listing online. DEPARTMENT OF ASSESSMENTS King County To navigate.
Subcontractors and Suppliers Procedures for Receipt of Payment.
Section 3 Opportunities Employer Registration and Job Posting Instructions.
Child Care Subsidy Program Online Billing Provider Training Spring 2016.
Travel or Conference Training Sponsored by Classified Senate.
ACCESSING AND UTILIZING THE PROVIDER PORTAL MEDICAL AUTHORIZATION UNIT 1.
Attendance & Grading 1.Logging In & Navigating the Mail Menu 2.Viewing & Printing Your Attendance Roster 3.Creating TBA Schedules 4.Positive Attendance.
How To Use NCA’s Online Grant Application System.
Non-Tenure Track (NTT) Appointment Process (Preparer Edition) Version 1.0 Presented by the Office of Organizational Research and Data Management School.
Tutorials 2: Adding, Editing, or Re-sending an Assistantship This tutorial will cover the steps to create and edit an assistantship offer for a student.
Hiring Manager onboarding
c.net5 Online Management
Investing in good health at work
ePAR - Supplemental Pay
Supplier Connect (SCx) Training Material
Welcome to.
NextGen Purchasing Calendar Year End 1099 Process
Business Office Manager Training The ACH Process in 7 Steps
Diversity management system (DMS)
Presentation transcript:

Washington University Medical Center Campus Renewal Project MANDATORY BILLING MEETING JUNE 12, 2015 Presented by:

Washington University Medical Center Campus Renewal Project MEETING PURPOSE ACW thought it would be a great idea to explain the billing process in detail- in addition to providing the documents in the specifications. We hope to provide clarity and avoid subs/ suppliers having to revise and resubmit paperwork.

Washington University Medical Center Campus Renewal Project AGENDA  Initial Schedule of Values- Phillip Lee  Monthly Billing & Associated Forms- Rachel Hischke and Patty Plunkett  B2GNow- Precious Jackson and Kathy Hall  Workforce Audits  Payment Verification  Construction Forms Due Prior to the Release of Payment- Patty Plunkett  Closeout Documents-Phillip Lee  Final Payment Requirements-Rachel, Patty, Precious  Questions

Washington University Medical Center Campus Renewal Project INITIAL SCHEDULE OF VALUES Project Specification Section: A: Submit Schedule of Values to Construction Manager (for approval) at least 30 business days prior to submitting first application for payment, but in no case later than 20 business days after Notice of Award. –This info should be sent to

Washington University Medical Center Campus Renewal Project MONTHLY BILLING AND ASSOCIATED FORMS Specification Section: C: –AIA Cover Sheet / AIA Schedule of Values (012900B) –Affidavit of Subcontractor (012900C) –Lien Waiver (012900E / F) –No Change Order Received (012900I) –Subcontractor Safety Hours –If you are billing for stored material on AIA Form then you also need to submit: Photos Bill of Sale (Gross Value) Details list of what makes up the Stored Material Specification Section: C.1: –Extra work cannot be billed until a change order has been issued. All documents should be sent to by the 20 th of month. If that is a holiday or weekend, then submit the working day(s) prior.

Washington University Medical Center Campus Renewal Project AIA COVER SHEET

Washington University Medical Center Campus Renewal Project AIA SCHEDULE OF VALUES (SOV)

Washington University Medical Center Campus Renewal Project AIA SOV WITH SUBTOTALS

Washington University Medical Center Campus Renewal Project AFFIDAVIT

Washington University Medical Center Campus Renewal Project LIEN WAIVER

Washington University Medical Center Campus Renewal Project NO CHANGE ORDER RECEIVED

Washington University Medical Center Campus Renewal Project SAFETY HOURS

Washington University Medical Center Campus Renewal Project B2GNOW ACW Alliance/ Marks and Associates utilize “ B2GNow” software to: 1.Track workforce ( tier subs included) 2.Track Payments made to Subcontractors/ Suppliers IMMEDIATE ACTION ITEMS: Make sure all of your subs/suppliers are added to the system as a tier to you. –If you need to add subs/ suppliers contact Precious Jackson. If you or any of your subs/suppliers need login info, contact Kathy Hall If the instructions are not clear and you have questions, contact Kathy Hall. –Kathy and Precious will also offer B2Gnow training workshops for subs in the ACW Field Office ( for all subs/suppliers/ any tier) on Monday’s between 10:30am-12pm. Please schedule an appointment. Precious Jackson, ACW Kathy Hall, Marks and Associates

Washington University Medical Center Campus Renewal Project WORKFORCE AUDIT IN B2GNOW The workforce audits will be sent out at the beginning of EVERY month- auditing the workforce for the previous month. Workforce Audits are to be completed by the 20 th of month. Example: –The May Audit ( 5/1-5/31) was sent out on June 1 st and is due no later than 6/20. If you or your subs don’t have any work hours for the previous month, please login to the system and select the NO WORK option. Reasons your Audit will be rejected: –Not entering the ethnicity for ALL employees –Not entering the gender for ALL employees Important notes: 1.You must indicate if an employee is an APPRENTICE ! 2. If you have multiple contracts ( 1.20/ 1.30) please make sure you are putting the work hours under the correct contract ( See Instructions) ! 3. You are responsible for making sure your tier subs complete this information monthly!

Washington University Medical Center Campus Renewal Project HOW TO REPORT HOURS FOR WORKFORCE (PAGE 1 OF 5) 1. Log into the system>> Click on View>>My Workforce Audits. 2. Under View-- click on View. 3. Click on Fill in Audit.

Washington University Medical Center Campus Renewal Project HOW TO REPORT HOURS FOR WORKFORCE (PAGE 2 OF 5) 4. Fill out your hours for that payroll and click review. (Note : If you need to add employees, do so BEFORE completing the audit.)

Washington University Medical Center Campus Renewal Project HOW TO REPORT HOURS FOR WORKFORCE (PAGE 3 OF 5) 5. Review your total hours enter. When you are ready to submit your hours. Click Save and Certify. 6. Then sign your name and title>> Click Review.

Washington University Medical Center Campus Renewal Project HOW TO REPORT HOURS FOR WORKFORCE (PAGE 4 OF 5) 7. After you click review, check the box stating that what you are submitting is correct. Then click Certify and Release to the Organization Now.

Washington University Medical Center Campus Renewal Project HOW TO REPORT HOURS FOR WORKFORCE (PAGE 5 OF 5) 8. Click on view audit to see if your audit has been accepted.

Washington University Medical Center Campus Renewal Project HOW TO ADD EMPLOYEES (PAGE 1 OF 2) 1.Log into the system as a subcontractor 2.Click on Settings>>Employees

Washington University Medical Center Campus Renewal Project HOW TO ADD EMPLOYEES (PAGE 2 OF 2) 3. Click on Add Employee Required fields when adding a new employee: 1.Last name 2.First name 3.Position (should be populated with the union number) 4.Gender 5.Ethnicity 6.Zip Code 7.Click box, at the bottom of the screen, if the employee is an apprentice.

Washington University Medical Center Campus Renewal Project HOW TO ASSIGN AN EMPLOYEE TO AN AUDIT (PAGE 1 OF 1) 1. Click on>> Workforce Employee List>> and Assign Employee to Contract. 2. Fill out all the required fields then click review.

Washington University Medical Center Campus Renewal Project FOR COMPANIES WITH MULTIPLE CONTRACTS: HOW TO IDENTIFY WHICH CONTRACT YOU ARE REPORTING HOURS UNDER (PAGE 1 OF 2) 1. Log into the system>> Click on View>>My Workforce Audits 2. Under View-- click on View 3. The dropdown will only reflect the subcontractors that they are working under, Select the correct workforce audit you would like to complete.

Washington University Medical Center Campus Renewal Project FOR COMPANIES WITH MULTIPLE CONTRACTS: HOW TO IDENTIFY WHICH CONTRACT YOU ARE REPORTING HOURS UNDER (PAGE 2 OF 2) 4. Then you will be able to fill in the audit. Please remember to assign an employee to this contract. This is how your system is configured.

Washington University Medical Center Campus Renewal Project MONTHLY PAYMENT VERIFICATION IN B2GNOW The payment audit will be sent out once a month auditing : 1. The payment that you received from the party that you have a contract with. –Example- If you have a direct contract with ACW, the system is asking you to confirm the payment that ACW made to you. 2. The payments you made to your subs/ suppliers. Note: Regardless of when work was performed or billed, this audit is asking for payments received /paid in the month of the audit. Respond to the audit within 10 days of receiving the . Note: You will not be given credit for subs/supplier payments that have not been confirmed. It is your responsibility to make sure your subs/ suppliers are responding to the audits.

Washington University Medical Center Campus Renewal Project INSTRUCTIONS FOR VERIFYING PAYMENT (1 OF 5) 1. You will receive an from Marks & Associates

Washington University Medical Center Campus Renewal Project INSTRUCTIONS FOR VERIFYING PAYMENT (2 OF 5) 2. Select option 2- Login and Report

Washington University Medical Center Campus Renewal Project INSTRUCTIONS FOR VERIFYING PAYMENT (3 OF 5) 3.Once in the system>>go to Contract Audits>> Select the incomplete Audit you wish to complete>> you will end up here. 4.Select confirm payment received.

Washington University Medical Center Campus Renewal Project INSTRUCTIONS FOR VERIFYING PAYMENT (4 OF 5) 5. If the payment amount shown is correct, select correct. If the payment amount shown is incorrect, select incorrect. Note: If correct, you will be asked to provide the payment date. If incorrect, you will be asked to enter the correct amount paid or state that no payment was received.

Washington University Medical Center Campus Renewal Project INSTRUCTIONS FOR VERIFYING PAYMENT (5 OF 5) 6. Once the response is entered, check the box at the bottom of the page –stating that you are submitting accurate information. 7. Click “ Save”.

Washington University Medical Center Campus Renewal Project INSTRUCTIONS FOR REPORTING SUB/SUPPLIER PAYMENTS (1 OF 3) 1.Once in the system>>go to Contract Audits>> Select the incomplete Audit you wish to complete>> you will end up here. 2.Select report subcontractor payments.

Washington University Medical Center Campus Renewal Project INSTRUCTIONS FOR REPORTING SUB/SUPPLIER PAYMENTS (2 OF 3) 3. Click on- submit all incomplete records to report multiple payments at once.

Washington University Medical Center Campus Renewal Project INSTRUCTIONS FOR REPORTING SUB/SUPPLIER PAYMENTS (3 OF 3) 4. Enter all payments and payment dates. 5. At the bottom of the page- click save. This will send the audit to your subs/suppliers to confirm payment.

Washington University Medical Center Campus Renewal Project CONSTRUCTION FORMS VERIFICATION PRIOR TO PAYMENT (INCLUDING YOUR TIER'S) Safety –Weekly Safety Audits –Daily Equipment Inspections –PTSA’s –ILSM Forms Construction Operations –Daily Reports –Daily Quality Control Reports Diversity Reporting –Work Hours in B2GNow –Payment Verification in B2GNow

Washington University Medical Center Campus Renewal Project CLOSEOUT DOCUMENTS Project Specification Section A: At the time pay application reaches 75 percent complete, each Subcontractor shall submit to ACW one copy of a rough draft of all Closeout Documents. –This info should be sent to

Washington University Medical Center Campus Renewal Project FINAL PAYMENT REQUIREMENTS Specification Section: : –AIA Cover Sheet / AIA Schedule of Values (012900B) –Affidavit of Subcontractor (012900C) –Lien Waiver (012900G / H) –Tier Lien Waivers –No Change Order Received (012900I) –Closeout Documents –Final Diversity Payment Verification/ Final Workforce Data All documents should be sent to by the 20 th of month. If that is a holiday or weekend, then submit the working day(s) prior.

Washington University Medical Center Campus Renewal Project QUESTIONS? Thank You For Attending (Don’t forget to sign-in)