USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

L1 => L2 Optical Network Patch Panel Update Tim Durkin STFC RAL 03/04/2014.
Same mold in both front and back panel for reduced cost in mold making. Lip creates material for fasteners that will hold case together. LCD fits in with.
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
L1 Meeting 11/4/2004 – Mario Camuyrano BLS-to-ADF Transition System 230 ns 100 mV/div 200 ns/div Existing and proposed calorimeter trigger rack layouts.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
Magnetic Field Studies Dan Karmgard for the HCAL RBX Group.
DRAFT HCAL digital optic link and trigger mapping DRAFT.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Cable and Service Installation David Warner Colorado State University May 11, 2009.
HCAL Fall meeting Oct 11 to 13, 2004 HF assembly, commissioning and integration Ianos schmidt The University of Iowa.
Using Dijkstra’s Algorithm to Find a Shortest Path from a to z 1.
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
W. Smith, et al., U. Wisconsin, Oct 13, 2011 Calorimeter Trigger Upgrade- 1 Calorimeter Trigger Schedule M. Bachtis, A. Belknap, M. Cepeda, S. Dasu, E.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Tracker Summary Alan Bross MICE CM October 10, 2007.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
RM->HTR cabling organization pawel de barbaro, apr , Agreed on april-20, 2006.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Volume and Surface Area of a Rectangular Prism. Rectangular Prism #1 ●Length: 10 meters ●Width: 9 meters ●Height: 8 meters Work Volume: 8 x 9 x 10 = 720.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
25 Sept 2001Tullio Grassi From MAPLD2001 ( space community conference ) Major causes of failures.
2 Dec 1998F Harris LHCb Trigger Meeting L0 Trigger - ‘Real Estate’ Considerations Current thinking for the size and location of L0 trigger electronics,
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
9/29/2016E. Hazen - oSLB1 HO Trigger Links ● oSLB produced (69 pieces) – First few tested (by me) -- seem OK – Production testing to be done by student.
HF “Slice test box” installation
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
ETD summary D. Breton, S.Luitz, U.Marconi
CMS Area Working Group Meeting
HF “Slice test box” fabrication and installation
CMS November Upgrade Week
Preparation for Station Acceptance Test
Integration – preliminary ideas on routing and tests
Chamber Design and Integration RE3/1 and RE4/1
Fiber Installation for RUN 3&4
CDR Project Summary and Issues
HCAL Configuration Issues
SLB Synchronization in H4 Beam (LIP - Lisbon)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
4x5 SC array for the test beam in Apr 2007
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
You have three sets of 0–9 digit cards.
Front End Driver (FED) Crates and Racks +Tracker PSU racks
TOF & BB FEE Safety Review
FED Design and EMU-to-DAQ Test
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Experiment DAQ and trigger GMn SBS Collaboration Meeting
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack

Remapping of crates in USC55 necessary to reduce latency*.  = 0º is closest to electronics hall. Figures will updated in new document - and resubmitted. * ~wsmith/USC55_racks_v55.html

HTR to RTC crates organized for shortest paths Two sets of HF cables set the longest path.(<10m).

Remarks: We can organize our crates to have HTR to Cal Regional trigger cables less than 10 meters. (10 meter target proposed by trigger group). With 10 meter cables we have some room to change the organization of HB and HE HTR crates. We may want to do this for the following reasons: Unforeseen complexities with fiber mapping in the patch panels. This needs to be looked at in detail (including calibration readout). Optimize optic cable lengths. HF appears to be the longest, so I don’t believe that this would gain us much. This should be checked once solid HF length numbers are available. HO? Other reasons? With the information available to me at this time I have no objections to the trigger crate layout presented during electronics week, and believe that we can comfortably fit within the proposed 10 meter cable limit.