1 L1 => L2 Optical Network Patch Panel Update Tim Durkin STFC RAL 03/04/2014

2 Previous Talk

3 Layer 1 CTP 7 4 banks of CXP optical transceivers. Each Transceiver has 12 Tx Links and 12 Rx Links, all to the same optical connector. The Tx and Rx channels will be split before arriving at the patch panel. The patch panel will accommodate MPO12 input connectors. 36 cards 48 Tx links per card 1728 Links.

4 Layer 2 MP7 Mp7 has two banks of 36 Tx links, and two banks of 36 Rx Links. A total of 72 Tx and 72 Rx Links Tx and Rx are on separate MPO 48 cables in groups of 36. 12 Cards 72 links per card 864 Links

5 Topology The trigger requires optical connections from each Layer one card to each Layer 2 card. Each fibre ribbon must be split to individual links and merged with fibres from other cards prior to connection with a layer 2 card. CTP7 Layer 1 Card MP7 Layer 2 Cards

6 OPTICAL PATCH PANEL CONCEPT CTP7 Optical Splitter Optical Multiplexer MP7 MPO12 Tx link 11 Simplex links to other panels LC Simplex link MPT48 Tx link 35 Simplex links from other panels

7 8(MPO12=>LC quad) Sylex 1U splitter boxes. MPO12 connector mapped to LC quad outputs. Front panel can house 96 LC connections. 8 arrays can be housed in one box. 36 588,96 EUR Each Total 11779.20 EUR

8 2(LC quad => MTP48) 48 LC connections Routed to 1 MTP48 2 per unit. 72 links target available RX on MP7 therefore 1 unit per MP7. 19 needed to connect layer 2 plus 2 spares. 639.25 EUR Each Total 13424.25 EUR

9 CTP7 ……………………………………. 1 2 3 4 5 34 3536 ……………………………………. 1 2 3 18 2(LC quad => MTP48) 1 23 12 ……………………………………. MP7 12312 ……………………………………. MP7 19 MP7 13 8(MPT12=>12LC quad)

10 S2D11 Rack 30 U of optical components 15 U of cable management Total of 45 U About 2 meters height of equipment. 864 Tx links from layer one have no target component in the current plan. It is essential to make the accessible now for future use. Option one to place unused links at the bottom. 2(MPO48=>48LC) 8(MPO12=>12LC) Fully populated 8(MPO12=>12LC) LC Empty

11 S2D11 Rack Option two, make them uniformly accessible in the centre of the device. 2(MPO48=>48LC) 8(MPO12=>12LC) Fully populated 8(MPO12=>12LC) LC 50%

12 S2D11 Rack ‘+’ If all potential connections from the L1 cards are to be mapped onto L2 This would require 24 L2 MP7 and 63 U of rack space. 2.8 meters.

13 Cartridge Concept 45U of components, 30 U of boxes and 15U of cable management will be cabled and tested. Option 1 Do it all in the cavern, Simple to install but guaranteed mistakes.

14 Cartridge Concept Option 2 Cable and test LC connections on the surface and take the full assembly underground. Easy to debug in a comfortable environment, Hard to lift and install. Each component needs to be serviceable.

15 Costs Links Per ItemNo of ItemsTotal Links AvalableUsed LinksCost eachTotal HardwareCTP72436864 LinkMPO 24721728864EUR 121.00EUR 8,712.00 Hardware 4(MPT24=>LC quad) Box 96181728864EUR 589.00EUR 10,602.00 LinkLC Simplex864 EUR 6.14EUR 5,304.96 Hardware2(LC quad => MTP48) Box96121152864EUR 640.00EUR 7,680.00 LinkMPO48241152864EUR 304.00EUR 7,296.00 HardwareMP796121152864 EUR 0.00 LinkMPO48 => 12 MPO48124 EUR 1,500.00 HardwareMP7961 24 EUR 0.00 TotalEUR 41,094.96

16 Insertion losses TypeIL (dB)Total Loss (dB) 1CTP7=> MPO240.35 2MPO24=> MPO120.350.7 3LC=>LC0.351.05 4LC=>LC0.351.4 5MPO48 => MPO480.62 6MPO48=> MPO480.62.6 CTP7 MP7 5 6 Each connection has an associated loss This topology has 6 connections Estimated loss is 2.6 dB.

17 Tests March 2014 saw optical path tests Optical path lengths and connections are representative of the final system. a : 5mtr MPT patch cord b : MPO12 => 96 LC fan out c : 4 mtr OM3 patch cord 1.2 mm special with Kevlar d : LC96 => MPO48 fan in e : 4 mtr MPT48 patch cord This was not a cross linked system but a measurement of the contribution of the optical system to the bit error rate. MP7 a b c d e

18 Installation In 904 Not representative of the final system, 4 mtr patch cables to simulate longest reach.

19 BER BER is of order 10 -16 Measured with a 7 bit pseudorandom binary sequence. Eye is Clean.

20 And Now….. I have to change direction We no longer have the space

21 Molex FlexPlane OM3 Fibre Laid on Kapton Substrate by robot http://www.molex.com/molex/products/family?channel=products&chanName=family&key=flexplane trade

22 12 X 12 matrix routes 12 channels from input side to common connectors on the output side.

23 Three 12 to 12 Units will provide 36 inputs each with 12 channels, giving a total of 432 Links.

24 MPO 48 to 3 x MPO12 Fan-out trunk cable is used to bring groups of three signals together on one single MPO48 connector. Each MPO 48 connector has 36 links all originating from the same position of each input connector. MPO 48 with 36 connections

25 INPUT: 2 x(12 x12) units housed in one 1U box provide 24 MPO-12 inputs (288) 3 of these boxes provides the required 864 input links. OUTPUT: A multiplexer cable takes an MP0-12 from each box (36 total) into 1 MPO-48 to the MP7. Two multiplexer cables are required per MP7 to provide the 72 input links. MPO 48 with 36 connections

26 Why? LC => LC system costs time, money and space. 35 U high 3 U Both have a lead time of 16 weeks from PO. LC => LC System ItemQuantityCostSub 1U ODF, 2xMTP 48F - 96xLC OM3126407680 1U ODF, 8xMTP(M) 12F - 96xLC OM396856165 Cable Management1230360 LC LC patch Cables900119900 Cartrage15000 Total29105 FlexPlane System ItemQuantityCostSupplierSub 2 x 12 x 123343810314 3xMPO12 => 1xMPO48244009600 19914