OLYMPUS U.Schneekloth/R.Beck PRC closed session 6.05.2009.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
EMCal DCS and related Issues with Shutdown/Installation B. S. Nilsen M. Cherney J. Fujita.
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
Projected results for OLYMPUS 1000 hours each for e+ and e- assuming two (of eight) sectors instrumented and Lumi = 2 x cm -2 s -1 – 100 mA on 3.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
DESY PRC May 10, Beyond the One Photon Approximation in Lepton Scattering: A Definitive Experiment at DESY for J. Arrington (Argonne) D. Hasell,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Richard Milner April 22, Internal Target Experiment at DORIS Proposal of a new experiment at DORIS using the available MIT-BLAST detector and.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
Intermediate Frame for Olympus Interface from Blast Frame to Argus rails Track gauge of Blast is 4645 mm while track of Argus is 3200 mm. We want to keep.
DESY PRC May 10, Status of OLYMPUS -Project DESY PRC MAY 5, 2009 OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the.
Richard MilnerDESY April 6, OLYMPUS Overview Motivation for the experiment Progress to date on the experiment The path forward.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Center for Academic Success Budget Committee Request for Winter & Summer
Budget Update November 7, DISCUSSION ITEMS:
1 SciBar for Booster Neutrinos T. Nakaya (Kyoto) March 30, 2005.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
1 Referee Report Olympus Elke Aschenauer Desy PRC, April 2011.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
3/14/20131 PHENIX WEEKLY PLANNING 3/14/2013 Don Lynch.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Ian Bird LCG Project Leader Updating the Resource Planning for 2009/2010.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
News from DESY. Joachim Mnich Plenary ECFA CERN, November 2011.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Haixin Huang AGS Cold Snake: Status and Plans.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Accelerator Support and Maintenance Startup for Run 13.
VELO Replacement Girish Patel University of Liverpool.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Muon Ionisation Cooling Experiment Overview
S1G Experiment Schedule Plan
Bending crystals for magnetic and electric dipole moment measurements
KEK news ( ) S.Tanaka.
Installation of an Instrument on a CERN machine
Overview of LERF Status, Plans and Goals
The SABRE Crystals Frank Calaprice.
DESY Test Beam Facilities - Status and Plan
THE GRANT-MAKING PROCESS
A. Herlert, CERN PH-SME-IS
Teleconference ACS – FREIA 20th February 2018
THE GRANT-MAKING PROCESS
StayTreat Wrap Up OPS 2015 StayTreat.
Presentation transcript:

OLYMPUS U.Schneekloth/R.Beck PRC closed session

OLYMPUSU. Schneekloth/R.Beck2 OLYMPUS Approval Recommended by PRC in Oct. 2008, provided funding Approved by DESY directorate in Dec subject to schedule for installation and running and necessary funding

OLYMPUSU. Schneekloth/R.Beck3 Schedule Remove ARGUS experiment in Summer 2009 Disassemble and pack BLAST detector Jan.-March 2010 Ship and assemble BLAST/OLYMPUS detector and OLYMPUS target in spring-fall 2010 Modify DORIS beam-line and install OLYMPUS target in DORIS in winter 2010/11 shutdown. OLYMPUS commissioning in parking position winter-summer 2011 Install complete OLYMPUS experiment in summer 2011 Commission in fall 2011 Parasitic mode and some dedicated shits during service weeks Take data in 2012 Schedule discussed/agreed with DESY M, FS and FH directors

OLYMPUSU. Schneekloth/R.Beck4 Schedule Milestones

OLYMPUSU. Schneekloth/R.Beck5 Schedule

OLYMPUSU. Schneekloth/R.Beck6 Schedule Background studies Parasitic studies + some days (~5) full operation

OLYMPUSU. Schneekloth/R.Beck7 Cost Estimate – Operation OLYMPUS

U. Schneekloth/R.Beck8 Cost Estimate – Investments

OLYMPUSU. Schneekloth/R.Beck9 Cost Estimate – Investments

OLYMPUSU. Schneekloth/R.Beck10 Cost Estimate – Investments Possible in-kind contributions of institutes Cooling system (design, ordering, setup,…) Cabling from power supply to toroid Polarity switches (assembly in workshop) Modification of vacuum system Send technicians (ARGUS removal, modification of IR,…) Presently about 500 – 600k€ Could save about 100k€ in power costs in case of early modification of quads