AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY, 09.12.2013.

Similar presentations


Presentation on theme: "AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY, 09.12.2013."— Presentation transcript:

1 AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY, 09.12.2013

2 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 2 Outline AHCAL Status Report Mechanics and test beam setups 1.DESY II test beam setup 2.PS/SPS AHCAL test beam setup 3.PS/SPS AHCAL Tungsten test beam setup 4.AHCAL cabling and cooling setup 5.AHCAL absorber structure modification (earth quake)

3 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 3 AHCAL Status Report Mechanics and test beam setups 1.DESY II test beam setup 2.PS/SPS AHCAL test beam setup 3.PS/SPS AHCAL Tungsten test beam setup 4.AHCAL cabling and cooling setup 5.AHCAL absorber structure modification (earth quake)

4 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 4 AHCAL DESY II test beam setup 15 pieces 1xHBU housings are produced at DESY 15 HBU´s with CIB´s has to be mounted and commissioned all 15 layers will be tested with air stack

5 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 5 AHCAL DESY II test beam setup DESYII TB22 1 t Stage Air Stack Absorber stack with 5 layers

6 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 6 Task list (Summary): > Test beam setup  position inside the TB 22 allows parasitic measurements up to KW10 2014  test beam schedule fixed KW1+2 2014  supply and read out hardware ongoing  15 layer absorber structure installed  1 t DESY II Stageinstalled  15 layer air stack ready > Detector layer production  production of 15 pieces 1xHBU housingsready  production of 15 HBU´s and install tiles6 done  commission and beam test in air ongoing AHCAL DESY II test beam setup

7 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 7 AHCAL Status Report Mechanics and test beam setups 1.DESY II test beam setup 2.PS/SPS AHCAL test beam setup 3.PS/SPS AHCAL Tungsten test beam setup 4.AHCAL cabling and cooling setup 5.AHCAL absorber structure modification (earth quake)

8 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 8 AHCAL PS/SPS AHCAL test beam setup Movable Stage with 2 x absorber stack Air stack 2 x absorber stack stand alone Tungsten setup layers Movable stage with 1 x absorber stack

9 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 9 Task list (Summary): > Test beam setup  position inside PS/SPS?  test beam schedule?  supply, read out and cooling schemeongoing  install absorber structure self standing or with Movable Stage?  install new GUI for Movable Stage controlongoing > Detector layer production  production of 2 x 50 x 2xHBU-extended housings (MPI)ongoing  production of 2 x 48 x 2 HBU´s and install tiles?  production of 10 x HBU dummy's?  commission and test ? AHCAL PS/SPS AHCAL test beam setup

10 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 10 AHCAL Status Report Mechanics and test beam setups 1.DESY II test beam setup 2.PS/SPS AHCAL test beam setup 3.PS/SPS AHCAL Tungsten test beam setup 4.AHCAL cabling and cooling setup 5.AHCAL absorber structure modification (earth quake)

11 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 11 AHCAL PS/SPS AHCAL Tungsten test beam setup aluminum frame with 2 x 1 mm FR4 cover to center the housing tungsten area Al frame parts produced at MPI

12 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 12 AHCAL PS/SPS AHCAL Tungsten test beam setup housing with SIB housing with CIB SIB CIB production of 0,5 mm thin stainless steel housings by MPI

13 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 13 AHCAL PS/SPS AHCAL Tungsten test beam setup special configuration with extender board 4 HBU´s per layer

14 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 14 AHCAL PS/SPS AHCAL Tungsten test beam setup 50 frames frame with housings closed housings removed cover plate

15 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 15 AHCAL PS/SPS AHCAL Tungsten test beam setup 40 tungsten absorber plates are installed Install Tail catcher ? Tail Catcher Instrumentation? add 8 tungsten absorber plates ?

16 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 16 AHCAL PS/SPS AHCAL Tungsten test beam setup Modification of the tungsten absorber structure ?

17 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 17 Task list (Summary): > Test beam setup  configuration 48 layers ?  test beam schedule ?  supply, read out and cooling preparationongoing  modify tungsten absorber structure ?  Tail Catcher installation ? > Detector layer production  production of 50 frame parts (MPI) and mounting with facing (DESY) ready  production of 2 x 50 x 2xHBU-extended housings (MPI)ongoing  production of 2 x 48 x 2 HBU´s and install tiles?  commission and test ? AHCAL PS/SPS AHCAL Tungsten test beam setup

18 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 18 AHCAL Status Report Mechanics and test beam setups 1.DESY II test beam setup 2.PS/SPS AHCAL test beam setup 3.PS/SPS AHCAL Tungsten test beam setup 4.AHCAL cabling and cooling setup 5.AHCAL absorber structure modification (earth quake)

19 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 19 AHCAL cabling and cooling setup power distribution Power cabling for 1 x submodul LDA

20 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 20 AHCAL Status Report Mechanics and test beam setups 1.DESY II test beam setup 2.PS/SPS AHCAL test beam setup 3.PS/SPS AHCAL Tungsten test beam setup 4.AHCAL cabling and cooling setup 5.AHCAL absorber structure modification (earth quake)

21 Karsten Gadow | AHCAL main meeting | 09.12.2013 | Page 21 AHCAL absorber structure modification (earth quake) Simulation for AHCAL barrel and end cap structure must be done soon! ILD workshop, Cracow, 24-26 September 2013


Download ppt "AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY, 09.12.2013."