Presentation is loading. Please wait.

Presentation is loading. Please wait.

Intermediate Frame for Olympus Interface from Blast Frame to Argus rails Track gauge of Blast is 4645 mm while track of Argus is 3200 mm. We want to keep.

Similar presentations


Presentation on theme: "Intermediate Frame for Olympus Interface from Blast Frame to Argus rails Track gauge of Blast is 4645 mm while track of Argus is 3200 mm. We want to keep."— Presentation transcript:

1 Intermediate Frame for Olympus Interface from Blast Frame to Argus rails Track gauge of Blast is 4645 mm while track of Argus is 3200 mm. We want to keep the Argus rails. Height difference of rails is that we can arrange an intermediate frame. In grey : intermediate frame Jan Hauschildt, MEA1, 23th Februar 2010

2 in orange: Blast frame in grey:Intermediate frame in red: Argus rails with concrete foundation in green:Argus carriage, probable to be replaced by Blast carriage Jan Hauschildt, MEA1, 23th Februar 2010

3 Status Basic design made Still to produce workshop drawings Need to purchase Aluminum U-Beams (which is apparently impossible for this size in Germany) Conntacted Jim Kelsey for supply by MIT Beams to be shipped with the first container and to be machined in Hamburg Machining and assembling takes abt. 3 weeks Jan Hauschildt, MEA1, 23th Februar 2010

4 Cable Routing Olympus view in direction of the beam in red: signal and power, rucksack to detector in green: power to coils In blue: cables to rucksack in tankchain Olympus in beam position Jan Hauschildt, MEA1, 23th Februar 2010

5 topview in red: signal and power, rucksack to detector in green:power to coils In blue: cables to rucksack in tankchain Jan Hauschildt, MEA1, 23th Februar 2010

6 Viewfrom ringoutside in red: signal and power, rucksack to detector in green: power to coils In blue: cables to rucksack in tankchain Signal and power from rucksack to detector will be on a fixed cablebridge which moves with the rucksack Power cables to coils run on the floor of the pit and are connected to manifolds on detector halves. Cables are to be reconnected when detector was moved from parking position to beam. Cables to rucksack are running in a tankchain which is situated on the hall floor in beam upstream direction Jan Hauschildt, MEA1, 23th Februar 2010


Download ppt "Intermediate Frame for Olympus Interface from Blast Frame to Argus rails Track gauge of Blast is 4645 mm while track of Argus is 3200 mm. We want to keep."

Similar presentations


Ads by Google