Uli Schäfer 1 JEM Test Strategies Current plan: no JTAG tests at R&S  initial tests done at MZ Power-up / currents Connectivity tests (JTAG) per (daughter)

Slides:



Advertisements
Similar presentations
Uli Schäfer Trigger Status JEP (JET/ENERGY PROCESSOR) Komponenten JEM0 (JET/ENERGY MODULE) -Hardware -Firmware JEM1 nächste Tests / Termine Production.
Advertisements

System Design GroupInstrumentationViraj PereraRAL2-March-01 Prototype ROD Prototype ROD (6U VME) – Requirements 4 channel (CPMs) prototype Perform zero.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 BLT – status – plans BLT – backplane and link tester Recent backplane test results Test plans – week June 15.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Cluster Processor Module : Status, test progress and plan Joint Meeting, Mainz, March 2003.
Uli Schäfer JEM Plans Status (summary) Further standalone tests Sub-slice test programme JEM re-design Slice test.
Uli Schäfer JEM0 Status (summary) 3 JEM0s up and running: JEM0.0 used for standalone tests only (Mainz) JEM0.1 fully qualified module0 JEM0.2 (like JEM0.1.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
5th April, 2005JEM FDR1 Energy Sum Algorithm In all stages saturate outputs if input is saturated or arithmetic overflow occurs Operate on 40Mb/s data.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer JEM0 (*) JEM0 Hardware : overview, history, and status JEM0 Firmware : algorithms, status JEM – plans and timescale (*) Module0 specifications.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
5th April, 2005JEM FDR1 JEM FDR: Design and Implementation JEP system requirements Architecture Modularity Data Formats Data Flow Challenges : Latency.
Uli Schäfer 1 CP/JEP backplane test module What’s the maximum data rate into the S-CMM for phase-1 upgrade ?
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
Uli Schäfer JEM Status and plans RAL test results Hardware status Firmware Plans.
Uli Schäfer JEM1 In input modules T,S probably mix of φ-bins 5,6 due to routing problems of high-speed LVDS links With current algorithm rounding errors.
Uli Schäfer JEM hardware / test JEM0 test programme Mainz standalone RAL sub-slice test JEM re-design Heidelberg slice test.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 (Not just) Backplane transmission options.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
Uli Schäfer JEM Status and plans Algorithms Hardware JEM0, JEM1 Tests Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
JEP HW status and FW integration plans Uli Schaefer and Pawel Plucinski Johannes-Gutenberg Universitaet Mainz Stockholm University.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Uli Schäfer 1 JEM configurator progress FPGAs are RAM-based programmable logic devices Need to be loaded with a ‘configuration’ after power-up, so as to.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
Uli Schäfer 1 JEM Status and plans Hardware -JEM1 -Status Firmware -Algorithms -Status Plans.
E. Hazen – FNAL – 5 Apr 2004 L1CTT DFEA Motherboard / Daughterboard Design, Cost, Schedule 4.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Multistep Runs with ROD Crate DAQ Murrough Landon, QMUL Outline: Overview Implementation Comparison with existing setup Readout Status ModuleServices API.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
CMX Collection file for current diagrams 30-Apr-2014.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
General Tracker Meeting: Greg Iles4 December Status of the APV Emulator (APVE) First what whyhow –Reminder of what the APVE is, why we need it and.
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 4 Report Tuesday 22 nd July 2008 Jack Hickish.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
Firmware development for the AM Board
Production Firmware - status Components TOTFED - status
Online Software Status
Online Software “To Do” List
CPM plans: the short, the medium and the long
Presentation transcript:

Uli Schäfer 1 JEM Test Strategies Current plan: no JTAG tests at R&S  initial tests done at MZ Power-up / currents Connectivity tests (JTAG) per (daughter) module Signal integrity: DCI / 1 test pin per bank, scope Interface tests w. firmware pattern detection per module (?), per JEM System tests w. simulation and S/W comparison, per crate (MZ, RAL??) Full system test, 2 crates, PPR/ROS (  commissioning)

Uli Schäfer 2 1.LVDS in 2.SMM out 3.JMM out 4.DAQ 5.ROI 6.FIO VME, CAN,TTC, JTAG, diagnostic clock out JEM Interfaces

Uli Schäfer 3 JEM Test Setup Power-up, JTAG: Lab equipment available(?) Pod available (want another, USB based?) S/W : Tools available, test vectors to be written (BB/NN) Test adapters : design under way (status?), separate adapters required for main board (CM,RM,IM,BPL,CF,TTCdec), input modules, ?? Interface tests : High rate, F/W pattern detection where possible S/W filling playback (and comparison) memories and reading out error counters

Uli Schäfer 4 JEM Test Resources Setup: signal source  JEM  sink Sources: DSS (available, 16 ch., buffers ~64k deep ?) LSM 96ch. (to be supplied by B’ham soon?, ~ k deep) PPr schedule unclear (components for first 4 PPMs available soon ? LCD status? 128 deep?) Playback memories (256 deep, circular buffers) Do we want to have standalone 24-ch. Input daughter tester ? Sinks – pattern detection: no per-event readout; counters only – internal spy (256 deep, circular buffers): Jet FIO spy JMM spy ? ROI spy ? SMM spy DAQ spy (L1A triggered !)

Uli Schäfer 5 JEM Test Resources External sinks At RAL: CMM / ROD / ROS (no spy  L1A-triggered) ROD / ROD emulator (spy ?-deep) CMM spy (128-deep) CMM parity check (counters) Any new test adapter to be built ? We will have a mixture of non-event related counter readout, circular buffer readout from spy memories and L1A-triggered readout. How do we set up the timing / how do we feed the simulation / comparison with the proper time slices ?

Uli Schäfer 6 JEM Test baseline Interface tests Supported sources Supported sinks System tests Supported sources Supported sinks Who will define aggressive test patterns ? Any specific software required for final tests beyond full-crate tests ? Time scale ?