TRD dcs workshop, Heidelberg, Jan 22, 2007 1 TRD Feeserver/controlEngine Kai Schweda, University of Heidelberg R. Bramm, B. Doenigus, T. Dietel, D. Emschermann,

Slides:



Advertisements
Similar presentations
TRD-DCS Workshop, Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom.
Advertisements

Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of the FeeCom software Benjamin Schockert.
Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status of theFedServer Benjamin Schockert Sebastian.
The Detector Control System – FERO related issues
TPC electronics meeting, /14 Zentrum für Technologietransfer und Telekommunikation FH-Worms FeeCommunication Chain Status.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Test Systems Software / FEE Controls Peter Chochula.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Dariusz Miskowiec, TRD status meeting Oct alignment... i.e. how to figure out where the detectors are, and how to use this knowledge in the reconstruction.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
Normal text - click to edit FeeServer: (version 0.9.2) ( ) S. Bablok (IFT, University of Bergen)
Normal text - click to edit FeeCom software during TPC commissioning (Benchmarks) Sebastian Bablok Dag Toppe Larsen Matthias Richter Benjamin.
Jorge Mercado - I3HP Topical Workshop - St. Andrews The ALICE Transition Radiation Detector (TRD) Read-Out Electronics J. Mercado Physikalisches.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
RMS Importer/Exporter Create configuration for the MedAustron Control System PP a-ABR_RMSImporterExporter.pptm abrett/mmarchha RMS Importer/Exporter.
July test beam DAQ status Marcin Byszewski Konstantinos Ntekas.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
Application Protocol for Veris E30 Panel-board Monitoring System Jaein Jeong UC Berkeley LoCal Workshop Oct 5 th, 2009.
MDT PS DCS for ATLAS Eleni Mountricha
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
Input/Output 2 What is I/O? How we get the CPU to communicate with devices From the computer’s point of view, it’s just 1’s and 0’s Gets interpreted.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Registers are always 32 bit / 4 byte memory is accessed directly when memory cannot be accessed kind of flag is on.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Communication Layers Protocol Commands Results Command Specs Command Framework Database Access PVSS Server TOC ,
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Status of InterCommunication on FeeControl Meeting Report Communication between DCS-Layers State of Sebastian Bablok Christian Kofler Ralf Keidel.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Source Controller software Ianos Schmidt The University of Iowa.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,
Clara Gaspar, December 2012 Experiment Control System & Electronics Upgrade.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
TELL1 command line tools Guido Haefeli EPFL, Lausanne Tutorial for TELL1 users : 25.February
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
Clara Gaspar on behalf of the ECS team: CERN, Marseille, etc. October 2015 Experiment Control System & Electronics Upgrade.
Optical Readout Interface (ORI)
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
TPC CRU Jorge Mercado (Heidelberg) Ken Oyama (Nagasaki IAS) CRU Team Meeting, Jan. 26, 2016.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Software for tests: AMB and LAMB configuration - Available tools FTK Workshop – Pisa 13/03/2013 Daniel Magalotti University of Modena and Reggio Emilia.
of the Upgraded LHCb Readout System
University of Wisconsin at Madison
SPD DCS Overview & FED Server
LinkBox Access Application
Presentation transcript:

TRD dcs workshop, Heidelberg, Jan 22, TRD Feeserver/controlEngine Kai Schweda, University of Heidelberg R. Bramm, B. Doenigus, T. Dietel, D. Emschermann, M. Kessenbrock, T. Krawutschke, C. Lippmann, J. Mercado, M. Neher, K. Oyama, B. Schockert, J. Steckert, G. Tsiledakis

TRD dcs workshop, Heidelberg, Jan 22, B. SchockertT. Dietel, R. BrammM. Kessenbrock, K. Oyama V. Angelov T. Krawutschke C. Lippmann J. Mercado K. Oyama K.S. J. Mercado, G. Tsiledakis #1 User: 1 PVSS/FSM #2 Intermediate: 1 InterCom + DB #3 540 DCS boards 8(6) ROBs each: ControlEngine / FeeServer FEE Chain (3 Layers) FED Server FEE Client InterCom Layer Config. DB PVSS (DIM - Client) FEE Server Command Coder PVVS-Inject

TRD dcs workshop, Heidelberg, Jan 22, Communication w/ MCMs  Single Read/Write to MCM  Verify frame content  Fast Read implemented  10-20x faster  Implement FastWrite for config  ? More than 2 broken MCMs/scsn links : addressing is more complicated (Tom, Ken) dcs board dcs-board Frame MCMAddress:7f Source Bit:1 HopCounter:24 Command:0a Address:e43a Data: Scsn-link

TRD dcs workshop, Heidelberg, Jan 22, Chamber Testing  Check communications lines  Check memory on MCM  Check NI/readout lines  Check ORI  output in dataBase format  lots of code from robTester (Jorge)  scripts (Ken, Tom)  user interface (Jorge)  logging to PVSS (Andreas, Uwe)  Feeserver ACK (Sebastian, Benjamin)

TRD dcs workshop, Heidelberg, Jan 22, Optical Readout Interface  Readout: HalfChamberMerger to ORI checked by controlEngine (jtag)  Read EEPROM (ORI configuration)  Write EEPROM (Venelin)  Check LTC (Venelin)

TRD dcs workshop, Heidelberg, Jan 22, Chamber Configration  send standard config to chamber  ! Could not take data at CERN  Need individual patches, e.g. for dead MCM  Patchmaker (Ken, Tom)  small changes in controlEngine

TRD dcs workshop, Heidelberg, Jan 22, Data Points  chamber status information to PVSS provided by dataPoints, e.g. low voltages, configuration, dead MCM, high temperature  offline needs part of information  list of parameters for all TRD-DCS (Dariusz, Raphaelle)  more discussion (All)

TRD dcs workshop, Heidelberg, Jan 22, Wishlist…  Implement FastWrite for chamber configuration  Fix acknowledge channel (Sebastian, Benjamin, Tom)  Enable writing to ORI EEPROM (Venelin)  Read LTC information (Venelin)  implement more data points, e.g. new MCM-temps (Uwe)  Clean up code (Uwe)  Logging to PVSS (Uwe, Tom)  Patchmaker for chamber configuration (Ken, Tom)  crc32 checksums on TRAP chip (Venelin)