Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 Monitor of Isobutane Content in the RPC Gas Mixture Changguo Lu, Kirk McDonald Princeton University (10/22/2008)
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
E.H. #1 RPC Gas System Commissioning  “Leaky” modules’ study 1 Changguo Lu, Princeton University Qingmin Zhang, IHEP Shih-Kai Lin, University of Houston.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
1 April 7, 2009 C. Lu Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
C. Lu, K.T. McDonald RPC Gas System Final Design Review April 11, 2008 Daya Bay RPC gas system fire safety issue Slides from Gas System FDR + a few more.
C. Lu, RPC Gas Slow Control Workshop, 6/10/2009, CUHK 1 1 RPC gas system slow control (CUHK, 6/10/2009) Changguo Lu Princeton University.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
July 29, Update on the HBD Gas System Modifications Robert Pisani Brookhaven National Laboratory.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Setting up the Ricoh C305 Press F5 to start the Presentation
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
MDC Silicon meeting 24 July 03 1 Run IIb SiliconTemperature Monitoring  The basic philosophy is to build on Run IIa experience and make only minor changes.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
PHENO 2010 Christopher White, IIT 1 The Daya Bay Reactor Antineutrino Experiment Christopher White 1.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
RPC Gas System Operation Report for October, Changguo Lu, Hansheng Sun.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 Work report ( ) Haoqi Lu IHEP Neutrino group
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
PIXEL CAEN Installation Status
LKr status R. Fantechi.
UK CMS Oversight Committee Mtg
Limited Streamer Tube Project Summary
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation plan from last Muon installation workshop (July 14, 2010, IHEP):

Progress of gas system installation DYBProject-doc-409 (Installation of RPC gas system in the gas mixing room w/o Isobutane) 2Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Submitted TCF forms for gas system installation and received approval: DYBProject-doc-409-v4

TCF forms for gas system installation 3Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 DYBProject-doc-410 (Installation for two gas chromatograph systems)

List of the work done so far 1.Install gas mixing and control crates in gas room As we planed the gas mixing and control crates have been installed in gas room. 4Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010

List of the work done so far (cont’d) 2. Install two gas chromatograph systems Bruker field service engineer Hong Xiangdong came to Daya Bay EH#1 on 10/11 to install the GC. One GC is working properly, the other GC has a defect electro- magnetic valve (leak) that needs to be replaced. The replacement part will be delivered in 4 to 6 weeks. 5Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Luo Xiaolan and Xu Jilei are using the GC to analyze the gas sample from AD (see next page for the test result).

GC test result for gas sample from AD Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/20106

Temporally install the gas distribution/digital bubblers in gas room and test Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/20107 The gas distribution/digital bubblers eventually will be installed on the RPC module supporting structure. Since the utility installation work on the supporting frame has not started yet, for the testing purpose we have to install gas distribution/bubblers in the gas room. All 7 sets of gas distribution/digital bubblers crates are mounted on one rack as shown on left. Filled with silicon oil, all channels are bubbling. When AD’s white oil arrives we’ll replace the present silicon oil with the white oil to reduce the viscosity, thus to improve the quality of the bubble.

Gas switchover panels, manifolds and pipes Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/20108 IHEP gas system installation team, lead by Sun Hanshen, has performed superb job to install all these utilities.

Gas switchover panels, manifolds and pipes (cont’d) Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/20109

Remaining jobs for the first step of gas system installation Daya Bay Muon System Installation Workshop, Daya Bay, 10/18/ Thoroughly check the leakage of the gas system and make a report to Daya Bay LSO/SO, if approved we’ll bring Isobutane into the system and bring the full gas system into operation; W/O Isobutane we’ll run the system continuously to test its stability; Work with DGUT group connect gas system signal cables into their Detector Control Interface Box and check the signal correctness; Running bubbler readout GUI program, check its stability; Running GC sequence at the same time with the bubbler GUI, check there is no interference. If everything mentioned here is going well, we’ll be ready to move on to the next step of gas system installation: Install gas distribution/digital bubbler system onto RPC supporting platform; laying gas tubing into the utility tray under the supporting frame; ….

Special thanks to Strong support from LIM Xiaonan; US/China LSO/SO; IHEP gas installation team, especially its group leader Sun Hanshen; BNL group for handling the gas system shipment and delivering the entire gas system into the E.H. #1 gas room w/o breaking a single piece of equipment; IHEP graduate student Xu Jilei to participate the entire gas system installation. Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/201011